Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
ASX ANNOUNCEMENT:
ASX: DAL
31 October 2024
Quarterly Activities Report
For Period Ended 30 September 2024
______________________________________________________________________________
Highlights
Dalaroo Successfully Raises $2.65 million
•
Placement to raise $2.65 million (before costs) at $0.016 per share with a 1 free attaching
option for every 1 share subscribed for under the placement (exercisable at $0.036, expiring 5
years from their issue date) completed.
Lyons River Project, Gascoyne Region of Western Australia
Gold System Discovery at Goodbody
•
•
•
Preparations well underway at the Goodbody Gold Discovery for co-funded Government
Exploration Incentive Scheme diamond drilling program at the Lyons River Project, Gascoyne
Province in Western Australia.
Drilling and works contractors have been engaged, with all the necessary approvals in place.
Four deep diamond drill holes will test below highly encouraging air core intersections defined
at Goodbody during the June quarter 2024 including:
LRAC047: 5m @ 0.85g/t Au from 9m including 1m @ 1.83g/t Au from 9m and 1m @
1.23g/t Au from 12m
o LRAC049: 1m @ 0.98g/t Au from 3m
o LRAC051: 1m @ 1.17g/t Au from 19m
o LRAC052: 19m @ 0.23g/t Au from 24m
Gold mineralisation at Goodbody West remains open along strike and at depth.
Diamond drill program to build on the highly encouraging first pass results.
Drilling at Goodbody commencing against a backdrop of an all-time high gold price.
o
•
•
•
Browns Pb-Zn-Ag-Cu prospect
Dalaroo has completed a deep diamond drilling program at its Browns prospect.
Program was partly funded by the Exploration Incentive Scheme sponsored by the
Government of Western Australia with a grant for an amount of up to $180,000.
Corporate
• Mr Michael Brown, an experienced geologist and CEO with over 30 years’ experience in
exploration, mining, energy, finance and capital markets was appointed as Managing Director
and Chief Executive Officer on 21 October 2024.
•
•
Lyons River Project
Dalaroo Metals Ltd (ASX: DAL, “Dalaroo” or “Company”) is pleased to provide an update on its activities
during the June Quarter 2024. Dalaroo’s Lyons River Project comprises a strategic (100% owned) land
position of 838km2 within the Proterozoic Mutherbukin Zone of the Gascoyne Province, Western
Australia. Lyons River is prospective for, vein/shear related gold, BHT type mineralised base metals (PbZn-Ag-Cu) and REE deposits (Figure 1).
Figure 1: Dalaroo Metals, Lyons River Project prospects in the Gascoyne Province showing neighbouring
companies and their prospects.
2
Gold System Discovery at Goodbody
Preparations have commenced for a diamond drilling program at its Goodbody Gold Prospect, Lyons
River Project (Figure 1). The diamond drill program will be partly funded by the Exploration Incentive
Scheme (“EIS”) sponsored by the Government of Western Australia. Dalaroo’s application was successful
in Round 29 of the Western Australian Government’s EIS with an award of a $100,000 grant to co-fund
50% of the direct diamond drilling cost.
Four diamond drill holes are planned (see Figure 2). The identification of sulphide-bearing quartz veins,
in association with wide silica-sericite alteration haloes and strong Au-As anomalism from the current
shallow levels of drilling are considered indicative of a significant hydrothermal system. Mineralisation
remains open at depth and to the east and requires deeper drilling to assess the potential for structurally
controlled high-grade zones. It is noted that surface anomalism at Goodbody West coincides with the
intersection of WNW and NNE-trending structures (refer DAL ASX Announcement from 8 November
2023). Such intersection zones represent potential sites of intensified deformation and hydrothermal
fluid movement.
Figure 2: Goodbody West gold prospect and interpreted regional structures.
AC drill holes and to be drilled diamond drill hole locations.
3
Browns: Pb-Zn-Ag
Emerging Broken Hill Type (“BHT”) /Sedimentary Exhalative (“SEDEX”) Deposit Setting
Dalaroo has completed a deep diamond drilling program at its Browns prospect, Lyons River Project. The
diamond drill program was partly funded by the Exploration Incentive Scheme sponsored by the
Government of Western Australia with a grant for an amount of up to $180,000.
Figure 3: Lyons River Project, Browns prospect and other five Pb-Zn soil geochemical prospects /targets over
greyscale 1 Vertical Derivative Aeromagnetics image.
Namban Project
The Manning Prospect is located 150km north of Perth and 90km north of Chalice Mining’s world class
Julimar Ni-Cu-PGE Project (Figure 4).
A diamond drill program partly funded by Dalaroo’s successful application in Round 26 of the Exploration
Incentive Scheme (EIS) sponsored by the Government of Western Australia (grant was for an amount of
up to $175,000, structured as a contribution towards 50% of direct drilling cost) was designed to test
large Ni-Cu-PGE*+Au geochemical anomalies (Pd soil anomaly with a peak value of 28ppb coincident
with Cu peak value of 605ppm and Ni peak value of 206ppm) covering an area of 2km X 0.5km that are
coincident with Induced Polarisation (IP) anomalies with high chargeability values of up to 40 mV/V.
Elevated copper, gold and silver assays up to 0.11% Cu, 0.61g/t Au and 14.5g/t Ag were intersected in
the drilling program.
4
Figure 4: Namban Project Location along the northern extent of the arcuate Julimar – Yule Corridor, truncated by
the Darling Fault (dark blue) to the west. Image is 1VD-RTP magnetics draped with Bouger Gravity
5
Next Steps at Namban
Given the significant size of the surface geochemical anomalism (Ni-Cu-PGE*+Au) outlined (measuring
2km X 0.5km) at the Manning Prospect and only four holes drilled using Dalaroo’s successful grant under
the EIS $175,000, further exploration work is warranted. Future work at the Manning Prospect will
include ground gravity surveys, which are expected to complement and expand upon the existing
geochemical and geophysical datasets which have helped to delineate encouraging sulphide copper and
gold mineralisation.
Gravity surveys will provide additional insight through mapping the local density variation and
potentially define deep seated intrusions or sources to the base metal mineralisation and differentiate
prospective mafic and gabbroic units from the more recent Proterozoic dolerite dykes which trend
through the project and provide targets for potential follow up drill programs.
New Projects
Dalaroo is actively seeking out new complementary projects which have the potential to generate value
for all shareholders.
Corporate
As at the date of this report, the Company has the following securities on issue:
Security Type
Fully Paid Ordinary Shares
Number
248,375,000
Unlisted Options - exercisable at $0.25 each, expiring 28 September 2025
8,000,000
Unlisted Options – exercisable at $0.08 each, expiring 5 July 2025
14,375,000
Unlisted Options – exercisable at $0.036 each, expiring 23 August 2029
182,187,500
Performance Rights
11,900,000
Tranche 2 of the share placement (refer to ASX Announcements dated 25 June 2024) was approved by
the Company’s shareholders at a General Meeting of shareholders conducted on 19 August 2024. All
resolutions considered by shareholders at the General Meeting were passed (refer to ASX
Announcement dated 19 August 2024) and the share placement completed on 23 August 2024 (refer
ASX Announcement dated 23 August 2024).
On 21 October 2024, Mr Michael Brown was appointed as the Managing Director and Chief Executive
Officer of Dalaroo. Mr Brown is an experienced geologist and CEO and has over 30 years’ experience in
exploration, mining, energy, finance and capital markets. Previously he led both ASX (Chesser Resources
ASX:CHZ) and TSX (Argentex Mining TSXV:ATX) companies, successfully delivering on business strategy
and shareholder returns. He led the blind greenfield discovery of Diamba Sud in Senegal as CEO of
Chesser, building the team and the newest gold discovery in Senegal. He is an experienced leader in all
types of companies from junior and private companies to major companies across the world.
6
Mr Brown holds a double Bachelor of Science (Honours-Geology) and Bachelor of Arts from the
University of Melbourne and an MBA from Melbourne Business School. He is also a Member of the
Australian Institute of Geoscientists (Competent Person).
Financial Commentary
The Appendix 5B for the quarter ended 30 September 2024 provides an overview of the Company’s
financial activities. Exploration expenditure for the quarter was $503K. Corporate, staff costs and other
expenditure for the quarter was $248K. The total amount paid to Directors of the Company, their
associates and other related parties was $181K which includes salary and fees and rent paid to Borden
Holdings Pty Ltd (an entity associated with Mr David Quinlivan) for leasing the corporate offices. The
Company’s cash balance at the end of the quarter was $1,939K.
ENDS
For more Information:
Please visit our website for more information: www.dalaroometals.com.au
Michael Brown, Managing Director on +61 466 856 061
Authorised for release to the ASX by the Board of Dalaroo Metals Ltd.
COMPETENT PERSON
The information in this report that relates to Exploration results is based on information compiled by
Dalaroo Metals Ltd and reviewed by Mr Harjinder Kehal who is a Registered Practicing Geologist and
Member of the AusIMM and AIG. Mr Kehal has sufficient experience that is relevant to the style of
mineralisation, the type of deposit under consideration and to the activities undertaken to qualify as a
Competent person as defined in the 2012 edition of the “Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves”. Mr Kehal consents to the inclusion in this report of the
matters based on this information in the form and context in which it appears.
FORWARD-LOOKING INFORMATION
This report may include forward-looking statements. Forward-looking statements include, but are not
limited to, statements concerning the planned exploration program and other statements that are not
historical facts. When used in this report, the words "could", "plan", "estimate", "expect", "intend",
"should" and similar expressions are forward-looking statements. Although Dalaroo believes that its
expectations reflected in these forward-looking statements are reasonable, such statements involve
risks and uncertainties and no assurance can be given that actual results will be consistent with these
forward-looking statements.
7
CAUTIONARY NOTE
The statements and information contained in this report are not investment or financial product advice
and are not intended to be used by persons in deciding to make an investment decision. In releasing this
report, Dalaroo has not considered the objectives, financial position or requirements of any particular
recipient. Accordingly, potential investors should obtain financial advice from a qualified financial
advisor prior to making an investment decision.
NO NEW INFORMATION
Except where explicitly stated, this report contains references to prior exploration results, all of which
have been cross-referenced to previous market announcements made by the Company. The Company
confirms that it is not aware of any new information or data that materially affects the information
included in the relevant market announcements.
ASX Releases during the September Quarter 2024
Description
1 July 2024
Notification regarding unquoted securities - DAL
1 July 2024
Application for quotation of securities - DAL
1 July 2024
Completion of Placement & Notice Under Section 708A(5)(e)
1 July 2024
Notice of General Meeting/Proxy Form
1 July 2024
Quarterly Activities/Appendix 5B Cashflow Report
19 August 2024
19 August 2024: Results Meeting.
23 August 2024
Application for quotation of securities - DAL
23 August 2024
Completion of Placement and Notice under Section 708(5)(e)
23 August 2024
Notification regarding unquoted securities - DAL
23 August 2024
Change of Director’s Interest Notice – Joshua Gordon
23 August 2024
Change of Director’s Interest Notice – Bilal Ahmad
27 August 2024
Becoming a substantial holder – Ifrah Nishat
27 August 2024
Becoming a substantial holder – David Pevcic
27 August 2024
Becoming a substantial holder – Bilal Ahmad
27 August 2024
Ceasing to be substantial holder – Serena Minerals Ltd
29 August 2024
Becoming a substantial holder – Jason Peterson
2 September 2024
Becoming a substantial holder – Kobala Investments
13 September 2024
Ceasing to be substantial holder – Shenton Resources Ltd
24 September 2024
Extension of Managing Director’s Executive Service Agreement
27 September 2024
Annual Report to Shareholders
27 September 2024
Appendix 4G & 2024 Corporate Governance Statement
27 September 2024
2024 Annual General Meeting – Key Dates
30 September 2024
Expiry of Unlisted Options
30 September 2024
Notification of cessation of securities - DAL
8
Tenement Schedule as at 30 September 2024
Interest held at
30 September
2024
Project Name
Location
Tenement Licence
Lyons River
WA
E09/1824
Lyons River
WA
E09/1825
100%
Lyons River
WA
E09/2098
100%
Lyons River
WA
E09/2102
100%
Lyons River
WA
E09/2304
100%
Lyons River
WA
E09/2305
100%
Lyons River
WA
E09/2312
100%
Lyons River
WA
E09/2713
100%
Namban
WA
E70/4694
100%
Namban
WA
E70/4928
100%
Namban
WA
E70/5702
100%
Namban
WA
E70/5494
100%
Namban
WA
E70/5502
100%
Namban
WA
E70/5604
100%
100%
9
About the Lyons River Project
Lyons River is located approximately 1,100km north of Perth and approximately 220 km to the northeast of the coastal town of Carnarvon, Western Australia. The Lyons River Project lies within the
Mutherbukin Zone of the Gascoyne Province, which is the deformed and high-grade metamorphic core
zone of the early Proterozioc Capricorn Orogen (Figure 5).
Figure 5: Lyons River Project location diagram
10
About the Namban Project
Namban Project comprises an under explored ground package totalling 437km2 located in the mid-north
part of the wheatbelt region, deemed by Dalaroo to be prospective for magmatic intrusion related NiCu-PGE deposits. The Company has a 100% controlling interest in the Namban Project, comprising six
tenements extending from the townships of Moora in the south to Three Springs in the north (Figure 6).
Figure 6: Namban Project tenements location map
11
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
DALAROO METALS LTD
ABN
Quarter ended (“current quarter”)
23 648 476 699
30 September 2024
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date
(3 months)
$A’000
2
2
(503)
(503)
(b) development
-
-
(c) production
-
-
(d) staff costs
(97)
(97)
(e) administration and corporate costs
(94)
(94)
(a) exploration & evaluation
1.3
Dividends received (see note 3)
-
-
1.4
Interest received
3
3
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other (provide details if material)
(57)
(57)
1.9
Net cash from / (used in) operating
activities
(746)
(746)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) exploration & evaluation
-
-
(e) investments
-
-
(f)
-
-
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date
(3 months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities
-
-
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
2,451
2,451
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
(176)
(176)
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details If material)
-
-
3.10
Net cash from / (used in) financing
activities
2,275
2,275
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
410
410
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(746)
(746)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
-
-
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
2,275
2,275
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
5.2
Call deposits
5.3
Current quarter
$A’000
Year to date
(3 months)
$A’000
-
-
1,939
1,939
Current quarter
$A’000
Previous quarter
$A’000
1,939
410
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
1,939
410
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
181
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
-
Page 3
3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
8.
Estimated cash available for future operating activities
$A’000
8.1
Net cash from / (used in) operating activities (item 1.9)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(746)
8.4
Cash and cash equivalents at quarter end (item 4.6)
1,939
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
1,939
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
2.60
(746)
-
-
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: N/A
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: N/A
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: N/A
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Date:
31 October 2024
Authorised by: The Board of Dalaroo Metals Ltd
(Name of body or officer authorising release – see note 4)
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Notes
1.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is
encouraged to do so.
2.
If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash
Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting
standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3.
Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity.
4.
If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”.
If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the
[name of board committee – eg Audit and Risk Committee]”. If it has been authorised for release to the market by a
disclosure committee, you can insert here: “By the Disclosure Committee”.
5.
If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as
complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and
Recommendations, the board should have received a declaration from its CEO and CFO that, in their opinion, the financial
records of the entity have been properly maintained, that this report complies with the appropriate accounting standards
and gives a true and fair view of the cash flows of the entity, and that their opinion has been formed on the basis of a
sound system of risk management and internal control which is operating effectively.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 5
5
Share your feedback
Discover