June 2026 Quarterly Activities Report
Highlights:
Dalaroo Metals CEO John Morgan commented:
“The June quarter was a highly productive period for Dalaroo, led by the rapid advancement of Gold Ridge from
a 2.5-kilometre exploration target to a coherent gold corridor extending approximately seven kilometres. The
strength, continuity and tenor of the soil results, together with the alignment of geochemistry, structure,
geophysics and artisanal workings, have provided three clear priority target areas for systematic drill testing.
“At Blue Lagoon, the approval of two additional licences and mobilisation of our expanded 2026 field campaign
materially increased both the scale of the opportunity and the quality of the datasets being collected. We also
restarted targeted field activity at Watheroo and strengthened the Board and exploration team. Dalaroo enters
the September quarter with multiple active programs and a strong pipeline of exploration results.”
For further information about Dalaroo, please Click Here.
31 July 2026
• Bondoukou Gold Ridge Project in Côte d’Ivoire soil geochemistry defined a coherent gold
corridor extending ~7 km across the Mag, Wilfred and Ali target areas, with the system
remaining open.
• Peak Gold Ridge soil assays included 23.26 g/t Au, 3.25 g/t Au, 2.54 g/t Au, 2.09 g/t Au,
1.96 g/t Au, 1.72 g/t Au and 1.21 g/t Au.
• A total of 529 soil samples returned more than 25 ppb Au, including 127 samples above
100 ppb Au and 19 samples above 500 ppb Au.
• A 5,000 m auger drilling contract was executed and the program commenced to refine
targets ahead of staged maiden RC drilling.
• Greenland approved exploration licences M-516 and M-517, materially expanding
Dalaroo’s Blue Lagoon footprint within the Gardar Alkaline Province.
• Planning and mobilisation commenced for Dalaroo’s most comprehensive Blue Lagoon
field program to date, integrating mapping, sampling, GPR, bathymetry and nearshore
sediment sampling.
• A 466-sample soil geochemistry program commenced at the 100%-owned Watheroo
Project to refine Cu-Ni-PGE targets across a 7 km by 3 km magnetic feature.
• Board and technical capability strengthened through the appointments of Faheem
Ahmed as Non-Executive Director and Trystan Hughes as Exploration Manager -
Greenland and Western Australia.
2
dalaroometals.com.au | ASX: DAL
Dalaroo Metals Ltd (ASX: DAL, OTCQB: DALMF) is pleased to present its Quarterly Activities Report for the period
ended 30 June 2026. During the quarter, the Company delivered substantial exploration progress across its gold
and critical minerals portfolio in Côte d’Ivoire, Greenland and Western Australia, while strengthening its
technical and corporate capability.
Côte d’Ivoire
Bondoukou Gold Project
Project Overview
The Bondoukou Gold Project is located in northeastern Côte d’Ivoire within the Birimian Greenstone Belt.
Dalaroo holds the right to earn up to an 80% interest in the granted PR 825 permit. The Gold Ridge Prospect is the
priority exploration area and is positioned approximately 35 km northwest of Endeavour Mining’s Tanda-Iguela
Project and adjacent to Koulou Gold’s Gontougo Project.
Activities During the Quarter
The Company completed a large-scale systematic soil geochemistry program over the interpreted Gold Ridge
structural corridor. The program comprised approximately 194.5 km of sampling lines and 3,612 primary soil
samples. Including soil, channel, grab and QA/QC samples, 4,363 samples were dispatched to Intertek
Laboratory for analysis.
Priority one results defined a coherent 4.3 km gold-in-soil anomaly with a peak assay of 2,188 ppb Au (2.19 g/t
Au). A total of 454 samples returned more than 20 ppb Au, including 27 samples above 200 ppb Au. The anomaly
coincides with a broader interpreted 9 km geophysical corridor, a mapped fold-limb structure, artisanal
workings, quartz veining and favourable lithological contacts.
Subsequent priority two results extended the coherent anomaly to approximately 7 km of strike. Stand-out soil
results included 23.26 g/t Au, 3.25 g/t Au, 2.54 g/t Au, 2.09 g/t Au, 1.96 g/t Au, 1.72 g/t Au and 1.21 g/t Au. Across
the combined dataset, 529 samples returned more than 25 ppb Au, 127 samples exceeded 100 ppb Au and 19
samples exceeded 500 ppb Au.
Three Priority Target Areas
Mag Target (Northern): approximately 1.5 km strike length, defined by a 100-ppb Au contour and peak values of
23.26 g/t Au, 3.25 g/t Au, 2.54 g/t Au, 2.09 g/t Au and 1.96 g/t Au.
Wilfred Target (Central): approximately 3.5 km strike length, defined by a 50-ppb Au contour and peak values of
0.56 g/t Au and 0.51 g/t Au.
Ali Target (Southern): approximately 2.0 km strike length and up to approximately 1.2 km wide, supported by a
peak soil value of 0.71 g/t Au.
The combined geochemical response is strongly associated with interpreted structural corridors, folded
metasedimentary units, lithological contacts and widespread artisanal workings. The convergence of these
independent datasets provides an increasingly coherent targeting framework; however, exploration remains at
an early stage, and the corridor had not been tested by RC or diamond drilling at quarter end.
3
dalaroometals.com.au | ASX: DAL
Figure 1.Gold-in-soil assay results from the Gold Ridge Prospect defining three priority target areas—Mag, Wilfred and Ali—
across the approximately 7 km mineralised corridor.
Auger and RC Drill Preparation
During the quarter, Dalaroo executed an auger drilling services agreement with GEO-EXPLO Services SARL for a
minimum 5,000 m campaign. Three auger rigs were secured and drilling commenced in June. The program is
designed to improve the anomaly definition beneath transported cover, characterise the regolith profile and
prioritise targets for maiden RC drilling.
The Company is planning a staged drilling campaign, commencing with an initial 10,000m RC program, followed
by a planned 10,000m diamond drilling program. Any subsequent expansion of the broader drilling campaign will
be subject to exploration results, final program design and the availability of additional funding.
4
dalaroometals.com.au | ASX: DAL
Community and Government Engagement
Prior to and during the soil program, the Company completed extensive consultation with local communities,
landholders and government representatives. Engagement supported access arrangements, local participation
and the orderly execution of exploration activities across the project area.
Bongouanou Gold Project
The Bongouanou Project remained an important component of Dalaroo’s Côte d’Ivoire portfolio. During the
quarter, the Company maintained its technical review and stakeholder engagement while prioritising active field
programs at Bondoukou. The permit remains an application and future field activities remain subject to grant and
regulatory approvals.
Red Rock Resources Transaction
The Company continued to monitor and review the proposed Côte d’Ivoire portfolio transaction with Red Rock
Resources PLC. The proposed portfolio comprises Djekanou and Yamoussoukro (granted) and Kokoumbo and
Molonou (applications). Completion remains subject to definitive documentation, due diligence, regulatory
approvals and other conditions. There is no certainty that the proposed transaction will complete.
Planned Activities in Côte d’Ivoire
• Complete and interpret the Bondoukou auger drilling program.
• Integrate soil, auger, geological, structural and geophysical datasets to finalise RC collar positions.
• Commence the funded initial approximately 10,000m staged RC drilling program, subject to final
operational scheduling.
• Continue community, land access and government engagement.
• Maintain review of Bongouanou and the proposed Red Rock portfolio transaction.
Table 1. Tenure and Compliance of Côte d'Ivoire projects.
Project Tenement Status Interest
Bondoukou PR 825 Granted Up to 80%
Bongouanou PR 816 Application Up to 80%
Djekanou PR 920 Granted Proposed transaction
Yamoussoukro PR 921 Granted Proposed transaction
Molonou PR 922 Application Proposed transaction
Kokoumbo PR 923 Application Proposed transaction
5
dalaroometals.com.au | ASX: DAL
Greenland
Blue Lagoon
Project Overview
Blue Lagoon is a 100%-owned critical minerals project in south-west Greenland within the Gardar Alkaline
Province. The project targets REE, zirconium, niobium and hafnium mineralisation associated with alkaline
intrusive source rocks, and downstream concentration of heavy minerals within terrestrial, lagoonal and
nearshore sedimentary environments.
Activities During the Quarter
Dalaroo completed the 100% acquisition of exploration licence MEL 2022-07 during the quarter, consolidating
ownership and operational control over the core Blue Lagoon project area. Previous exploration had identified a
coherent mineralised corridor extending approximately 2.7 km, with all 113 surface samples returning
anomalous critical mineral values and peak results of 4.42% ZrO₂, 99 ppm Hf and 0.81% TREO.
The Company expanded its exploration model offshore and nearshore, where natural hydraulic sorting may
concentrate heavy minerals transported from alkaline intrusive source rocks. This source-to-sink model guided
the design of an integrated onshore and marine exploration program.
In May, the Greenland Government formally approved exploration licences M-516 and M-517. The approvals
materially expanded Dalaroo’s footprint and increased coverage of interpreted source rocks, sediment transport
pathways and depositional environments surrounding the core MEL 2022-07 licence. Offshore application M-
523 remained under assessment at quarter end.
2026 Field Program and Mobilisation
Dalaroo finalised the 2026 exploration plan and engaged Xploration Services Greenland to support mobilisation,
logistics and field execution. Mobilisation commenced in June with camp infrastructure, exploration equipment
and marine sampling equipment transported through the fjord system. The field campaign was led by CEO John
Morgan and Exploration Manager Trystan Hughes.
The planned integrated program included:
• Detailed geological and structural mapping and surface sampling.
• Ground Penetrating Radar over priority sedimentary environments to assess sediment thickness and
internal architecture.
• Bathymetric profiling of the lagoon system.
• Hand-auger or shallow sediment sampling across priority onshore targets.
• Van Veen grab sampling and nearshoregeochemical sampling, subject to licence coverage and operating
conditions.
• Sediment characterisation, grain-size analysis and mineralogical studies.
At quarter end, mobilisation and initial field setup were on schedule, with the principal exploration activities
continuing into the September 2026 quarter.
6
dalaroometals.com.au | ASX: DAL
Figure 2. Barge being loaded with equipment and supplies for Dalaroo’s 2026 exploration season at the Blue Lagoon Project in
southern Greenland.
Planned Activities
• Complete the 2026 field campaign and safely demobilise personnel and equipment.
• Dispatch geological, stream sediment, surface and lagoon samples for laboratory analysis.
• Process and interpret GPR and bathymetric datasets and integrate them with geological mapping and
geochemistry.
• Assess priority targets generated across the expanded licence package.
• Advance mineralogical and preliminary metallurgical evaluation of selected samples.
Table 2. Tenure and Compliance of Greenland Projects.
Licence Project Status Interest
MEL 2022-07 Blue Lagoon Granted 100%
M-516 Blue Lagoon Approved / documentation in progress 100%
M-517 Blue Lagoon Approved / documentation in progress 100%
M-523 Blue Lagoon Offshore Application 100%
7
dalaroometals.com.au | ASX: DAL
Western Australia
Watheroo Project
Activities During the Quarter
The Company commenced a systematic soil geochemistry program at the 100%-owned Watheroo Project,
targeting the Watheroo Chonolith prospect. The target is centred on an interpreted mafic-ultramafic intrusive
system expressed as an approximately 7 km by 3 km magnetic feature and is prospective for magmatic nickel-
copper-PGE mineralisation.
The planned program comprises 466 samples over 26 lines using a combination of 200 m by 100 m extensional
sampling and 100 m by 50 m infill sampling. Deep hand-auger sampling is being used to obtain material beneath
superficial cover. Stage 1 collection was completed during the quarter, with 106 samples prepared for laboratory
dispatch.
The program follows historical surface geochemistry reporting peak values of up to 320 ppm copper and 100
ppmnickel and field confirmation of olivinegabbroand local serpentinite.The survey is designed to test the scale
and internal zonation of the intrusive system and refine future drill targets.
Figure 3. Dalaroo Metals Exploration Manager – Greenland and Western Australia, Trystan Hughes, undertaking hand-auger
drilling at the Watheroo Project near Moora, Western Australia.
8
dalaroometals.com.au | ASX: DAL
Lyons River Project
The Company continued technical review and target prioritisation across the Lyons River Project. No material
field exploration results were reported during the quarter, with expenditure prioritised toward active programs at
Bondoukou, Blue Lagoon and Watheroo.
Planned Activities in Western Australia
• Complete Watheroo soil sampling and submit samples for multi-element analysis.
• Interpret Watheroo geochemistry with aeromagnetic and geological datasets to refine target areas.
• Review follow-up geophysics and drilling options subject to results.
• Continue portfolio-wide technical review and disciplined target ranking.
Table 3. Tenure and Compliance of Western Australia.
Project Tenement Status Interest
Lyons River E09/1824 Granted 100%
Lyons River E09/1825 Granted 100%
Lyons River E09/2098 Granted 100%
Lyons River E09/2304 Granted 100%
Lyons River E09/2305 Granted 100%
Lyons River E09/2312 Granted 100%
Lyons River E09/2713 Granted 100%
Watheroo E70/5494 Granted 100%
Corporate
Corporate Activities
During the June quarter, Dalaroo strengthened its governance and technical capacity to support the acceleration
of exploration across its international and Australian portfolio.
On 20 April 2026, the Company appointed Trystan Hughes as Exploration Manager - Greenland and Western
Australia. Mr Hughes brings experience in geological mapping, geochemistry, project generation and field
program execution and subsequently supported planning and mobilisation of the Blue Lagoon campaign and the
Watheroo soil program.
On 29 April 2026, Faheem Ahmed was appointed as a Non-Executive Director. Mr Ahmed brings resources sector
corporate, commercial, project appraisal, capital allocation and stakeholder engagement experience to the
Board.
9
dalaroometals.com.au | ASX: DAL
The Company continued investor engagement across Australia and international markets. Dalaroo’s ordinary
shares continued to trade on the OTCQB Market under the code DALMF, following commencement of trading in
March 2026.
Business Development and Community Engagement
During the quarter, Dalaroo’s senior management team continued to strengthen stakeholder relationships and
assess opportunities across the Company’s operating jurisdictions.
In Western Australia, management liaised with local stakeholders associated with the Watheroo and Lyons River
projects to support ongoing exploration planning, land access and future field activities.
Chief Executive Officer John Morgan travelled to Côte d’Ivoire, where he met with the owners and representatives
of several prospective exploration projects as part of the Company’s ongoing business development strategy.
While in-country, senior management also met with local villages and community representatives within the
Bondoukou Project area. These meetings supported continued community engagement, local participation and
access arrangements ahead of the Company’s exploration programs.
At the end of the quarter, Mr Morgan and Exploration Manager Trystan Hughes travelled to Greenland for the
commencement of the 2026 Blue Lagoon field program. During the visit, they held discussions with local
stakeholders, government representatives, contractors and suppliers to support field operations, logistics and
the Company’s longer-term activities in Greenland.
These engagements reflect Dalaroo’s commitment to building constructive, long-term relationships with local
communities, government authorities, suppliers and project stakeholders while continuing to evaluate new
growth opportunities aligned with the Company’s exploration strategy.
This announcement has been authorised for release to the ASX by the Company's Board of Directors.
ENDS
For more Information:
Please visit our website for more information: Dalaroo Metals Website
John Morgan
Chief Executive Officer
T: +61 410 774 319
E: info@dalaroometals.com.au
Competent Persons Statement
The information in this report that relates to exploration results is based on information compiled by John Morgan, a
Member of the Australasian Institute of Mining and Metallurgy (AusIMM) and the CEO of Dalaroo Metals Ltd. Mr Morgan
has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity
undertaken to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves (JORC Code). Mr Morgan consents to the inclusion in this report
of the matters based on this information in the form and context in which it appears.
Forward Looking Statements
This announcement contains forward-looking statements which are based on current expectations, assumptions,
estimates and projections. Forward-looking statements are subject to known and unknown risks, uncertainties and other
factors that may cause actual results, performance or achievements to differ materially from those expressed or implied.
These risks include, but are not limited to, exploration success, geological interpretation, commodity price fluctuations,
regulatory approvals, permitting timelines, operational risks and market conditions.
Any statements regarding potential mineralisation, exploration targets, grades, scale or development concepts are
conceptual in nature and based on early-stage surface sampling only. These statements do not constitute, and should not
be construed as, a Mineral Resource or Ore Reserve estimate as defined under the JORC Code. References to peer
projects, market pricing, strategic significance or potential future development pathways are provided for contextual
purposes only and should not be interpreted as a forecast of future performance or valuation. Dalaroo Metals Limited
undertakes no obligation to update or revise any forward-looking statements, except as required by law.
The Company confirms that it is not aware of any new information or data that materially affects the information included in
the referenced market announcements and that all material assumptions and technical parameters underpinning those
announcements continue to apply and have not materially changed.
About Dalaroo Metals
Dalaroo Metals Limited is an ASX-listed exploration company focused on the discovery and
development of high-quality gold and critical minerals projects across Australia and
international jurisdictions.
The Company’s portfolio includes the Blue Lagoon Project in south-west Greenland,
prospective for rare earth elements (REE), zirconium and niobium, a rapidly growing portfolio of
gold exploration assets in Côte d’Ivoire, including the Bondoukou and Bongouanou Gold
Projects within the highly endowed Birimian Greenstone Belt of West Africa, and the Lyons
River and Watheroo Projects in Western Australia.
Dalaroo’s strategy is to systematically advance its projects through modern exploration
techniques, resource definition and strategic partnerships, with a strong focus on value creation
for shareholders. The Company is committed to responsible exploration, strong corporate
governance and building long-term stakeholder relationships in the regions in which it operates.
dalaroometals.com.au | ASX: DAL
Rule 5.5
ASX Listing Rules Appendix 5B (17/07/20) Page 1
+ See chapter 19 of the ASX Listing Rules for defined terms.
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Dalaroo Metals Ltd
ABN Quarter ended (“current quarter”)
23 648 476 699 30 June 2026
Consolidated statement of cash flows Current quarter
$A’000
Year to date (12
months)
$A’000
1. Cash flows from operating activities
- -
1.1 Receipts from customers
1.2 Payments for
(1,576) (2,616)
(a) exploration & evaluation
(b) development - -
(c) production - -
(d) staff costs (90) (371)
(e) administration and corporate costs (112) (781)
1.3 Dividends received (see note 3) - -
1.4 Interest received 2 6
1.5 Interest and other costs of finance paid - -
1.6 Income taxes paid - -
1.7 Government grants and tax incentives - -
1.8 Other (provide details if material) - -
1.9 Net cash from / (used in) operating
activities
(1,776) (3,762)
2. Cash flows from investing activities
- -
2.1 Payments to acquire or for:
(a) entities
(b) tenements - -
(c) property, plant and equipment - -
(d) exploration & evaluation - -
(e) investments (23) (123)
(f) other non-current assets - -
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 2
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date (12
months)
$A’000
2.2 Proceeds from the disposal of:
- -
(a) entities
(b) tenements - -
(c) property, plant and equipment (2) (4)
(d) investments - -
(e) other non-current assets - -
2.3 Cash flows from loans to other entities - -
2.4 Dividends received (see note 3) - -
2.5 Other (provide details if material) - -
2.6 Net cash from / (used in) investing
activities
(25) (127)
3. Cash flows from financing activities
1,302 3,730
3.1 Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2 Proceeds from issue of convertible debt
securities
- -
3.3 Proceeds from exercise of options - 241
3.4 Transaction costs related to issues of equity
securities or convertible debt securities
(86) (268)
3.5 Proceeds from borrowings - -
3.6 Repayment of borrowings (30) (59)
3.7 Transaction costs related to loans and
borrowings
- -
3.8 Dividends paid - -
3.9 Other (provide details if material) - -
3.10 Net cash from / (used in) financing
activities
1,186 3,644
4. Net increase / (decrease) in cash and
cash equivalents for the period
4.1 Cash and cash equivalents at beginning of
period
826 455
4.2 Net cash from / (used in) operating
activities (item 1.9 above)
(1,776) (3,761)
4.3 Net cash from / (used in) investing activities
(item 2.6 above)
(25) (127)
4.4 Net cash from / (used in) financing activities
(item 3.10 above)
1,186 3,644
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 3
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date (12
months)
$A’000
4.5 Effect of movement in exchange rates on
cash held
- -
4.6 Cash and cash equivalents at end of
period
211 211
5. Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1 Bank balances 211 826
5.2 Call deposits - -
5.3 Bank overdrafts - -
5.4 Other (provide details) - -
5.5 Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
211 826
6. Payments to related parties of the entity and their
associates
Current quarter
$A'000
6.1 Aggregate amount of payments to related parties and their
associates included in item 1
76
6.2 Aggregate amount of payments to related parties and their
associates included in item 2
-
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
*Payment of fees to Directors for Director and consulting fees for the quarter.
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 4
+ See chapter 19 of the ASX Listing Rules for defined terms.
7. Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1 Loan facilities - -
7.2 Credit standby arrangements - -
7.3 Other (please specify) - -
7.4 Total financing facilities - -
7.5 Unused financing facilities available at quarter end -
7.6 Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8. Estimated cash available for future operating activities $A’000
8.1 Net cash from / (used in) operating activities (item 1.9) (1,776)
8.2 (Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
-
8.3 Total relevant outgoings (item 8.1 + item 8.2) (1,776)
8.4 Cash and cash equivalents at quarter end (item 4.6) 211
8.5 Unused finance facilities available at quarter end (item 7.5) -
8.6 Total available funding (item 8.4 + item 8.5) 211
8.7 Estimated quarters of funding available (item 8.6 divided by
item 8.3)
0.12
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8 If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1 Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: No. The quarter's operating outflow reflected planned exploration and one-off
costs; the Company manages discretionary spend to preserve cash while
continuing its exploration programs.
8.8.2 Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: Yes. The Company will raise further funds through the issue of equity securities
within its placement capacity, and the Directors are confident of success given
recent raisings and shareholder support.
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 5
+ See chapter 19 of the ASX Listing Rules for defined terms.
8.8.3 Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: Yes. The Company is continuing to explore its projects and, on the basis of those
funding steps and its ability to manage discretionary expenditure, the Directors
expect it to continue operations and meet its objectives.
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Compliance statement
1 This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2 This statement gives a true and fair view of the matters disclosed.
Date: 31 July 2026...................................................................................
Authorised by: The Board...................................................................................
(Name of body or officer authorising release – see note 4)
Notes
1. This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is
encouraged to do so.
2. If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash
Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting
standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3. Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity.
4. If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”.
If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the
[name of board committee – eg Audit and Risk Committee]”. If it has been authorised for release to the market by a
disclosure committee, you can insert here: “By the Disclosure Committee”.
5. If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as
complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and
Recommendations, the board should have received a declaration from its CEO and CFO that, in their opinion, the financial
records of the entity have been properly maintained, that this
Share your feedback
Discover