Dalaroo Metals Ltd (ASX: DAL; OTCQB: DALMF) is pleased to advise that it has completed the Priority 1 phase
of its systematic soil geochemistry program at the Gold Ridge Prospect within the Bondoukou Gold Project
in Côte d’Ivoire, marking an important step in advancing the Project towards the first-pass drill program.
The completed soil program represents the first large-scale systematic geochemical coverage over the south-
eastern extent of the interpreted mineralised corridor and is designed to refine and extend known gold
anomalism associated with artisanal workings, structural controls and favourable host lithologies.
With more than 2,000 samples now submitted for assay and field activities advancing into the Priority 2
north-western target area, Dalaroo continues to build momentum towards defining high-priority drill targets
across one of its most prospective gold assets in West Africa.
Highlights:
• Priority 1 soil geochemistry program completed over south-eastern target block at Gold Ridge
Prospect
• 2,241 primary soil samples and 120 QA/QC samples collected
• Program targets strike extensions of previously defined 2.5km x 400m gold corridor
• Historical rock-chip results include grades up to 17.95 g/t Au
• Sampling covers first ~4.5km of interpreted ~9.5km structural corridor
• Over 2,000 samples submitted to Intertek Laboratory for gold analysis
• Dingbi artisanal workings sampled with 28 channel samples and 4 grab samples
• Results expected to support the definition and prioritisation of multiple drill targets for trenching,
auger and maiden RC drilling
For more information about Dalaroo, please follow the link: Click Here.
2
Soil Geochemistry Program
The Priority 1 program targeted the south-eastern strike extension of previously identified gold anomalism
associated with artisanal workings, favourable metasedimentary units and interpreted structural corridors.
Completion of Priority 1 covers approximately 4.5km of strike and represents a significant milestone in
systematic target generation ahead of follow-up drilling.
The Company has now transitioned field crews to Priority 2 north-western block, where line cutting and soil
sample collection is underway.
The program is a systematic, high-resolution geochemical survey designed to define the extent, continuity
and intensity of gold mineralisation across a ~9.5km long structural corridor, interpreted from
aeromagnetic data and recent surface exploration (Figure 2).
This soil program targets the extension of previously defined high-priority mineralisation, including the
2.5km strike gold corridor, and aims to identify additional parallel or blind structures along the same trend
(Figure 1).
Figure 1. Gold Ridge Prospect Soil Sampling Progress Map – Completed and Planned Grid Lines.
Map showing Soil sampling progress completed lines and remaining on sampling grid (200m × 50m spacing) overlaid on mapped
local Geology and interpreted structural trends. The grid covers a ~9km long gold anomalous corridor, with priority sampling areas
highlighted at Dingbi and Kogodjan.
3
Soil Sampling Program Summary
The soil geochemistry program was designed to test along-strike extensions of previously reported
anomalous rock-chip results and mapped artisanal workings.
The soil geochemistry program has been designed to industry best-practice standards for early-stage gold
exploration:
• Grid spacing: 200m (line spacing) × 50m (sample spacing)
• Total planned lines: ~61 lines
• Total planned samples: ~4,400 samples
• Target area: ~9km long gold anomalous corridor
• Priority zones: Dingbi and Kogodjan areas
• Priority 1 Status Completed for ~4.5km strike length
• Priority 2 Status Commenced
• Original Soil Samples: 2,241 collected from Priority 1.
• QAQC Samples: 120
The survey is oriented along strike of the interpreted structural corridor, enabling effective delineation of
geochemical anomalies associated with shear-hosted and structurally controlled gold systems. (Figure 2).
This approach is consistent with exploration methodologies applied across major Birimian gold discoveries
in West Africa.
Figure 2. Priority 1 and Priority 2 Soil Sampling Areas Over Geophysical Imagery.
Plan map illustrating completed sampling lines and locations of soil samples collected to date. Sampling progress is shown relative
to the broader planned grid and previously defined rock-chip anomalism.
4
Geological Observations
The Priority 1 area is interpreted to be dominated by metasedimentary units with extensive duricrust
development containing iron oxide, manganese oxide and quartz fragments. Field teams also reported
widespread hematite, goethite and limonite alteration, consistent with weathered hydrothermal systems.
These features are widely recognised as pathfinder indicators for gold mineralisation in tropical terrains.
The presence of quartz fragments and iron oxides supports the interpretation of weathered bedrock
mineralisation sourced from underlying quartz-vein systems.
These features are typical of weathered profiles above primary gold mineralisation in Birimian terrains and
support the interpretation of a potentially extensive mineralised system at depth.
These geological characteristics are considered favourable in the context of the regional Birimian gold
systems of West Africa.
Dingbi Artisanal Workings – Channel Sampling Completed
Parallel work at the Dingbi artisanal site focused on identifying the source and geometry of mineralisation.
Samples Collected:
• 28 Channel Samples were collected via systematic trenching/channelling within the saprolite of adits
and artisanal trenches.
• 4 selective Grab Samples showing quartz stockworks and strong oxidation
• Structural measurements including dip and dip direction were also collected to assist targeting.
This work represents a critical step in transitioning from reconnaissance exploration to drill-ready targets.
Figure 3. Dingbi Artisanal Workings Showing Channel Sample Locations.
5
Project Overview and Regional Setting
The Bondoukou Project is located within the Birimian Greenstone Belt of Côte d’Ivoire, one of the most
prolific gold provinces globally.
The terrane is characterised by extensive greenstone belts, regional-scale shear zones and favourable
structural architecture, which commonly controls the emplacement of gold mineralisation throughout the
region.
The region hosts multiple multi-million-ounce gold deposits, with mineralisation typically associated with:
• Regional shear zones
• Fold-related structural traps
• Quartz vein systems
• Volcano-sedimentary lithological contacts
The project tenure encompasses multiple prospective structural corridors displaying geological and structural
characteristics conducive to gold mineralisation. Prospectivity appears particularly strong in the northern
portion of the licence, where extensive historical artisanal workings are developed along interpreted shear
zones and fault structures.
These artisanal workings provide evidence for near-surface gold occurrences within the project area.
However, no drilling or systematic exploration programs have yet been undertaken by the Company to
confirm the extent, grade or continuity of mineralisation.
Figure 4. Location of Dalaroo Côte d’Ivoire Projects Relative to Major Regional Gold Deposits.
6
Geological Setting and Prospectivity
The Bondoukou Project is located within the Birimian terrane of eastern Côte d’Ivoire, approximately 35 km
northwest of the Tanda gold deposit operated by Endeavour Mining, within one of West Africa’s most prolific
gold-producing geological provinces.
Gold mineralisation within the Birimian terrane is typically structurally controlled, occurring along major
shear zones and lithological contacts that act as conduits for hydrothermal fluids responsible for gold
deposition. At Bondoukou, extensive artisanal gold workings are distributed across the licence area,
particularly along interpreted regional shear corridors and volcanic–granitoid contacts, providing strong
surface evidence for near-surface gold mineralisation with potential for both strike and depth continuity.
The presence of favourable Birimian host lithologies, well-developed structural architecture, and widespread
artisanal mining activity indicates that the project may host orogenic-style gold mineralisation. These
characteristics support the implementation of systematic exploration programs, including geological
mapping, geochemical sampling and drilling, to evaluate the scale, grade continuity and economic potential
of the mineralised systems across the project area.
Upcoming Catalysts
Over the coming months, planned activities include:
• Continue Priority 2 soil geochemistry program
• Receipt of geochemical assay results
• Identification of coherent gold anomalies along strike
• Integrate assay results with geology, artisanal workings and structural interpretation
• Trenching and auger drilling programs of identified soil anomalies
• Define first-pass drill targets for Initial RC drilling campaigns
Management Commentary
Dalaroo CEO, John Morgan Commented:
“Completing Priority 1 soil sampling at Gold Ridge is an important milestone in systematically unlocking the
scale potential of Bondoukou. The program is targeting strike extensions to our previously defined gold
corridor and is already reinforcing our confidence in the broader mineralised system.
With over 2,000 samples now submitted for analysis and Priority 2 already underway, we are entering an
exciting phase where geochemistry, geology and structural interpretation will combine to define our first drill
targets. Côte d’Ivoire remains a key growth focus for Dalaroo, and Bondoukou is emerging as a highly
prospective gold opportunity within a world-class Birimian gold belt.”
Country Manager & Exploration Manager – Côte d’Ivoire Frank Twum-Berima Bosompem Commented:
“The field program has progressed strongly, with systematic sampling confirming the continuity of highly
prospective structures associated with historical artisanal workings, quartz veining and widespread
alteration. Our team is now advancing Priority 2 areas while assay results from Priority 1 are pending. We
believe Gold Ridge continues to demonstrate strong exploration potential for a significant mineralised gold
system.”
This announcement has been authorised for release to the ASX by the Company's Board of Directors.
ENDS
For more Information:
Please visit our website for more information: Dalaroo Metals Website
John Morgan
Chief Executive Officer
T: +61 410 774 319
E: info@dalaroometals.com.au
8
JORC Table 1 (Section 1 & 2)
Section 1: Sampling Techniques and Data
Sub-section JORC Code Explanation Disclosure
Sampling
techniques
Nature and quality of sampling (eg cut channels,
random chips, or specific specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as downhole
gamma sondes, or handheld XRF instruments,
etc). These examples should not be taken as
limiting the broad meaning of sampling Include
reference to measures taken to ensure sample
representativity and the appropriate calibration of
any measurement tools or systems used.
Aspects of the determination of mineralisation
that are Material to the Public Report.
In cases where ‘industry standard’ work has been done
this would be relatively simple (eg ‘reverse circulation
drilling was used to obtain 1 m samples from which 3 kg
was pulverised to produce a 30 g charge for fire assay’).
In other cases, more explanation may be required, such
as where there is coarse gold that has inherent
sampling problems. Unusual commodities or
mineralisation types (eg submarine nodules) may
warrant disclosure of detailed information.
Soil samples collected from shallow pits along a
systematic grid (200m × 50m spacing). Samples
typically collected from the B-horizon where
available. Sampling focused on detecting
geochemical dispersion associated with
underlying gold mineralisation.
Drilling
techniques
Drill type (eg core, reverse circulation, open- hole
hammer, rotary air blast, auger, Bangka, sonic, etc) and
details (eg core diameter, triple or standard tube, depth
of diamond tails, face-sampling bit or other type,
whether core is oriented and if so, by what method,
etc).
Not applicable. No drilling undertaken.
Sample
recovery
Methodof recordingand assessingcore andchipsample
recoveries and results assessed.
Measures taken to maximise sample recovery and
ensure representative nature of the samples.
Whether a relationship exists between sample recovery
and grade and whether sample bias may have occurred
due to preferential loss/gain of fine/coarse material.
Soil samples collected manually using hand tools.
Sample quality controlled by ensuring consistent
depth and horizon selection. No recovery issues
identified.
Logging
Whether core and chip samples have been geologically
and geotechnical logged to a level of detail to support
appropriate Mineral Resource estimation, mining
studies and metallurgical studies.
Whether logging is qualitative or
quantitative in nature. Core (or
costean/trench, channel, etc)
photography.
The total length and percentage of the relevant
intersections logged.
Field logging includes lithology, soil type, colour,
alteration indicators (hematite, goethite,
limonite), and presence of quartz fragments. Data
recorded at each sample location.
9
Sub-section JORC Code Explanation Disclosure
Sub-
sampling
techniques
/ sample
preparation
If core, whether cut or sawn and whether quarter, half
or all core taken. If non-core, whether riffled, tube
sampled, rotary split, etc and whether sampled wet or
dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation technique.
Quality control procedures adopted for all sub-
sampling stages to maximise representivity of samples.
Measures taken to ensure that the sampling is
representative of the in situ material collected,
including for instance results for field
duplicate/second-half sampling. Whether sample sizes
are appropriate to the grain size of the material being
sampled.
Samples collected in pre-numbered bags and
transported to camp. Samples will be dried, sieved
(typically -80 mesh fraction) and prepared using
industry standard laboratory procedures.
Quality of
assay data
and
laboratory
tests
The nature, quality and appropriateness of the
assaying and laboratory procedures used and whether
the technique is considered partial or total.
For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining
the analysis including instrument make and model,
reading times, calibrations factors applied and their
derivation, etc.
Nature of quality control procedures adopted (eg
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy (ie
lack of bias) and precision have been established.
Samples to be analysed at an accredited
laboratory (e.g., Intertek or equivalent) using
industry-standard gold analysis (e.g., aqua regia or
fire assay where applicable). Laboratory QA/QC
includes standards, blanks and duplicates. Field
QA/QC procedures (duplicates, blanks) to be
implemented during program.
Verification
of sampling
and
assaying
The verification of significant intersections by either
independent or alternative company personnel.
The use of twinned holes. The verification of significant
intersections by either independent or alternative
company personnel. Discuss any adjustment to assay
data
Sampling supervised by experienced Dalaroo
geological staff. Sample locations recorded using
handheld GPS. Data validated prior to database
entry.
Location of
data points
Accuracy and quality of surveys used to locate drill
holes (collar and down- hole surveys), trenches, mine
workings and other locations used in Mineral Resource
estimation.
Specification of the grid system used Quality and
adequacy of topographic control
Sample coordinates recorded using handheld GPS
(WGS84 datum, UTM Zone 30N). Accuracy
estimated ±5–10 m, appropriate for
reconnaissance exploration.
Data
spacing and
distribution
Data spacing for reporting of Exploration Results
Whether the data spacing and distribution is sufficient
to establish the degree of geological and grade
continuity appropriate for the Mineral Resource and
Ore Reserve estimation procedure(s) and
classifications applied.
Whether sample compositing has been applied
Grid spacing of 200m × 50m is appropriate for
early-stage geochemical targeting. Data density
sufficient to define coherent anomalies for follow-
up exploration.
Orientation
of data in
relation to
geological
structure
Whether the orientation of sampling achieves
unbiased sampling of possible structures and the
extent to which this is known, considering the deposit
type.
If the relationship between the drilling orientation and
the orientation of key mineralised structures is
considered to have introduced a sampling bias, this
should be assessed and reported if material.
Sampling grid oriented across interpreted
structural trends (NW–SE corridor) to effectively
detect geochemical anomalies parallel to
mineralisation controls.
10
Sub-section JORC Code Explanation Disclosure
Sample
security
The measures taken to ensure sample security Samples stored securely at site camp prior to
transport to laboratory. Sample tracking
maintained using unique sample IDs and
submission sheets.
Audits or
reviews
The results of any audits or reviews of sampling
techniques and data
No external audits undertaken at this stage.
Internal review by Company geologists confirms
procedures are appropriate for early-stage
exploration.
Section 2: Reporting of Exploration Results
Sub-section JORC Code Explanation Disclosure
Mineral
tenement and
land tenure
status
Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national
park and environmental settings.
The security of the tenure held at the time of
reporting along with any known impediments to
obtaining a licence to operate in the area.
The Bondoukou Project comprises the Goldridge
exploration permit located in eastern Côte
d’Ivoire, within the Birimian greenstone terrane of
West Africa.
Dalaroo Metals Ltd has entered into an agreement
to acquire up to an 80% interest in the permit
through a joint venture arrangement with the
current permit holder, Goldridge SARL, a locally
registered company in Côte d’Ivoire. Under the
terms of the agreement, Dalaroo may earn its
interest through staged exploration expenditure
and project advancement milestones.
At the time of reporting, the permit is considered
to be in good standing, and the Company is not
aware of any material impediments to conducting
exploration activities within the licence area.
Exploration activities are subject to the standard
regulatory approvals and compliance
requirements of the Côte d’Ivoire mining code and
environmental regulations.
The project area includes historical and active
artisanal mining activity, which is common within
the Birimian gold belts of West Africa. The
Company intends to engage with relevant
stakeholders and local communities to ensure
exploration activities are conducted responsibly
and in accordance with applicable regulations.
The Company is not aware of any national parks,
wilderness reserves, or protected areas within the
licence area that would materially restrict
exploration activities.
The tenure is considered secure at the time of
reporting, subject to compliance with the terms
and conditions of the permit and applicable
regulatory requirements.
11
Sub-section JORC Code Explanation Disclosure
Exploration done
by other parties
Acknowledgment and appraisal of
exploration by other parties.
Historical artisanal mining activity present across
the licence area, indicating near-surface gold
occurrences. No systematic modern soil
geochemistry programs previously reported.
Geology
Deposit type, geological setting and style of
mineralisation.
Project located within the Birimian Greenstone
Belt. Gold mineralisation typically associated with
shear zones, quartz veining and fold-related
structures.
Drill hole
information
A summary of all information material to the
understanding of the exploration results
including a tabulation of the following
information for all Material drill holes:
· easting and northing of the drill hole collar
· elevation or RL (Reduced Level – elevation
above sea level in metres) of the drill hole collar
· dip and azimuth of the hole
· down hole length and interception depth
· hole length
· If the exclusion of this information is justified on
the basis that the information is not Material and
this exclusion does not detract from the
understanding of the report, the Competent
Person should clearly explain why this is the case.
No drilling has been undertaken at the Bondoukou
Project by Dalaroo Metals at the time of reporting.
Data aggregation
methods
In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (eg cutting of high
grades) and cut-off grades are usually Material
and should be stated.
Where aggregate intercepts incorporate short
lengths of high grade results and longer lengths
of low grade results, the procedure used for such
aggregation should be stated and some typical
examples of such aggregations should be shown
in detail.
The assumptions used for any reporting of metal
equivalent values should be clearly stated.
No assay results reported at this stage.
Relationship
between
mineralisation
widths and
intercept lengths
These relationships are particularly important in
the reporting of Exploration Results.
If the geometry of the mineralisation with
respect to the drill hole angle is known, its nature
should be reported. If it is not known and only
the down
hole lengths are reported, there should be a clear
statement to this effect (eg ‘down hole length,
true width not known’).
Not applicable. Soil geochemistry program is
surface-based and does not define true widths.
Diagrams
Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for
any significant discovery being reported . These
should include, but not be limited to a plan view
of drill hole collar locations and appropriate
sectional views
Refer to Figures 1–3 showing sampling grid,
progress and field activities.
12
Sub-section JORC Code Explanation Disclosure
Balanced
reporting
Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and high
grades and/or widths should be practiced
avoiding misleading reporting of Exploration
Results.
No assay results available at this stage. This
announcement reports only on commencement
and progress of the soil sampling program.
Other substantive
exploration data
Other exploration data, if meaningful and
material, should be reported including (but not
limited to): geological observations; geophysical
survey results; geochemical survey results; bulk
samples – size and method of treatment;
metallurgical test results; bulk density,
groundwater, geotechnical and rock
characteristics; potential deleterious or
contaminating substances.
Completion of soil sampling (~4,400 samples),
receipt of assays, anomaly definition, followed by
trenching, auger drilling and RC drilling.
Further work
The nature and scale of planned further work (eg
tests for lateral extensions or large-scale step out
drilling.
Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future drilling
areas, provided this information is not
commercially sensitive.
Completion of soil sampling, receipt of assays,
anomaly definition, followed by trenching, auger
drilling and RC drilling.