Alteration and Quartz–Sulphide Veining Logged 1.25 km from
Wilfred Discovery
BDRC010C logged a 34 m altered and veined interval from 62 m downhole, including two
intervals of stronger quartz–sulphide veining. Assays are pending.
Highlights:
• A 34 m downhole zone of alteration and quartz veining has been logged in BDRC010C from 62 m to 96
m, approximately 1,250 m north-west of BDRC001 and BDRC002 along the interpreted Gold Ridge
corridor, including more strongly developed quartz–sulphide veining from 78 m to 84 m and from 91 m to
96 m, and visually estimated 0.3–0.8% pyrite logged from 78 m to 84 m and from 90 m to 96 m, occurring
as disseminations and in veinlets [Competent Person to confirm, including 78–84 m]. These are visual
geological observations, not gold assay intersections.
• The lithological sequence logged in BDRC010C is similar to that logged in BDRC002 (refer Reference 6).
All intervals quoted are downhole widths.
• Exploration momentum continues. As at 11 October 2026, ten RC holes (BDRC001–BDRC009 and
BDRC010C) had been completed, with 2,252 m drilled in total including BDRC010A, BDRC010B and
BDRC010C. The RC rig is now setting up on BDRC011, which is designed to test the interpreted zone at
depth, ahead of drilling at Ali and Mag.
• Samples from BDRC010C are in transit to the SGS laboratory and will be prioritised for fast turnaround,
with assays expected before the end of October 2026.
• Samples from BDRC003 to BDRC009 are at the SGS laboratory, with assay results expected from early
November 2026, subject to laboratory turnaround and QA/QC review.
• Diamond drilling is planned to commence following mobilisation of the Easy Drill rig in mid to late
October 2026, targeting down-dip and along-strike extensions of the previously reported mineralisation
around BDRC001 and BDRC002.
• Dalaroo is advancing plans for an induced polarisation (IP) survey along the approximately 7 km Gold
Ridge corridor to help prioritise additional drill targets at Wilfred, Ali and Mag.
Cautionary statement: Visual observations of alteration and sulphides are not a substitute for laboratory
analysis; assay results are required to determine thepresence and grade of any gold mineralisation. Assay results
for BDRC010C are expected before the end of October 2026. Visual estimates of mineral abundance should
never be considered a proxy or substitute for laboratory analyses where concentrations or grades are the factor
of principal economic interest. Visual estimates also potentially provide no information regarding impurities or
deleterious physical properties relevant to valuations.
Dalaroo Metals Limited (ASX: DAL, OTCQB: DALMF) (“Dalaroo” or “the Company”) reports further geological
observations from its maiden RC drilling campaign at the Bondoukou Gold Ridge Project in Côte d’Ivoire. Logging
12 October 2026
2
dalaroometals.com.au | ASX: DAL
of BDRC010C has identified a 34 m downhole interval of alteration and quartz veining from 62 m to 96 m, with
locally stronger quartz–sulphide veining. The sequence displays similarities to previously reported discovery
hole BDRC002 (refer Reference 6). While these geological similarities are encouraging, assays are required to
establish whether BDRC010C contains gold mineralisation. With follow-up diamond drilling planned, further RC
targets ahead and multiple assay results expected from early November, Dalaroo is progressing a systematic
evaluation of the wider Gold Ridge corridor.
For further information about Dalaroo, please click here.
Management Commentary
Dalaroo Chief Executive Officer, John Morgan, commented:
“Our first reported high-grade gold intersections at Wilfred established an exciting starting point for exploration
at Gold Ridge. We are encouraged that BDRC010C has now encountered alteration, quartz–sulphide veining and
a rock sequence comparable to that seen in BDRC002. The immediate priority is to establish, through laboratory
assays and follow-up drilling, whether these geological features are associated with further gold mineralisation
and how the system is oriented.”
“We have a substantial program ahead of us. The diamond rig is planned to mobilise in mid to late October to test
extensions of the known high-grade intersections, while additional RC drilling, assays expected from early
November and a proposed IP survey will help us assess targets along the approximately 7 km corridor. Oriented
diamond core will be especially valuable in developing the structural interpretation and designing the next phase
of drilling. Our focus is on building the geological evidence required to assess the scale and continuity of
mineralisation.”
Refer to the cautionary statement on visual estimates on page 1.
BDRC010C Logging Shows Geological Similarities to Discovery Hole
BDRC002
Geological logging of BDRC010C shows a lithological sequence similar to that logged in BDRC002. An altered
and quartz-veined zone with pyrite logged from 78 m was identified in BDRC010C from 62 m to 96 m. Pyrite is
logged over 12 m of this 34 m interval (78–84 m, 90–91 m and 91–96 m), with quartz–sulphide veining strongest
from 78 m to 84 m and from 91 m to 96 m. Pyrite is logged as disseminated grains from 90 m to 91 m and as
disseminated grains and veinlets from 91 m to 96 m; the occurrence of pyrite from 78 m to 84 m is [Competent
Person to confirm]. Pyrite is also logged below this interval. This alteration is seen approximately 1,250 m north-
west of BDRC001 and BDRC002 along the interpreted Gold Ridge corridor.
A comparison of the geological logs for BDRC002 and BDRC010C shows that the two holes intersected a similar
rock sequence at broadly similar depths below collar. Both holes were drilled at −60°, but in opposite directions
(BDRC002 towards 225° and BDRC010C towards 045°) and approximately 1.25 km apart, so this depth
correspondencedoes notindicate thattheholes intersected the samestructure or that thezones areconnected.
Geological similarity does not imply that BDRC010C contains gold mineralisation of a similar grade or width. All
depths are downhole.
Upper zone: In BDRC002, the upper zone from 63 m to 81 m (refer Reference 6) comprises foliated, strongly
silicified volcaniclastic rocks with quartz–sulphide veining, logged with approximately 1% pyrite and 1% vein
(visual estimates). BDRC010C intersected a comparable package from 62 m to 96 m, logged as foliated to
schistose volcaniclastic rocks and quartz veins with weak to pervasive silicification, with locally 0.3% to 0.8%
pyrite and quartz–sulphide veining, most strongly developed from 78 m to 84 m and from 91 m to 96 m.
Lower zone: Below the upper zone, both holes pass through basalt (mafic volcanic) before returning to altered,
pyrite-bearing rocks. In BDRC002, this lower zone from 109 m to 128 m comprises silicified volcaniclastic rocks
with quartz–sulphide veining, logged with 0.5% pyrite and 0.7% to 1% vein (visual estimates). In BDRC010C,
3
dalaroometals.com.au | ASX: DAL
pyrite and quartz–sulphide veining are logged from 96 m to 103 m, including 1% pyrite from 96 m to 100 m and
0.3% pyrite from 100 m to 103 m (visual estimates), and volcaniclastic rocks with pervasive chlorite alteration
and approximately 0.7% disseminated andveinlet pyritearelogged from115 m to 160 m,with 0.3% disseminated
pyrite in basalt from 160 m to 170 m. Volcaniclastic rocks with moderate chlorite alteration and 0.1% to 0.4%
predominantly disseminated pyrite are logged from 170 m to the end of hole at 232 m, with strong schistosity
from 170 m to 183 m, feldspar (albite and orthoclase) from 183 m to 190 m, and quartz–sulphide veinlets with
0.4% pyrite from 210 m to 228 m.
Structure: In both holes, the altered and sulphide-bearing intervals carry a foliation, cleavage or shear fabric,
logged as strong in parts. In BDRC002, the gold intercepts coincide with this foliation and quartz–sulphide
veining.
Sulphide percentages for BDRC010C are visual estimates from RC chip logging. Assay results are required to
determine the presence and grade of any gold mineralisation in BDRC010C and are expected before the end of
October 2026.
Figure 1a. Drill chip trays from hole BDRC010C, 50–100 m (1 m intervals). The red outline marks the altered and quartz-veined zone
logged visually from 62 m to 96 m, with pyrite logged from 78 m (78–84 m and 90–96 m); the pyrite occurrence logged for each interval is
set out in Table 1. Assays are pending.
Figure 1b. Drill chips from hole BDRC010C, 150–232 m, showing strong schistosity (170–183 m), feldspar with pyrite (183–190 m) and
pyrite with quartz–sulphide veinlets (210–228 m). Refer to the cautionary statement on visual estimates on page 1.
4
dalaroometals.com.au | ASX: DAL
Table 1. Visual estimates of vein and sulphide abundance in BDRC010C, 0–232 m downhole. Refer to the cautionary statement on visual
estimates on page 1.
From
(m)
To
(m)
Lithology
Alteration
(intensity)
Vein
type
Vein
(%)
Sulphide
Sulphide
(%)
Occurrence
0 12
Laterite /
ferricrete
Hematite
(strong)
– – – –
12 19
Unknown / mixed
(quartz vein 13–19
m)
Hematite
(strong)
Quartz 0.4 – –
19 43 Unknown / mixed
Limonite /
goethite (strong)
– – – –
43 62 Unknown / mixed
Limonite /
goethite (strong)
Quartz 0.1 – –
62 78 Volcaniclastic
Silicification
(weak)
Quartz 0.4 – –
78 84
Quartz vein with
volcaniclastic
Silicification
(strong)
Quartz–
sulphide
1 Pyrite 0.5
Minor Veining
84 88
Quartz vein
(milky)
Silicification Quartz 1 – –
88 90
Volcaniclastic
with quartz vein
Silicification
(weak)
Quartz 0.1 – –
90 91
Volcaniclastic
with quartz vein
Silicification
(strong)
Quartz 0.3 Pyrite 0.3
Disseminated
91 96
Quartz vein with
volcaniclastic
Silicification
(pervasive)
Quartz–
sulphide
1 Pyrite 0.8
Disseminated &
Veinlets
96 100
Basalt / mafic
volcanic with
quartz vein
Potassic (strong)
Quartz–
sulphide
0.7 Pyrite 1
Disseminated &
Veinlets
100 103
Volcaniclastic
with quartz vein
Silicification
(moderate)
Quartz–
sulphide
0.2 Pyrite 0.3
Disseminated
103 115
Basalt / mafic
volcanic with
quartz vein
Chlorite
(moderate)
Quartz 0.1 – –
115 160 Volcaniclastic
Chlorite
(pervasive)
– – Pyrite 0.7
Disseminated &
Veinlets
160 170
Basalt / mafic
volcanic with
volcaniclastic
– – – Pyrite 0.3
Disseminated
170 183
Volcaniclastic
(strong
schistosity)
Chlorite
(moderate)
– – Pyrite 0.2
Disseminated
183 186
Volcaniclastic
with feldspar
(albite and
orthoclase)
Chlorite
(moderate)
– – Pyrite 0.3
Disseminated
186 190
Volcaniclastic
with feldspar
(albite and
orthoclase)
Chlorite
(moderate)
– – Pyrite 0.3
Disseminated
190 210 Volcaniclastic
Chlorite
(moderate)
– – Pyrite 0.3
Disseminated
210 228
Volcaniclastic
with quartz–
sulphide veinlets
Chlorite
(moderate)
Quartz–
sulphide
0.4 Pyrite 0.4
Disseminated &
Veinlets
228 232 Volcaniclastic
Chlorite
(moderate)
– – Pyrite 0.1
Disseminated
Notes: Visual estimates are the logging geologist’s estimates of percentage by volume for each logged interval.“–”= not observed. For 170–232 m, the sub-
intervals shown are based on the logging geologist’s comments. Pyrite is the only sulphide logged. Vein orientations and true widths cannot be determined
from RC chips; all intervals are downhole. Laboratory assay results for BDRC010C are expected before the end of October 2026.
Table 1 summarises the visual estimates of veining and sulphide abundance recorded in BDRC010C. Quartz–
sulphide veining and pyrite are logged within the altered interval from 78 m to 103 m downhole, with the strongest
combined vein and pyrite estimates within the 62–96 m zone recorded from 78–84 m and 91–96 m, and the
highest pyrite estimate in the hole (1%, with 0.7% vein) recorded from 96 m to 100 m, immediately below that
zone; pyrite is also logged in the lower intervals from 115 m to the end of hole at 232 m, including quartz–sulphide
veinlets with 0.4% pyrite from 210 m to 228 m. These observations provide geological context for the logged
5
dalaroometals.com.au | ASX: DAL
alteration and veining but are based on visual estimates from RC chips and do not confirm gold mineralisation;
laboratory assays are required to determine gold presence and grade.
The lithological sequence in BDRC010C is similar to that logged in BDRC002 (Figures 4 and 5).
The RC rig is now setting up on the next hole in the program, BDRC011, which will be drilled from the same drill
pad as BDRC009 and has been designed as a scissor hole to BDRC010C, drilled in the opposite direction across
the interpreted target zone. BDRC011 is intended to test for continuation of the alteration and sulphides logged
in BDRC010C at depth, and to help constrain the orientation of the target zone, which may be subvertical. The
hole is planned to intersect the target zone between approximately 120 m and 150 m downhole.
Figure 2. Dalaroo geologists reviewing RC chip trays at the drill rig.
Figure 3. Section B–B′ (045°/225°): BDRC009, BDRC010C (EOH 232 m) and planned scissor hole BDRC011 (225°/−60°, 250 m).
BDRC010C: alteration and quartz from 62 m; quartz-veined zone 78–96 m; chlorite alteration, 0.1–0.7% pyrite from 115 m (visual
estimates; refer cautionary statement, page 1). Assays pending. True widths unknown.
6
dalaroometals.com.au | ASX: DAL
Review of Hole BDRC002
BDRC002 was drilled at the Wilfred target as a scissor pair with BDRC001, at a dip of −60° towards 225°
(BDRC001 was drilled towards 045°), to test the quartz reef and its extensions at depth. The hole was ended at
210 m due to dip deviation.
BDRC002 returned two previously reported significant intersections (refer Reference 6):
• 18 m at 7.31 g/t Au from 63 m (131.6 gram-metres); and
• 16 m at 1.46 g/t Au from 113 m (23.4 gram-metres).
The 18 m high-grade interval corresponds to a logged unit of strongly silicified volcaniclastic rock with quartz–
sulphide veining and pyrite, and the gold intercepts coincide with a strong foliation and quartz–sulphide veining
(Figures 4 and 5). All widths are downhole; true widths, geometry and continuity of the mineralisation are not yet
known.
Follow-up diamond drilling will include a hole from the BDRC002 collar at −70° towards 225° to 250 m, designed
to test the mineralised zones below both intercepts, along with step-out holes approximately 80 m north-west
and south-east of BDRC002.
Figure 4. BDRC002 chip trays showing previously reported assay intercepts (refer Reference 6).
BDRC002
18 m @ 7.31 g/t Au from 63 m
16 m @ 1.46 g/t Au
from 113 m
7
dalaroometals.com.au | ASX: DAL
Figure 5. Close-up of the mineralised zone in BDRC002 with grades associated with corresponding intervals (refer Reference 6).
Diamond Drilling to Test Extensions of High-Grade Gold Discovery
Following the high-grade results from the first drill section (refer Reference 6), Dalaroo will mobilise a diamond
drill rig from Easy Drill to the Bondoukou Gold Ridge Project in mid to late October 2026, with the potential for
further diamond rigs from late November 2026. Easy Drill personnel are scheduled to arrive on site during the
week of 12 October 2026 for site checks and preparation before mobilising later in the month. The diamond rig
will begin with follow-up drilling around BDRC001 and BDRC002, testing the mineralisation down dip and along
strike over approximately 160 m of strike length.
• RC and diamond drilling: Dalaroo will continue the RC program to complete the orientation drilling and will
also use the RC rig for follow-up holes where appropriate. Holes that need structural information, or are not
suited to RC drilling, will be drilled with the diamond rig.
• Benefits of diamond drilling: Oriented drill core will allow Dalaroo to better understand the structural
geology controlling the gold mineralisation at Gold Ridge. Diamond rigs also have a smaller footprint,
requiring less clearing at each drill site, and give better control of hole direction.
• Follow-up drilling methodology: Follow-up drilling will commence at BDRC002. Drill pad preparation is
under way and comprises pegging, clearing and payment of crop compensation, a process that typically
requires two to four weeks. Drilling will be scheduled once compensation has been settled. Further drill
planning will be undertaken on return of assay results from the initial orientation drilling.
As at 11 October 2026, ten RC holes (BDRC001 to BDRC009 and BDRC010C) had been completed and two
additional BDRC010 attempts (BDRC010A and BDRC010B) had been abandoned, as part of the initial 24-hole,
approximately 4,200 m orientation program (refer Reference 5). The 2,252 m drilled in total includes all three
BDRC010 attempts. BDRC010A and BDRC010B were stopped at 174 m and 96 m respectively due to casing
failure, and the hole was redrilled from the same drill pad as BDRC010C, which was completed at 232 m, with
the RC rig now setting up on BDRC011. Following BDRC011, the RC rig will move to the final drill fence at the
Wilfred target, then to the Ali target for approximately 10 to 12 days of drilling, before moving to the final target,
Mag, for a further 10 to 12 days. Three earlier holes were ended short of their planned 250 m depth: BDRC002 at
210 m due to dip deviation, and BDRC003 and BDRC004 at 200 m due to excessive water contamination. Drill
locations, orientations, depths, drilling methods and sequencing may be adjusted as assay results and
geological information become available.
0.01 g/t 0.04 g/t 0.07 g/t 3.21 g/t 5.61 g/t 3.2 g/t 3.05 g/t 5.3 g/t 7.33 g/t 8.05 g/t 10.9 g/t 8.06 g/t 6.7 g/t 13.1 g/t 6.46 g/t 8.96 g/t 1.72 g/t 5.65 g/t 15.9 g/t 6.37 g/t
12 g/t 0.13 g/t 0.15 g/t 0.02 g/t 0.1 g/t 0.04 g/t 0.03 g/t 0.02 g/t 0.03 g/t 0.02 g/t
8
dalaroometals.com.au | ASX: DAL
Figure 6. RC rig drilling at the Bondoukou Gold Ridge Project.
Figure 7. Soil-gold anomalism along the ~7 km Mag–Wilfred–Ali corridor, with completed Wilfred RC holes (BDRC001–010C;
BDRC001/002 assayed), next hole BDRC011 (red), final Wilfred fence PHD003/004, and planned Mag and Ali holes.
9
dalaroometals.com.au | ASX: DAL
Assay update: Seasonal rainfall has restricted heavy vehicle access to site, though light vehicle access
continues. Samples that became damp before transport to the Company’s Bondoukou office and the SGS
laboratory need extra drying before preparation. BDRC003 to BDRC009 samples are at the laboratory, with
assays expected fromearly November 2026.BDRC010C samples are in transitand willbeprioritised,with assays
expected before the end of October 2026. Both timings are subject to laboratory turnaround and QA/QC review.
BDRC010A and BDRC010B, superseded by BDRC010C, had not been logged at release and will be logged,
sampled and assayed as a low priority. Dalaroo has since modified on-site sample storage to minimise rainfall
exposure before weekly dispatch to the laboratory.
Geophysics planning
Following the results fromBDRC001 and BDRC002, Dalaroo is finalising arrangements to commence an induced
polarisation (IP) and resistivity survey at the Bondoukou Gold Ridge Project.
The preliminary survey scope comprises approximately 35.1 line-kilometres of 2D dipole-dipole profiling, using
proposed 10-metre electrode spacing and an 800-metre array spread. Final line locations and lengths will be
refined using ground magnetic survey results and geological interpretation.
The survey is intended to assess subsurface variations in resistivity and chargeability and their spatial
relationship to known mineralisation, geological structures and other exploration data. Chargeability responses
can be associated with polarisable materials, including disseminated sulphide minerals, which may occur with
gold mineralisation. IP is an indirect exploration method and does not detect gold itself; responses can also
reflect other geological sources and require careful interpretation.
Dalaroo intends to survey the full approximately 7 km Gold Ridge corridor, beginning around known
mineralisation and extending outwards along the corridor. Infill surveying would then focus on priority areas
identified from the initial results. Inverted resistivity and chargeability sections will be interpreted alongside
drilling, geology, geochemistry and magnetic data to refine targets for follow-up drilling. Any anomalies will
require geological assessment and drill testing to determine their significance.
Figure 8. Proposed IP survey on magnetics: 15 lines (35.1 line-km) across magnetic contact. Priority 1 (red) crosses Wilfred; Priority 2
(maroon) extends to Mag and Ali.
10
dalaroometals.com.au | ASX: DAL
Next Steps
• Complete BDRC011 and the final Wilfred drill fence, then advance RC drilling at the Ali and Mag targets.
• Mobilise the Easy Drill diamond rig in mid to late October 2026 and complete the five-hole, approximately
1,250 m follow-up program at Wilfred (refer Reference 7), testing down dip and along strike of BDRC001
and BDRC002 with oriented core, and assess additional diamond rigs from late November 2026.
• Report assay results from BDRC010C, prioritised for fast laboratory turnaround and expected before the
end of October 2026, and from BDRC003 to BDRC009, expected from early November 2026, subject to
laboratory turnaround and QA/QC review.
• Continue the 24-hole orientation program across the Wilfred, Ali and Mag targets.
• Integrate the follow-up results into the three-dimensional geological model to define the orientation, true
width and continuity of the mineralised zones.
• Use the results to plan further step-out drilling along strike and down dip at Wilfred, and assess
opportunities for deeper RC or diamond drilling.
• Design subsequent drilling with an increasing emphasis on testing mineralisation continuity and
geometry to support potential future Mineral Resource definition, subject to encouraging assay results
and geological interpretation.
Technical Commentary
Frank Twum-Berima Bosompem, Exploration Manager – Côte d’Ivoire, commented:
“The rock sequence logged in BDRC010C is similar to that in BDRC002. We see a similar foliated, silicified
volcaniclastic package with quartz veining from 62 m to 96 m and quartz–sulphide veining from 78 m to 84 m and
from 91 m to 96 m, followed by basalt and then a second pyrite-bearing zone below. The structural fabric is a key
part of our interpretation.
“BDRC011 has been designed as a scissor hole to BDRC010C to test the zone at depth and help constrain its
orientation. That information, together with oriented diamond core from the Easy Drill rig, will be important in
building a reliable geological model at Wilfred. The team has also improved on-site sample storage, so samples
reach the laboratory in better condition during the wet season. We now await assays from BDRC003 to BDRC009,
and from BDRC010C, to determine whether the alteration we are logging carries gold.”
Refer to the cautionary statement on visual estimates on page 1.
References
1. Refer Dalaroo ASX announcement, 9 March 2026: “Bondoukou Goldridge Due Diligence Assay Results”.
2. Refer Dalaroo ASX announcement, 19 March 2026: “Major 2.5 km Gold Drill Target Defined at Gold Ridge Bondoukou
Project, Côte d’Ivoire”.
3. Refer Dalaroo ASX announcement, 2 June 2026: “Gold Ridge Soils Define 4.3km Anomaly, Peak 2,188ppb Au”.
4. Refer Dalaroo ASX announcement, 15 June 2026: “Dalaroo Defines ~7km Gold Corridor at Gold Ridge with Peak Soil
Assay of 23.26g/t Au”.
5. Refer Dalaroo ASX announcement, 28 September 2026: “Drilling Progresses at Bondoukou Gold Ridge Project
Amended”.
6. Refer Dalaroo ASX announcement, 7 October 2026: “Dalaroo Makes High-Grade Gold Discovery at Bondoukou – 18 m
at 7.31 g/t Au from Maiden Drilling”.
7. Refer Dalaroo ASX announcement, 9 October 2026: “Dalaroo to Follow Up High-Grade Gold Discovery at Bondoukou –
Drilling Planned Around 18 m at 7.31 g/t Au”.
11
dalaroometals.com.au | ASX: DAL
This announcement has been authorised for release to the ASX by the Company’s Board of Directors.
ENDS
For more information:
Please visit our website: Dalaroo Metals Website
John Morgan
Chief Executive Officer
T: +61 410 774 319
E: info@dalaroometals.com.au
Competent Person’s Statement
The information in this announcement that relates to Exploration Results is based on, and fairly represents, information and supporting
documentation compiled by Mr John Morgan, a Member of the Australasian Institute of Mining and Metallurgy. Mr Morgan is a full-time
employee and Chief Executive Officer of Dalaroo Metals Limited and holds shares and performance rights in the Company.
Mr Morgan has sufficient experience relevant to the style of mineralisation and type of deposit under consideration, and to the exploration
activities being undertaken, to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves (JORC Code). Mr Morgan consents to the inclusion in this announcement of the
matters based on his information in the form and context in which they appear.
The Exploration Results addressed in this announcement include preliminary geological observations from the Company’s current RC
drilling program, including BDRC010C, and previously reported Exploration Results, including the assay results for BDRC001 and
BDRC002, identified in the References section. No new laboratory assay results are reported in this announcement. The geological
observations are visual and preliminary in nature, and laboratory assays are required to determine whether gold mineralisation is present
and, if so, its grade and significance.
JORC Code Table 1 disclosures covering Sections 1 and 2 are provided in Appendix 1 and relate to the current RC drilling program and the
preliminary geological observations reported in this announcement.
The Company confirms that it is not aware of any new information or data that materially affects the previously reported Exploration
Results referenced in this announcement. The Company also confirms that the form and context in which the relevant Competent
Person’s findings were presented have not been materially modified from the original market announcements.
Forward-Looking Statements
This announcement contains forward-looking statements which are based on current expectations, assumptions, estimates and
projections. Forward-looking statements are subject to known and unknown risks, uncertainties and other factors that may cause actual
results, performance or achievements to differ materially from those expressed or implied. These risks include, but are not limited to,
exploration success,geological interpretation, commodityprice fluctuations,regulatory approvals,permitting timelines, operational risks
and market conditions.
Any statements regarding potential mineralisation, drill targets, grades, scale or development concepts are conceptual in nature and
based on early-stage exploration activities, including geological mapping, surface sampling, auger drilling, geochemical analysis,
geophysical surveying and early-stage RC drilling. These statements do not constitute, and should not be construed as, a Mineral
Resource or Ore Reserve estimate as defined under the JORC Code. Dalaroo Metals Limited undertakes no obligation to update or revise
any forward-looking statements, except as required by law.
About Dalaroo Metals
Dalaroo Metals Limited is an ASX-listed exploration company focused on the discovery and development
of high-quality gold and critical minerals projects across Australia and international jurisdictions.
The Company’s portfolio includes the Blue LagoonProject in south-west Greenland, prospective for rare
earth elements (REE), zirconium and niobium, a rapidly growing portfolio of gold exploration assets in
Côte d’Ivoire, including the Bondoukou Gold Ridge Project within the highly endowed Birimian
Greenstone Belt of West Africa, and the Lyons River and Watheroo Projects in Western Australia.
Dalaroo’s strategy is to systematically advance its projects through modern exploration techniques,
resource definition, and strategic partnerships, with a strong focus on value creation for shareholders.
The Company is committed to responsible exploration, strong corporate governance and building long-
term stakeholder relationships in the regions in which it operates.
dalaroometals.com.au | ASX: DAL
13
dalaroometals.com.au | ASX: DAL
Appendix 1 – JORC Code, 2012 Edition – Table 1
Table 2. Drill collar details, BDRC003 to BDRC010C. Grid: WGS84 / UTM Zone 30N.
Hole ID Easting
(m)
Northing
(m)
RL (m) Azimuth
(°)
Dip (°) Planned
depth
(m)
Depth
(m)
Status
BDRC003 493377 896256 393 45 -60 250 200 Completed
BDRC004 493466 896339 387 225 -60 250 200 Completed
BDRC005 492943 896399 363 45 -60 220 220 Completed
BDRC006 493040 896482 366 46 -60 150 150 Completed
BDRC007 493009 896585 367 45 -60 220 220 Completed
BDRC008 493046 896631 373 45 -60 150 150 Completed
BDRC009 492618 896909 341 45 -60 150 150 Completed
BDRC010A 492548 896838 354 45 -60 250 174 Abandoned
BDRC010B 492543 896837 350 45 -60 250 96 Abandoned
BDRC010C 492550 896847 354 45 -60 250 232 Completed
Notes: Collar coordinates and RLs are from handheld GPS (approximately ±5–10 m horizontal accuracy) and all collar points are intended to be picked up
by a qualified surveyor at the end of the program. BDRC010A, BDRC010B and BDRC010C were drilled from the same drill pad; the BDRC010A position is
the planned collar. BDRC003 and BDRC004 were ended at 200 m due to excessive water. BDRC010A and BDRC010B were stopped due to casing failure.
BDRC010C was completed at 232 m. All depths are downhole; true widths are not known.
Section 1 – Sampling Techniques and Data
Criteria Commentary
Sampling
techniques
Samples comprise reverse circulation (RC) drill cuttings collected over nominal 1 m
downhole intervals. Each interval is collected through the drill cyclone and split using a
riffle splitter to produce a representative laboratory sample weighing approximately 3 kg.
The remainder of each interval is retained at the drill site. Sample condition, including
whether samples are dry, moist or wet, is visually monitored during drilling.