DIAMOND DRILLING BEGINS AT BONDOUKOU GOLD RIDGE
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
DALAROO STARTS FIRST DIAMOND HOLE BENEATH
BONDOUKOU GOLD DISCOVERY
First of five holes in a ~1,750 m programme tests the Wilfred discovery; second rig
expected at the northern section by end-November.
Highlights:
• Diamond drilling is underway at Wilfred: Hole BDDD001 was collared on 17 November 2026 to test
directly beneath the discovery intersection in BDRC002 of 18 m at 7.31 g/t Au from 63 m, including 12 m
at 8.66 g/t Au from 69 m (downhole widths)6
.
• First hole to test beneath the discovery: BDDD001 (previously referred to as FUDD0019
) is designed to
test beneath the high-grade discovery intersection in BDRC002 and is planned to approximately 350 m
at −60°, well beyond the 210 m depth at which BDRC002 was terminated.
• Following up high-grade maiden RC results: Maiden reverse circulation (RC) drilling at Wilfred returned
significant gold intersections (downhole widths), including:
o 18 m at 7.31 g/t Au from 63 m in BDRC002, including 12 m at 8.66 g/t Au6
;
o 23 m at 2.14 g/t Au from surface in BDRC0016
;
o 13 m at 2.67 g/t Au from 87 m in BDRC010C, including 6 m at 4.19 g/t Au8
; and
o 60 m at 0.85 g/t Au from 148 m in BDRC011B, including 11 m at 1.62 g/t Au8
.
• Five holes for ~1,750 m: The initial programme comprises BDDD001 and four additional holes to test
down-dip and along-strike extensions of the mineralisation in BDRC001 and BDRC002, with two holes
planned on each of two step-out sections approximately 80 m north-west and south-east of the
discovery9
.
• First oriented diamond core from Gold Ridge: Diamond core will provide the first direct structural
measurements from the Project, needed to determine the orientation, true width and continuity of the
mineralisation, which are not yet known.
• Second rig due by the end of November 2026: Under a two-rig contract for an estimated 20,000 m of
diamond drilling9
, the second Easy Drill rig will test the northern section approximately 1.25 km from the
discovery, where RC drilling returned 13 m at 2.67 g/t Au from 87 m in BDRC010C and 60 m at 0.85 g/t Au
from 148 m in BDRC011B8
.
• Corridor-scale work continuing: The 35 line-km Induced Polarisation (IP) and resistivity survey is
underway across the Wilfred, Mag and Ali targets10
, and first-phase RC drilling is expected to be
completed within the next seven days, with three holes remaining at Mag.
Dalaroo Metals Limited (ASX: DAL, OTCQB: DALMF) (“Dalaroo”or“the Company”) is pleased to announce that
diamond drilling is underway at the Wilfred target, within its flagship Bondoukou Gold Ridge Project in north-
19 November 2026
2
dalaroometals.com.au | ASX: DAL
eastern Côte d’Ivoire, six weeks after the Company announced a high-grade gold discovery from its maiden RC
drilling.
The first hole, BDDD001, commenced on 17 November 2026 (Figure 1) and is designed to test beneath the 18 m
at 7.31 g/t Au intersection in BDRC002 (downhole width)6
. It is the first of an initial five-hole programme totalling
approximately 1,750 m that will test down-dip and along-strike extensions of the gold mineralisation intersected
in BDRC001 and BDRC002 at the Wilfred target9
.
Drilling is being undertaken by Easy Drill SARL under a contract for an estimated 20,000 m of diamond drilling
using two rigs9
. A second rig is expected on site by the end of November 2026 to commence follow-up drilling on
the northern BDRC010C–BDRC011B section, approximately 1.25 km from the original discovery, where RC
drilling intersected 13 m at 2.67 g/t Au from 87 m in BDRC010C and 60 m at 0.85 g/t Au from 148 m in BDRC011B8
.
The diamond programme is proceeding alongside the 35 line-km IP and resistivity survey, which is now underway
across the Wilfred, Mag and Ali targets within the approximately 7 km gold-anomalous corridor4,10
.
The first phase of the RC drilling programme is in its final stages, with three holes remaining at the Mag target. RC
drilling is expected to be completed within the next seven days, after which all follow-up drilling will be
undertaken using diamond rigs9
.
For further information about Dalaroo, please click here.
Figure 1. Diamond drill rig collaring BDDD001, the first follow-up hole at the Bondoukou Gold Ridge Project.
3
dalaroometals.com.au | ASX: DAL
Management Commentary
Dalaroo Chief Executive Officer, John Morgan, commented:
“Six weeks ago, our maiden drilling at Wilfred returned 18 metres at 7.31 g/t gold. Today a diamond rig is drilling
directly beneath that intersection, and that is a major milestone for Dalaroo.
“BDDD001 will tell us whether the high-grade zone continues at depth, and the step-out holes on either side will
tell us whether it continues along strike. Just as importantly, oriented core will give us our first direct
measurements of the structures controlling the gold, so we can establish the orientation and true width of the
mineralisation and design subsequent holes with confidence.
“A second rig is due by the end of November to follow up the northern section approximately 1.25 km away. We
will then have two diamond rigs testing two separate mineralised positions along the Wilfred trend, while the IP
survey continues across the broader corridor and the last RC holes are completed at Mag.
“Drilling, geophysics and assays will together give us a much clearer picture of the potential of the 7 km Gold
Ridge corridor, and we look forward to updating shareholders as results are received.”
Figure 2. First diamond drill core from the Bondoukou Gold Ridge Project.
Diamond Drilling Programme
The initial diamond drilling programme comprises five holes for approximately 1,750 m, with each hole planned
to reach approximately 350 m depth at an inclination of −60°9
. The programme has been expanded from
approximately 1,250 m to 1,750 m, with planned hole depths increased from approximately 250 m to 350 m7,9
.
4
dalaroometals.com.au | ASX: DAL
The first hole, BDDD001, is being drilled from the BDRC002 collar position to test the down-dip extension of the
high-grade zone intersected in BDRC002.
Two holes will then be drilled on each of two sections approximately 80 m north-west and 80 m south-east of
BDRC002 to test whether the mineralisation continues along strike (Figure 3). Two holes per section will provide
multiple pierce points and initial information on the orientation, true width and continuity of the mineralised
zone.
The step-out holes will also test quartz reefs mapped at surface extending several hundred metres north-west
and south-east of the discovery holes9
. The first three drill pads have been prepared, and a temporary core yard
and site office are being established to support core handling, geological logging and secure storage.
Core (Figure 2) will be checked against the drillers’ depth markers, marked up for orientation and at metre
intervals, and measured for recovery before geological logging, photography and sampling. Sampling, QA/QC
procedures and laboratory arrangements will be reported with the assay results.
Figure 3. 3D cutaway of the Wilfred target showing the planned follow-up drilling (BDDD001, previously FUDD001, and FUDD003–006)
around BDRC002, and the staged 80 m step-out and infill strategy on a conceptual target plane. Intercepts are downhole widths.
Principal Programme Objectives
The programme’s first priority is to test beneath the discovery intersection. BDDD001 will target the down-dip
extension of the 18 m at 7.31 g/t Au zone in BDRC002, including 12 m at 8.66 g/t Au from 69 m6
, and will assess
whether the strongly silicified, sulphide-bearing host persists at depth. Holes on sections approximately 80 m
north-west and south-east of BDRC002 will then test whether the mineralisation continues along strike. Under
5
dalaroometals.com.au | ASX: DAL
the Company’s staged approach, if a step-out hole intersects mineralisation, a further hole will be drilled
another 80 m along strike9
.
Equally important is establishing the orientation and true width of the mineralisation. BDRC001 and BDRC002
were drilled in opposite directions to test alternative structural orientations6
, and oriented core will now allow
veins, contacts and foliation to be measured directly. This will define the geometry of the mineralised zone and
reduce the risk of drilling parallel to mineralised structures.
The same measurements should help identify what controls the high-grade gold. In BDRC002, a similarly
silicified interval with quartz–sulphide veining between 98 m and 113 m returned less than 0.25 g/t Au, indicating
that silicification alone does not explain the grade distribution6
. Core logging will investigate whether an
additional control, possibly structural, concentrates the gold.
Finally, the programme will investigate the source of the oxide gold in BDRC001, which returned 23 m at 2.14 g/t
Au from surface within laterite and saprolite6
. Diamond drilling will help establish whether this represents the
weathered expression of primary mineralisation at depth and how it relates to the BDRC002 bedrock
intersections.
Figure 4. Gold Ridge gold-in-soil anomaly on satellite imagery with drilled, pending and planned holes (top), and NW–SE long section
looking NE showing significant RC intercepts (bottom; same horizontal scale, with 4× vertical exaggeration).
6
dalaroometals.com.au | ASX: DAL
Geological Rationale for Follow-Up Drilling
The Bondoukou Gold Ridge Project is situated within Paleoproterozoic Birimian volcano-sedimentary rocks of
north-eastern Côte d’Ivoire, part of the geological terrane hosting numerous orogenic gold deposits across West
Africa.
Maiden RC drilling at Wilfred has identified gold mineralisation associated with quartz–sulphide veining,
silicification and structurally deformed volcaniclastic and mafic volcanic rocks6,8
.
The diamond programme is designed to investigate three key aspects of the mineralisation identified to date:
High-grade fresh-rock zone in BDRC002
The 18 m high-grade interval from 63 m to 81 m in BDRC002 corresponds exactly to a logged unit of strongly
silicified volcaniclastic rock with quartz–sulphide veining and pyrite. The carbonate-altered volcaniclastic rocks
immediately above and the moderately silicified volcaniclastic rocks immediately below are only weakly
mineralised6
.
BDRC002 returned:
• 18 m at 7.31 g/t Au from 63 m, including 12 m at 8.66 g/t Au from 69 m6
; and
• 16 m at 1.46 g/t Au from 113 m, including 1 m at 6.37 g/t Au from 114 m6
.
Drilling of BDRC002 was terminated at 210 m due to dip deviation, so the system below this depth has not yet
been tested9
.
BDDD001 will test beneath these intersections and provide oriented core through the mineralised zones.
Oxide gold from surface in BDRC001
BDRC001 was collared in lateriteandferricreteovera deeply weathered saproliteprofileto 35 m,passingthrough
saprock into fresh volcanic rocks6
.
BDRC001 returned:
• 23 m at 2.14 g/t Au from surface, including 12 m at 3.35 g/t Au from 7 m6
.
The entire 23 m intersection lies within the oxide profile. The oxide gold may be the weathered expression of
primary mineralisation at depth, and its source is a key question for the diamond programme.
Step-out holes on either side of the discovery section will also assess whether near-surface and bedrock
mineralisation continue along strike.
Comparable mineralisation at the northern section
Approximately 1.25 km from the discovery, RC drilling on the northern section intersected gold within a strongly
silicified quartz vein zone and sheared, altered basaltic rocks containing quartz–sulphide veins, including 13 m
at 2.67 g/t Au from 87 m in BDRC010C8
.
At BDRC011B, drilling intersected:
• 60 m at 0.85 g/t Au from 148 m, including 11 m at 1.62 g/t Au8
.
The Company considers the geological associations at the discovery and northern sections to be broadly
comparable. The upper intervals in BDRC010C and BDRC011B may represent the same mineralised zone, while
deeper mineralisation provides further targets9
.
7
dalaroometals.com.au | ASX: DAL
The second diamond rig will test the orientation and true width of the upper zone, investigate the deeper
mineralisation down-dip and drill step-outs approximately 80 m north-west and south-east along strike9
.
All intersections are downhole widths, and true widths are not yet known. Additional drilling is required to
establish the geometry and continuity of the mineralisation.
Exploring the Potential of the 7 km Gold Corridor
Dalaroo’s systematic exploration has identified an approximately 7 km gold-anomalous corridor extending
across the Mag, Wilfred and Ali target areas, defined through soil geochemistry, geological mapping and
reconnaissance exploration2,4
. Figure 4 shows the soil gold contours, RC drilling to date and planned holes.
Diamond drilling at Wilfred, the IP survey and the final RC holes at Mag are all designed to build the Company’s
understanding of the corridor and to prioritise targets along its full length.
Figure 5. RC drill rig currently drilling the Mag target, the final target in the initial orientation programme.
Wilfred – Established Gold Discovery
Wilfred is the most advanced exploration target within the corridor and is the focus of the diamond programme.
Maiden RC drilling has identified significant gold mineralisation at widely separated locations, including the
original high-grade discovery and the northern section approximately 1.25 km away6,8
.
The first diamond rig will test the discovery section around BDRC001 and BDRC002, while the second rig will test
the northern BDRC010C–BDRC011B section.
8
dalaroometals.com.au | ASX: DAL
Further drilling along the trend, including between the two sections, will be designed once the IP survey has been
completed, with the IP results to be used in conjunction with assay data from drilling9
.
Assay results for RC holes BDRC012 to BDRC018 are pending and will be reported when received and reviewed9
.
Mag – High-Priority Geochemical Target
Mag represents a significant exploration opportunity within the Bondoukou Gold Ridge corridor and is the
location of the final holes in the first phase of RC drilling.
Systematic soil sampling has identified a gold anomaly of approximately 3.0 km by 1.2 km (at the 100 ppb Au
contour), including a peak soil result of 23.26 g/t Au4
. Other significant soil results include 3.25, 2.54, 2.09, 1.96,
1.72 and 1.21 g/t Au, from a programme of 1,570 soil samples collected on a 200 m × 50 m grid across the
corridor4
.
Three RC holes remain to be drilled at Mag (Figure 5), with completion of the first phase of the RC programme
expected within the next seven days.
Drilling results from Mag will be used in conjunction with the current IP survey. The survey will investigate
potential chargeability and resistivity anomalies beneath the Mag geochemical target and help identify further
priority drill targets.
Ali – Emerging Target
Ali represents an additional prospective target within the Gold Ridge corridor.
RC drilling commenced at Ali in October 20268
, with initial drilling designed to investigate interpreted NW–SE-
trending geological structures.
Drilling results from Ali will be used in conjunction with the current IP survey. The survey will provide
complementary subsurface information on the geological setting and help identify further priority drill targets.
Together,the three targetareas providemultiple opportunities for identifyingadditionalmineralised zones within
the broader Gold Ridge system.
IP Survey and Integrated Exploration
The 35 line-km IP and resistivity survey is now underway across the Wilfred, Mag and Ali targets (Figure 6)10
. The
survey is being undertaken by SEMS Exploration Côte d’Ivoire SARL using two-dimensional dipole–dipole
surveying with a proposed 10 m electrode spacing10
.
The survey is designed to identify chargeability and resistivity anomalies potentially associated with sulphide-
bearing structures, quartz–sulphide veining, alteration zones and prospective lithological contacts, including
between and beyond the widely spaced Wilfred drill sections10
.
IP anomalies are not direct indicators of gold mineralisation, and any targets identified will require geological
assessment and drill testing.
Results from the diamond drilling and IP survey will be integrated with:
• Existing RC drilling and assay results;
• Oriented core structural measurements and geological logging;
9
dalaroometals.com.au | ASX: DAL
• Gold-in-soil geochemical anomalies;
• Geological mapping, lithological and alteration models; and
• Chargeability and resistivity sections from the IP survey.
The combined datasets will be used to refine Dalaroo’s exploration model and prioritise prospective targets for
future drilling.
The Company anticipates that this integrated approach will improve its ability to investigate the potential scale
of the Gold Ridge mineralised system while progressively reducing geological uncertainty.
Figure 6. Gold Ridge geological interpretation showing the Wilfred, Mag and Ali targets, gold-in-soil anomalies, significant RC drill
intersections and planned IP survey coverage.
Regional Geology and Structures
Bondoukou lies within the Paleoproterozoic Birimian terrane of the Baoulé–Mossi domain. The wider
Bondoukou–Tanda region comprises Birimian volcanic and volcano-sedimentary rocks, granitoids and younger
Tarkwaian-like sedimentary rocks. The Tarkwaian-like rocks are associated with the Koun–Tanda basin, also
known as the sillon de Bondoukou, which is interpreted as a western continuation of Ghana’s Bui Belt. The
contact between the Tarkwaian-like sediments and the Birimian basement is an important regional geological
boundary.
The district is cut by regional NNE-trending structures and by a set of NW-trending faults and fabrics (Figure 7).
At Assafou, approximately 49 km south-south-west of Gold Ridge3
, the basin margin is the NW-trending Assafou
Fault, and the mineralisation is mostly oriented at N310°3
. At Gold Ridge, Company field mapping has identified
a NW-trending foliation that is parallel to the approximately 7 km gold-in-soil corridor1
. Gold Ridge and Assafou
therefore share a NW structural orientation. This places Gold Ridge within a regional framework where NW-
10
dalaroometals.com.au | ASX: DAL
trending structures, and their intersections with theNNE-trending structures,may be important controls on gold.
The local geometry and controls at Gold Ridge still need to be established from mapping and drilling.
Geological feature Regional context and relevance to Bondoukou
Birimian basement Volcanic and volcano-sedimentary sequences, intruded by granitoids and deformed
during the Eburnean orogeny. Gold Ridge is interpreted to lie within Birimian volcano-
sedimentary rocks.
Koun–Tanda basin
and Tarkwaian-like
sediments
Tarkwaian-like clastic rocks overlie Birimian basement across an unconformity. At
Assafou they occupy a half-graben bounded to the north-east by the Assafou Fault3
.
Whether these rocks or their contact with Birimian units extend into the Gold Ridge area
is a local mapping and drilling question.
NW-trending
structures
The Assafou Fault is NW-trending, dips steeply (60–80°) south-west and has been
traced over approximately 12 km of strike, with other gold occurrences along it at
Kongodjan, Broukro and Gbabango3
. At Gold Ridge, the mapped foliation and the gold-
in-soil corridor also trend NW1
.
Regional NNE-
trending structures
Regional NNE-trending structures run through the district between Assafou and
Bondoukou3
. They provide a framework for evaluating structures and contacts at Gold
Ridge, particularly where they meet NW-trending structures.
Reactivated
contacts and faults
At Gontougo, Koulou Gold interprets its Yango gold-in-soil anomaly to follow a
reactivated unconformity marked by a magnetic break, which runs NW–SE near the
anomaly. It associates the Dadiassé anomaly with NE-trending breaks5
. Theseillustrate
the potential importance of reactivated geological boundaries in the region.
Folds, shears and
quartz veining
Regional gold systems may be localised along shear zones, fold hinges and limbs,
quartz-vein systems and contacts between contrasting rock types. At Gold Ridge,
Dalaroo’s current interpretation includes a fold-limb and hinge-zone setting, quartz
veining and a broader NW–SE structural-geophysical trend.
At Assafou, gold is hosted mainly in Tarkwaian-like sandstone at or near its structural contact with mafic Birimian
basement. Mineralisation occurs as disseminated gold in altered sandstone and in or around quartz
(±carbonate) veins and breccias3
. This provides a regional example of how favourable rock contacts and
deformation along a NW-trending fault may focus mineralising fluids.
At Gold Ridge, the current interpretation is a structurally controlled NW-trending corridor within Birimian rocks,
supported by coincident gold-in-soil anomalism, quartz veining, artisanal workings and geophysical trends. The
key geological questions are how the local folds and NW-trending structures relate to the regional NW and NNE
structural trends, whether significant lithological contacts occur within or near the project, and how these
features control the gold mineralisation.
References to Assafou, Gontougo and other projects in the region are included for geological context only. These
projects are held by third parties. Information about them has been drawn from publicly available sources and
has not been independently verified by Dalaroo or its Competent Person. Proximity to, or geological similarity
with, these projects does not mean that Gold Ridge hosts, or will host, similar mineralisation.
11
dalaroometals.com.au | ASX: DAL
Figure 7. Regional geology of the Bondoukou–Tanda district, showing NW-trending structures at Gold Ridge and Assafou.
Next Steps
Following commencement of diamond drilling, Dalaroo’s planned activities include:
1. Drilling BDDD001 beneath the BDRC002 discovery intersection, followed by the remaining four holes of
the initial programme on the step-out sections approximately 80 m north-west and south-east.
2. Mobilising the second diamond rig, expected at the end of November 2026, to commence follow-up
drilling on the northern BDRC010C–BDRC011B section.
3. Completing the final three RC holes at Mag within the next seven days, after which all follow-up drilling
will be undertaken using diamond rigs.
4. Reporting pending RC assay results, including BDRC012 to BDRC018, subject to laboratory turnaround
and QA/QC review.
5. Completing IP data acquisition and integrating the IP results with drilling, geochemical and geological
data from Wilfred, Mag and Ali to refine the structural model and prioritise further drill targets.
The Company will provide further updates as material exploration results become available.
12
dalaroometals.com.au | ASX: DAL
Technical Commentary
Frank Twum-Berima Bosompem, Exploration Manager – Côte d’Ivoire, commented:
“Commencing diamond drilling is an important step in systematically evaluating the high-grade gold
mineralisation identified at Wilfred. BDDD001 will test directly beneath the BDRC002 discovery intersection,
where the gold is closely associated with strongly silicified volcaniclastic rock, quartz–sulphide veining and
pyrite.
“Oriented core will be critical to understanding the structural controls on the mineralisation. Our RC results
show that silicification alone does not explain where the highest grades occur, and direct structural
measurements should help us identify the additional controls.
“With the second rig to follow at the northern section and the IP survey now underway, we will be integrating
diamond core, geophysics and RC data to build a three-dimensional model of the mineralised system.
“This represents an important step in moving from initial gold discoveries towards a systematic evaluation of the
geometry, continuity and scale of the Gold Ridge mineralised system.”
References
1. Refer to Dalaroo’s ASX announcement, 19 March 2026:“Major 2.5 km Gold Drill Target Defined at Gold Ridge Bondoukou
Project, Côte d’Ivoire”.
2. Refer to Dalaroo’s ASX announcement, 2 June 2026: “Gold Ridge Soils Define 4.3km Anomaly, Peak 2,188ppb Au”.
3. Refer to Endeavour Mining plc, NI 43-101 Technical Report, 5 June 2026: “Assafou-Dibibango Project (ADP), Côte
d’Ivoire”.
4. Refer to Dalaroo’s ASX announcement, 15 June 2026:“Dalaroo Defines ~7km Gold Corridor at Gold Ridge with Peak Soil
Assay of 23.26g/t Au”.
5. Refer to Koulou Gold Corp. news release, 21 September 2026: “Koulou Gold Provides Exploration Update at its 937.8
km² Gontougo Project”.
6. Refer to Dalaroo’s ASX announcement, 7 October 2026: “Dalaroo Makes High-Grade Gold Discovery at Bondoukou – 18
m at 7.31 g/t Au from Maiden Drilling”.
7. Refer to Dalaroo’s ASX announcement, 9 October 2026: “Dalaroo to Follow Up High-Grade Gold Discovery at
Bondoukou – Drilling Planned Around 18 m at 7.31 g/t Au”.
8. Refer to Dalaroo’s ASX announcement, 9 November 2026:“Wilfred Drilling Delivers Significant New Mineralisation ~1.25
km from Maiden High-Grade Gold Discovery”.
9. Refer to Dalaroo’s ASX announcement, 12 November 2026: “Diamond Drill Mobilisation Underway at Bondoukou Gold
Ridge Project”.
10. Refer to Dalaroo’s ASX announcement, 16 November 2026: “Dalaroo Commences Major IP Geophysical Survey at
Bondoukou Gold Ridge Project”.
This announcement has been authorised for release to the ASX by the Company’s Board of Directors.
ENDS
For more information:
Please visit our website: Dalaroo Metals Website
John Morgan
Chief Executive Officer
T: +61 410 774 319
E: info@dalaroometals.com.au
Competent Person’s Statement
The information in this announcement relating to previously reported Exploration Results is based on, and fairly represents, information
and supporting documentation compiled by Mr John Morgan, a Member of the Australasian Institute of Mining and Metallurgy. Mr Morgan
is a full-time employee and Chief Executive Officer of Dalaroo Metals Limited and holds shares and performance rights in the Company.
The information in this announcement that relates to geological interpretation, including the regional geology and structural setting, and
to the diamond drilling programme and IP survey is also based on information compiled by Mr Morgan.
Mr Morgan has sufficient experience relevant to the style of mineralisation, the type of deposit under consideration and the exploration
activities being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves (JORC Code). Mr Morgan consents to the inclusion in this announcement of the
matters based on his information in the form and context in which they appear.
This announcement relates primarily to the commencement of diamond drilling at the Bondoukou Gold Ridge Project and does not report
any new Exploration Results. All drilling results, including those from drill holes BDRC001 to BDRC011B, and previously disclosed soil
geochemical results referred to in this announcement have been reported in earlier ASX announcements.
For the purposes of ASX Listing Rule 5.23, the Company confirms that it is not aware of any new information or data that materially affects
the information included in the original market announcements referenced in this announcement. The Company further confirms that the
form and context in which the Competent Person’s findings are presented have not been materially modified from the original market
announcements.
Forward-Looking Statements
This announcement contains forward-looking statements which are based on current expectations, assumptions, estimates and
projections. Forward-looking statements are subject to known and unknown risks, uncertainties and other factors that may cause actual
results, performance or achievements to differ materially from those expressed or implied. These risks include, but are not limited to,
exploration success,geological interpretation, commodityprice fluctuations,regulatory approvals,permitting timelines, operational risks
and market conditions.
Any statements regarding potential mineralisation, exploration targets, grades, scale or development concepts are conceptual in nature
and based on early-stage exploration activities, including geological mapping, surface sampling, geochemical analysis, geophysical
surveying and early-stage drillingprogrammes. These statementsdo not constitute aMineral Resource orOre Reserve estimate asdefined
under the JORC Code and should not be construed as such. Dalaroo Metals Limited undertakes no obligation to update or revise any
forward-looking statements, except as required by law.
About Dalaroo Metals
Dalaroo Metals Limited is an ASX-listed exploration company focused on the discovery and development
of high-quality gold and critical minerals projects across Australia and international jurisdictions.
The Company’s portfolio includes the Blue LagoonProject in south-west Greenland, prospective for rare
earth elements (REE), zirconium and niobium, a rapidly growing portfolio of gold exploration assets in
Côte d’Ivoire, including the Bondoukou Gold Ridge Project within the highly endowed Birimian
Greenstone Belt of West Africa, and the Lyons River and Watheroo Projects in Western Australia.
Dalaroo’s strategy is to systematically advance its projects through modern exploration techniques,
resource definition, and strategic partnerships, with a strong focus on value creation for shareholders.
The Company is committed to responsible exploration, strong corporate governance and building long-
term stakeholder relationships in the regions in which it operates.
dalaroometals.com.au | ASX: DAL
Share your feedback
Discover