Half Yearly Report and Accounts
Released
Released
Announcement PDF
`
DALAROO METALS LTD
ABN 23 648 476 699
INTERIM FINANCIAL REPORT
For the Half -Year Ended 31 December 2023
DALAROO METALS LTD
ABN 23 648 476 699
CONTENTS PAGE
Page
Corporate Directory
3
Directors’ Report
4
Auditor’s Independence Declaration
17
Condensed Statement of Profit or Loss and Other Comprehensive
Income
18
Condensed Statement of Financial Position
19
Condensed Statement of Changes in Equity
20
Condensed Statement of Cash Flows
21
Notes to the Financial Statements
22
Directors’ Declaration
31
Independent Audit Report
32
2
DALAROO METALS LTD
ABN 23 648 476 699
CORPORATE DIRECTORY
Directors
David Quinlivan – Non Executive Chairman
Robert Beeck – Non Executive Director
Harjinder Kehal – Managing Director
Company secretary
John Arbuckle
Registered office
Suite 1, 346 Barker Road
Subiaco WA 6008
Principal place of business
Suite 1, 346 Barker Road
Subiaco WA 6008
Share register
Advanced Share Registry Services Ltd
110 Stirling Highway
Nedlands WA 6009
Auditor
Crowe Perth
Level 24, 77 St Georges Terrace
Perth, WA 6000
Solicitors
AGH Law
Level 1, 50 Kings Park Road
West Perth WA 6005
Stock Exchange Listing
Dalaroo Metals Ltd is listed on the Australian Securities
Exchange.
Home exchange:
Perth, Western Australia
ASX code:
DAL
Website
www.dalaroometals.com.au
Company Information
The Company was incorporated and registered under the Corporations Act 2001 in Western
Australia.
The Company is domiciled in Australia.
3
DALAROO METALS LTD
ABN 23 648 476 699
DIRECTORS’ REPORT
The Directors present their interim report of Dalaroo Metals Ltd (Dalaroo or the Company) for the halfyear ended 31 December 2023.
DIRECTORS
The following persons were Directors of Dalaroo during the whole of the period and up to the date of
this report, (unless otherwise stated):
David Quinlivan
Harjinder Kehal
Robert Beeck
(Non-Executive Chairman)
(Managing Director)
(Non-Executive Director)
COMPANY SECRETARY
John Arbuckle
PRINCIPAL ACTIVITIES
The principal activity of the Company during the financial period was mineral exploration for resources
at the Company’s Namban and Lyons River projects located in Western Australia which are prospective
for Pb-Zn-Cu-Ag, Au, REE and PGE-Ni-Cu-Au deposits respectively.
REVIEW OF OPERATIONS
Dalaroo’s Lyons River Project comprises a strategic (100% owned) land position of 838km2 within the
Proterozoic Mutherbukin Zone of the Gascoyne Province, Western Australia. Lyons River is prospective
for, BHT type mineralised base metals (Pb-Zn-Ag-Cu), vein/shear related gold, REE and lithium deposits
(Figure 1).
Base metals
High grade copper assay results of 54.8% coupled with silver grades of 80g/t have been returned from
rock chip sampling program over the expanded 3.5km X 2km Browns base metal prospect (Figure 2).
Gossanous outcrops sampled to the east of the AC drilled area at Browns have returned lead (Pb)
values of up to 0.53% complemented by anomalous zinc (1140ppm) and copper (420ppm) at the Lyons
River Project (Refer DAL ASX Announcements from 31 October 2023). Copper assays of 1.64% have
also been recorded from rock chip sampling previously completed at the Four Corners prospect located
5km to the west of Browns (Refer DAL ASX Announcements from 16 March 2022) (Figure 9).
Previous historical shallow RC drill program in 2008 at Four Corners returned an intersection of 3m @
0.50% Cu including 1m @ 0.92% Cu from 56m, with mineralisation associated chalcopyrite (Refer DAL
ASX Announcements from 16 March 2022). Copper assay results from rock chip sampling both Browns
and Four Corners prospects are accompanied by silver assays of 80g/t and 21.5g/t respectively.
Gold
Gold mineralization in outcropping quartz veins at the Goodbody West Prospect has been bolstered by
recent results from further systematic sampling. Infill soil sampling has outlined robust gold in soil
anomalies with peak gold values of 132 ppb Au at Goodbody West, 93ppb Au at Goodbody Central and
50ppb Au at Goodbody East, complemented by outcropping, mineralized, gold-rich quartz veins. The
footprint of the gold mineralized rock-chips within the broader Goodbody Prospect lie within a broader,
6km long, gold in soil anomaly at 2ppb threshold (Figures 3 and 4). (Refer DAL ASX Announcements
from 8 November 2023).
At Goodbody infill and close spaced systematic soil sampling completed has defined the following:
• Goodbody West gold in soil anomaly above 10ppb Au has been defined over a strike length
of 450m.
• Goodbody Central gold in soil anomaly above 10ppb Au has been defined over a strike length
of 300m.
• Goodbody East gold in soil anomaly above 10ppb Au has been defined over a strike length of
500m.
4
DALAROO METALS LTD
ABN 23 648 476 699
DIRECTORS’ REPORT
Figure 1: Dalaroo Metals, Lyons River Project in the Gascoyne Province REE and lithium neighbouring
companies and prospects
The sampled quartz veins are typically 5-30cm thick and are comprised of mainly quartz with minor
biotite and locally, ferruginous oxide phases. They form sub-parallel to the pervasive structural fabric
within foliation planes and commonly contain internal breccia zones consisting of Fe-oxide and silicarich matrices, surrounding fragmented quartz vein clasts. The samples were composed of either vein
material, the adjacent wall rocks, or a combination of both. At Goodbody West, gold concentrations
including 1.42g/t, 1.70g/t and 5.52g/t (Figure 3) have been returned from Dalaroo’s sampling of a
particular set of quartz veins, hosted within a metasedimentary rock package comprising pelitic schist,
siliceous chert, ironstone and BIF-style units. Historic rock chip sampling of quartz veins in this area
returned up to 6.25g/t Au. In the Goodbody Central target area, pelitic schists are the dominant host
rocks but zones of iron-oxide-rich, siliceous vein breccias and quartz-biotite-altered wall rocks are also
prevalent (e.g. sample 230105_23, 0.48g/t Au). (Refer DAL ASX Announcements from 1 February
2023).
5
DALAROO METALS LTD
ABN 23 648 476 699
DIRECTORS’ REPORT
Four Corners
Browns
Figure 2: Browns prospect, Pb soil geochemical anomalies (previously reported) and Pb rock chip sample
assays, high-grade copper rock chip sample location and proposed Induced Polarisation survey lines
It is noted that high-tenor soil anomalies and multiple rock-chip assays up to 5.52g/t Au (5520 ppb Au)
associated with the Goodbody West, Central and East targets spatially coincide with intersections
between interpreted WNW and NNE-trending structures (Figures 3 and 4). Such structural intersection
zones represent potential zones of intensified deformation, that may be associated with favourable sites
of hydrothermal fluid movement and gold mineralization. As such, the Goodbody gold targets are
considered high priority for follow-up exploration work. (Refer DAL ASX Announcements from 28
November 2022 and 1 February 2023).
Turbo Well
A new gold target has been defined at Turbo Well with gold-in-soil anomalism extending over a strike
length of 2km, adjacent to a regional ESE structural trend (Figure 4). A peak value of 47ppb Au is
defined from results of both historical soil sampling and follow-up sampling by Dalaroo this year (Refer
DAL ASX Announcements from 8 November 2023).
6
DALAROO METALS LTD
ABN 23 648 476 699
DIRECTORS’ REPORT
Figure 3: Location of recent rock chip samples within the Goodbody gold prospect area and soil geochemical
anomalies. Overlaid on greyscale Total Magnetic Intensity (TMI)1VD basemap imagery
Figure 4: Location of Goodbody prospect in relation to additional gold prospects and interpreted regional
structures within Lyons River Project area. Overlaid on greyscale Total Magnetic Intensity (TMI) 1VD base map
7
DALAROO METALS LTD
ABN 23 648 476 699
DIRECTORS’ REPORT
Lithium
Assessment of Lyons River Project wide lithium in soil geochemical data comprising 3,856 samples
highlighted north-trending faults in the D5 Edmundian shear zones and the possible flow of Li-rich melts
into the fault compartments in the central part of Lyons River Project (Figure 5).
Figure 5: Lyons River Project – Major shear zone/corridor active during the Edmundian Orogeny,
with potential for lithium bearing pegmatites
A total of 813 soil samples were collected. One of the lithium targets (3km long and 0.5km wide) had a
peak value of 334 ppm Li2O and is comparable to lithium anomalism obtained by Dalaroo’s neighbours
(Refer MI6 ASX Announcement dated 25 July 2023 and 10 October 2023). Importantly, the lithium
targets lie within the large pegmatite cluster measuring 9km X 6km in the eastern part of the project,
where pegmatites up to 100m wide and 3km long have been mapped. The significant lithium anomalism
outlined to date remains open to the south, west and east (Figures 6 and 7). Exploration was tracked
to complete rock chip sampling over View Hill and at other lithium anomalies to define spodumenebearing pegmatites with drill planning in progress.
In November 2023, Dalaroo executed a binding agreement (Sale Agreement) with Delta Lithium
Limited (ASX: DLI or Delta Lithium) to sell the rights to lithium, caesium and tantalum minerals
(Lithium Minerals) at its Lyons River Project (Lithium Mineral Rights). The consideration of
$1,000,000 for the transaction comprised $500,000 in cash and $500,000 of DLI ordinary shares. In
addition to the consideration, Delta Lithium must expend a minimum of 50% of the annual statutory
expenditure requirements on the Lyons River Project tenements (a commitment of $280,000 per annum
at the date of the Sale Agreement) for a period of 3 years from Completion. The Company will still retain
ownership of the Lyons River Project tenure (Table 1) and hold rights to all other metals and minerals
apart from the Lithium Minerals (Refer DAL ASX announcement dated 1 December 2023).
8
DALAROO METALS LTD
ABN 23 648 476 699
DIRECTORS’ REPORT
Figure 6: Structural domain map with north-south faults and significant lithium targets
outlined at View Hill Lyons River Project
Figure 7: View Hill: lithium soil geochemistry showing main anomalous trends, open to the south, west and east.
9
DALAROO METALS LTD
ABN 23 648 476 699
DIRECTORS’ REPORT
Rare Earth Elements (REE)
Two significant Rare Earth Element (REE) anomalies have been outlined at View Hill and 32 Mile Well
prospects. REE anomalism at View Hill with peak value of 1,043 ppm TREO (Total Rare Earth Oxides)
and strike length of 2.2km coincides with large thorium high. REE anomalism at 32 Mile Well with a peak
value of 2,025 ppm TREO has a strike length of more than 3km (Figure 8).
REE anomalies lie adjacent to a major NE-trending structural feature, compatible with relationships seen
at Kingfisher Mining’s Mick Well REE discovery. Anomalies could represent hard rock or clay hosted
REE mineralisation.
Figure 8: TREO results on radiometrics thorium/google image (note coincident large thorium and TREO anomaly
at View Hill prospect).
10
DALAROO METALS LTD
ABN 23 648 476 699
DIRECTORS’ REPORT
Next Steps at Lyons River
Gold
With the completion of the heritage surveys over Goodbody West, Goodbody Central and Goodbody
East and POW approvals in place, a focused air-core and/or shallow RC drill program is proposed to
take place in February 2024. Further systematic soil sampling is proposed at the 2km strike length Turbo
Well prospect. In addition, rock-chip sampling will be undertaken of outcropping quartz veins to outline
the surface expression of the gold mineralisation.
Copper/Pb-Zn-Ag
Dalaroo proposes to carry out a Dipole-Dipole Induced Polarisation (DDIP) geophysical surveys in the
next phase of exploration at the Browns prospect (Figure 9). The goal of these surveys will be the
delineation of a mineralised body at depth that possesses not just the surface geochemical signature,
but also the geophysical properties characteristic of a significant BHT/SEDEX deposit and copper
mineralisation in the Browns Prospect area prior to the EIS diamond drill program (Figures 2 and 10).
(Refer DAL ASX Announcements from 26 April 2023).
Deeper diamond drilling is expected to allow a better understanding of the geological transition to more
pyritic and phyllosilicate-rich units identified at the southern limits of the drill tested area interpreted to
represent a transition in the pre-metamorphic protolith stratigraphy to lower energy sedimentary units,
considered more prospective for BHT/SEDEX type deposits (Figures 2 and 11).
Figure 9: Lyons River, Browns prospect and other five Pb-Zn soil geochemical prospects /targets
over greyscale 1 Vertical Derivative Aeromagnetics image.
11
DALAROO METALS LTD
ABN 23 648 476 699
DIRECTORS’ REPORT
Figure 10: Map view of aircore drilling completed at Browns on ground gravity data basemap.
Figure 11: Browns prospect, simplified cross section A-B (see Figure 5) displaying selected mineralised drilling
intercepts.
12
DALAROO METALS LTD
ABN 23 648 476 699
DIRECTORS’ REPORT
Namban in the Wheatbelt Region of Western Australia
PGE-Ni-Cu
The Manning Prospect is located 150km north of Perth and 90km north of Chalice Mining’s world class
Julimar Ni-Cu-PGE Project (Figures 6 and 10). The drilling program was designed to test large Ni-CuPGE*+Au geochemical anomalies (Pd soil anomaly with a peak value of 28 ppb coincident with Cu peak
value of 605 ppm and Ni peak value of 206 ppm) covering an area of 2km X 0.5km that are coincident
with Induced Polarisation (IP) anomalies with high chargeability values of up to 40 mV/V.
Maiden diamond drilling program over Dalaroo’s 100% owned Manning Prospect has intersected copper
sulphide mineralisation and gold mineralisation west of MI6’s Moora Project along strike of the Mt Yule
Trend. The diamond drill program at Manning was partly funded by the Exploration Incentive Scheme
(EIS) grant awarded to Dalaroo by the Government of Western Australia.
Elevated copper, gold and silver assays up to 0.11% Cu, 0.61 g/t Au and 14.5 g/t Ag were intersected
in the drilling program (Figure 12). Host lithologies are interpreted as differentiated intrusive mafic rocks
(gabbroic dolerites) believed to be part of a larger (dismembered) intrusive mafic sill complex within a
sequence of high-grade metamorphic rocks (gneisses/granulites) that remains prospective for magmatic
intrusion hosted Ni-Cu-PGE-Au mineralisation at Namban.
Figure 12: Namban Project – Manning prospect: Contoured soil anomalies, diamond drill hole locations and
bedrock anomalies. Contours >5ppb Au contours in red; >75ppm Cu in green; >100ppm Ni in magenta; >5ppb Pt
in blue
13
DALAROO METALS LTD
ABN 23 648 476 699
DIRECTORS’ REPORT
Figure 13: Namban Project Location along the northern extent of the arcuate Julimar – Yule Corridor, truncated
by the Darling Fault (dark blue) to the west. Image is 1VD-RTP magnetics draped with Bouger Gravity
14
DALAROO METALS LTD
ABN 23 648 476 699
DIRECTORS’ REPORT
Two orientations of chlorite-sulphide veinlets/fractures trending subvertical north-west and north northwest were logged in the holes. A steep NW plunge is inferred from the intersection of the vein sets. The
sulphide intersections comprising chalcopyrite-pyrite+/- pyrrhotite rich zones in MNDD004. Pyritecarbonate alteration was noted in fractured felsic dykes that are NNW trending and are coincident with
the regional copper and gold trend around the margins of the interpreted Julimar-Mt Yule Gravity corridor
depicted in Figure 13.
Next Steps at Namban
Given the significant size of the surface geochemical anomalism (Ni-Cu-PGE*+Au) outlined (measuring
2km X 0.5km) at the Manning Prospect and only four holes drilled using Dalaroo’s successful grant
under the EIS of $175,000, further exploration work is warranted. Future work at the Manning Prospect
will include ground gravity surveys, which are expected to complement and expand upon the existing
geochemical and geophysical datasets which have helped to delineate encouraging sulphide copper
and gold mineralisation.
Gravity surveys will provide additional insight through mapping the local density variation and potentially
define deep seated intrusions or sources to the base metal mineralisation and differentiate prospective
mafic and gabbroic units from the more recent Proterozoic dolerite dykes which trend through the project
and provide targets for potential follow up drill programs.
The net loss after income tax for the half-year was $315,298 (2022 loss restated: $1,211,637).
Operations during the reporting period were primarily focused on exploration and resource development
at the Company’s Lyons River and Namban Projects in Western Australia.
At the end of the half-year the Company had $742,251 in cash (30 June 2023: $843,411). Capitalised
mineral exploration and evaluation expenditure (including acquisition costs) is $971,759 (30 June 2023:
$971,759).
SIGNIFICANT CHANGES IN THE STATE OF AFFAIRS
There have been no significant changes in the state of affairs of the Company during or since the end
of the financial period.
MATTERS SUBSEQUENT TO THE END OF THE FINANCIAL PERIOD
There has not arisen in the interval between the end of the financial period and the date of this report
any item, transaction or event of a material and unusual nature likely, in the opinion of the Directors of
the Company to affect substantially the operations of the Company, the results of those operations or
the state of affairs of the Company in subsequent financial years.
AUDITOR’S INDEPENDENCE DECLARATION
A copy of the Auditor’s Independence Declaration as required under Section 307C of the Corporations
Act is set out on the following page.
This report is made in accordance with a resolution of the Directors.
DATED at Perth this 7th day of March 2024.
David Quinlivan
Chairman
15
DALAROO METALS LTD
ABN 23 648 476 699
DIRECTORS’ REPORT
COMPETENT PERSON
The information in this report that relates to Exploration results is based on information compiled by
Dalaroo Metals Ltd and reviewed by Mr Harjinder Kehal who is the Managing Director of the Company
and is a Registered Practicing Geologist and Member of the AusIMM and AIG. Mr Kehal has sufficient
experience that is relevant to the style of mineralisation, the type of deposit under consideration and to
the activities undertaken to qualify as a Competent person as defined in the 2012 edition of the
“Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr
Kehal consents to the inclusion in this report of the matters based on this information in the form and
context in which it appears.
FORWARD-LOOKING INFORMATION
This report may include forward-looking statements. Forward-looking statements include, but are not
limited to, statements concerning the planned exploration program and other statements that are not
historical facts. When used in this report, the words "could", "plan", "estimate", "expect", "intend",
"should" and similar expressions are forward-looking statements. Although Dalaroo believes that its
expectations reflected in these forward-looking statements are reasonable, such statements involve
risks and uncertainties and no assurance can be given that actual results will be consistent with these
forward-looking statements.
CAUTIONARY NOTE
The statements and information contained in this report are not investment or financial product advice
and are not intended to be used by persons in deciding to make an investment decision. In releasing
this report, Dalaroo has not considered the objectives, financial position or requirements of any particular
recipient. Accordingly, potential investors should obtain financial advice from a qualified financial advisor
prior to making an investment decision.
NO NEW INFORMATION
Except where explicitly stated, this report contains references to prior exploration results, all of which
have been cross-referenced to previous market announcements made by the Company. The Company
confirms that it is not aware of any new information or data that materially affects the information included
in the relevant market announcements.
16
AUDITOR’S INDEPENDENCE DECLARATION
In accordance with the requirements of section 307C of the Corporations Act 2001, as lead auditor for
the review of Dalaroo Metals Limited for the half year ended 31 December 2023, I declare that, to the
best of my knowledge and belief, there have been:
a) no contraventions of the auditor independence requirements of the Corporations Act 2001 in
relation to the review; and
b) no contraventions of any applicable code of professional conduct in relation to the review.
Crowe Perth
Cyrus Patell
Partner
Signed at Perth, 7 March 2024
Findex (Aust) Pty Ltd, trading as Crowe Australasia is a member of Crowe Global, a Swiss verein. Each member firm of Crowe Global is a
separate and independent legal entity. Findex (Aust) Pty Ltd and its affiliates are not responsible or liable for any acts or omissions of Crowe
Global or any other member of Crowe Global. Crowe Global does not render any professional services and does not have an ownership or
partnership interest in Findex (Aust) Pty Ltd. Services are provided by Crowe Perth, an affiliate of Findex (Aust) Pty Ltd.
© 2023 Findex (Aust) Pty Ltd
DALAROO METALS LTD
ABN 23 648 476 699
CONDENSED STATEMENT OF PROFIT OR LOSS AND OTHER COMPREHENSIVE INCOME
FOR THE HALF-YEAR ENDED 31 DECEMBER 2023
Half Year to
31 December 2023
$
Half Year to
31 Dec 2022
Restated
$
Note
Other income
11
1,031,391
6,006
1,031,391
6,006
(304,601)
(262,716)
Professional Fees
(35,760)
-
Marketing and promotion
(29,888)
(24,795)
Finance costs
(1,894)
(4,053)
Depreciation
(45,051)
(41,868)
Administration and Other expenses
(104,495)
(126,787)
Loss on Revaluation of Listed entities
(21,579)
-
(72,724)
(12,252)
Exploration costs expensed
(730,697)
(745,172)
Loss before income tax
(315,298)
(1,211,637)
-
-
(315,298
(1,211,637)
-
-
(315,298)
(1,211,637)
(0.41)
(2.24)
Total income
Expenses
Staff costs and director fees
12
Share Based Payments
10
Income tax benefit/(expense)
Loss for the half year
Other comprehensive income
Total comprehensive loss for the half year
Loss per share
Basic and diluted loss per share (cents)
The above condensed statement of profit or loss and other comprehensive income should be read in
conjunction with the accompanying notes.
18
DALAROO METALS LTD
ABN 23 648 476 699
CONDENSED STATEMENT OF FINANCIAL POSITION
AS AT 31 DECEMBER 2023
Note
Current assets
Cash and cash equivalents
Financial Assets
Trade and other receivables
Prepayments
Total current assets
5
6
Non-current assets
Property, Plant & equipment
Right of use assets
Exploration & Evaluation Assets
Total non-current assets
Total assets
7
Current liabilities
Trade and Other payables
Lease Liability
Employee Benefits Provision
Shareholder Advances
Total current liabilities
8(a)
8(b)
Non-current liabilities
Employee Benefits Provision
Total non-current liabilities
Total liabilities
Net assets
Equity
Issued capital
Reserves
Accumulated losses
Total equity
9
10
Half year as at
31 December 2023
$
Full year as at
30 June 2023
$
742,251
478,421
14,812
27,103
1,262,587
843,411
39,822
22,129
905,362
44,140
38,677
971,759
1,054,576
2,317,163
50,514
77,354
971,759
1,099,627
2,004,989
286,025
41,502
45,670
373,197
316,457
81,831
39,485
27,000
464,773
4,291
4,291
377,488
1,939,675
1,692
1,692
466,465
1,538,524
7,312,884
161,515
(5,534,724)
1,939,675
6,669,159
88,791
(5,219,426)
1,538,524
The above statement of condensed financial position should be read in conjunction with the
accompanying notes.
19
DALAROO METALS LTD
ABN 23 648 476 699
CONDENSED STATEMENT OF CHANGES IN EQUITY
FOR THE HALF-YEAR ENDED 31 DECEMBER 2023
Issued
Capital
$
Accumulated
Losses
$
Reserves
$
Total
$
2022
Balance at 1 July 2022
6,032,624
(2,746,725)
5,000
3,290,899
Loss for the period (restated)
-
(1,211,637)
-
(1,211,637)
Shares issued (net of costs)
-
-
-
-
Share based payments
-
-
12,252
12,252
6,032,624
(3,958,362)
17,252
2,091,514
6,669,159
(5,219,426)
88,791
1,538,524
-
(315,298)
-
(315,298)
Comprehensive Income:
Balance at 31 December 2022
2023
Balance at 1 July 2023
Comprehensive Income:
Loss for the period
Shares issued (net of costs)
643,725
Share based payments
Balance at 31 December 2023
643,725
-
-
72,724
72,724
7,312,884
(5,534,724)
161,515
1,939,675
The above statement of condensed changes in equity should be read in conjunction with the
accompanying notes.
20
DALAROO METALS LTD
ABN 23 648 476 699
CONDENSED STATEMENT OF CASH FLOWS
FOR THE HALF-YEAR ENDED 31 DECEMBER 2023
Note
Half Year to
31 December
2023
$
Half Year to
31 December
2022
$
Cash flows from operating activities
Receipts from customers
Interest received
Other income
Funds from Government Grants
Payments to suppliers and employees (corporate)
Payments to suppliers and employees (exploration)
4,400
3,072
23,919
(455,489)
(751,787)
3,650
2,356
(418,423)
(809,073)
(1,175,885)
(1,221,490)
Proceeds from disposal of mineral rights
Payments for property, plant and equipment
500,000
-
(50,110)
Net cash flows from/(used in) investing activities
500,000
(50,110)
Proceeds from the issue of shares and options
Payments for share issue costs
Repayment of lease liabilities
670,500
(53,775)
(42,000)
(42,134)
Net cash flows from/(used in) financing activities
574,725
(42,134)
Net (decrease)/increase in cash held
(101,160)
(1,313,734)
Net cash flows used in operating activities
Cash flows from investing activities
Cash flows from financing activities
Cash at the beginning of the period
5
843,411
1,675,897
Cash at the end of the period
5
742,251
362,163
The above statement of condensed cash flows should be read in conjunction with the accompanying
notes.
21
DALAROO METALS LTD
ABN 23 648 476 699
NOTES TO THE INTERIM FINANCIALS STATEMENTS
FOR THE HALF- YEAR END 31 DECEMBER 2023
Note 1 Basis of preparation of half-year report
Statement of compliance
The half-year financial report is a general purpose financial report prepared in accordance with
the Corporations Act 2001 and AASB 134 Interim Financial Reporting. Compliance with AASB
134 ensures compliance with International Financial Reporting Standard IAS 34 Interim
Financial Reporting. The half-year report does not include notes of the type normally included
in an annual financial report and shall be read in conjunction with the 30 June 2023 annual
financial statements.
The Company is a for profit entity for financial reporting purposes under Australian Accounting
Standards.
The half-year financial report was approved by the Board of Directors on 7th March 2024.
Basis of preparation
The financial statements have been prepared on the basis of historical cost, except for the
revaluation of certain non-current assets and financial instruments. Cost is based on the fair
values of the consideration given in exchange for assets. All amounts are presented in
Australian dollars, unless otherwise noted.
The accounting policies and methods of computation are consistent with those previously
disclosed in the 30 June 2023 annual financial statements, except for the new accounting
policies adopted by the Company during the period, as disclosed below:
Investments and other financial assets
Investments and other financial assets are initially measured at fair value. Transaction costs
are included as part of the initial measurement, except for financial assets at fair value through
profit or loss. Such assets are subsequently measured at either amortised cost or fair value
depending on their classification.
Classification is determined based on both the business model within which such assets are
held and the contractual cash flow characteristics of the financial asset unless, an accounting
mismatch is being avoided.
Financial assets are derecognised when the rights to receive cash flows have expired or have
been transferred and the company has transferred substantially all the risks and rewards of
ownership. When there is no reasonable expectation of recovering part or all of a financial
asset, its carrying value is written off.
Financial assets at fair value through profit or loss
Financial assets not measured at amortised cost or at fair value through other comprehensive
income are classified as financial assets at fair value through profit or loss. Typically, such
financial assets will be either:
i)
ii)
held for trading, where they are acquired for the purpose of selling in the short-term
with an intention of making a profit, or a derivative; or
designated as such upon initial recognition where permitted. Fair value movements
are recognised in profit or loss.
22
DALAROO METALS LTD
ABN 23 648 476 699
NOTES TO THE INTERIM FINANCIALS STATEMENTS
FOR THE HALF-YEAR END 31 DECEMBER 2023
Fair Value
A number of the company’s accounting policies and disclosures require the determination of
fair value, for both financial and non-financial assets and liabilities. Fair values have been
determined for measurement and/or disclosure purposes based on the following methods:
Investments in equity securities
The fair value of financial assets at fair value through profit or loss, is determined by reference
to their quoted bid price at the reporting date. For investments with no active market, fair value
is determined using valuation techniques. Such techniques include using recent arm’s length
market transactions, reference to the current market value of another instrument that is
substantially the same, discounted cash flow analysis and option pricing models.
Going concern basis for preparation of financial statements
This half-year interim financial report has been prepared on a going concern basis, which
contemplates continuity of normal business activities and the realisation of assets and
settlement of liabilities in the ordinary course of business. During the half-year ended 31
D
Share your feedback
Discover