Heavy Rare Earths and Li Potential Expanded at Lyons River
Released
Released
Announcement PDF
ASX ANNOUNCEMENT:
ASX: DAL 2 August 2023
Heavy Rare Earths and Lithium potential expanded at
Lyons River Project, Gascoyne Province
Lyons River Project Highlights
•
Two significant Rare Earth Element (REE) anomalies outlined at View Hill and 32 Mile Well
prospects in the Gascoyne region of Western Australia.
•
REE anomalism at View Hill with peak value of 1,043 ppm TREO (Total Rare Earth Oxides)
and strike length of 2.2km coincides with large thorium high.
•
REE anomalism at 32 Mile Well with a peak value of 2,025 ppm TREO has a strike length
of more than 3km.
•
REE anomalies lie adjacent to a major NE-trending structural feature, compatible with
relationships seen at Kingfisher Mining’s Mick Well REE discovery. Anomalies could
represent hard rock or clay hosted REE mineralisation.
•
A major shear zone/corridor active during the Edmundian Orogeny defined, with
potential for lithium bearing pegmatites supported by previously reported Li in soil
geochemical anomalies and anomalous rock chip values of 114 ppm Li, 1638 ppm Rb, 187
ppm Nb and 183 ppm Sn.
•
Analyses of granitic rocks demonstrates that intrusions of the Thirty Three Supersuite are
present, which confirms interpretation of Edmundian deformation, and underlines
prospectivity for lithium bearing pegmatites.
Dalaroo Metals Ltd (ASX: DAL, “Dalaroo” or “Company”) is pleased to announce excellent results from
its follow up systematic soil sampling relating to REE prospectivity at the View Hill area in the Lyons River
Project, Gascoyne region of Western Australia (Figures 1 and 5).
Dalaroo’s Lyons River Project comprises approximately 740km2 of the Durlacher Super Suite and Halfway
Gneiss, transected by major NW-trending shear zones including the Chalba Shear. This same stratigraphy
and comparable structural setting hosts significant REE deposits nearby to the north, at the Hastings
Technology Metals Yangibana and Dreadnought Resources Mangaroon projects, and to the south at
Kingfisher Mining’s Mick Well Project (Figure 1).
Dalaroo’s Managing Director, Harjinder Kehal, commented:
“We are delighted to have delineated two REE geochemical anomalies (combined strike of >5km) with
results for the heavy end of the rare earths spectrum, of up to 2,045 ppm Total Rare Earths Oxides (TREO)
from a follow-up sampling program on the eastern side of our Lyons River Project”.
Figure 1: Dalaroo Metals, Lyons River Project in the Gascoyne Province REE and lithium companies and prospects
Technical Commentary
Rare Earths
Two significant REE anomalies have been outlined at the View Hill and 32 Mile Well prospects. The REE
anomalism with a peak value of 1,043 ppm TREO at Zone 1 has a strike length of 2.2km, average width
of 500m and coincides with a large NW trending thorium high identified in detailed radiometric imagery
data flown by the Company. The second REE anomaly with a peak value of 2,025 ppm TREO has a current
strike length of over 3km and an average width of 300m (Table 1).
Figure 2: TREO results on radiometrics thorium/google image (note coincident large thorium and TREO anomaly
at View Hill prospect).
Importantly both REE anomalies lie adjacent to a major NE-trending structure, compatible with
relationships seen at Kingfisher Mining’s Mick Well REE discovery (Figures 1 and 2). The anomalies have
no recorded drilling and could, therefore, represent either potential hard rock or near surface clay
hosted mineralisation drill targets. A total 309 soil samples were collected over the greater View Hill and
32 Mile Well prospect areas as part of the follow up sampling program on lines 1km apart at 100m
intervals (Figure 2). First pass REE results at View Hill had returned values of up to 1043 ppm TREO
reported (ASX: DAL -See ASX: Announcement from 4 April 2023).
Lithium Potential
At Dalaroo’s Lyons River Project, a shear zone with a strike length of 30km has been identified from
detailed geological mapping undertaken by respected lithium expert and structural geologist, Dr Mike
Grigson. This shear zone was active during the Edmundian Orogeny (like the Ti Tree Shear Zone, hosting
Yinnetharra Lithium mineralisation) and importantly this shear zone shows strain with steep mineral
stretching lineations, and localised oblique foliation trends near cross-fault swarms in the central part
in the Four Corners area (Figures 2 and 3). The latter features are indicative of strong constrictional
strain, and in other rare-metal provinces (e.g., East Pilbara Terrane) such structures characterise the
immediate environs of major spodumene-bearing pegmatite deposits.
Figure 3: Lyons River Project – Major shear zone/corridor active during the Edmundian Orogeny, with potential for
lithium bearing pegmatites.
The Edmundian timing of shear-zone deformation is supported by presence of granite intrusions at
Lyons River that contain pegmatite segregations, and display REE enrichment patterns identical to the
distinctive patterns shown by the intrusions of the Thirty Three Supersuite in the Ti Tree Shear Zone
(flat, to weakly positive, chondrite-normalised profile from Gd to Lu; Figure 3 and Table 2). The presence
of such granite intrusions is not unexpected, given the large number of thick, muscovite-rich, granitic
pegmatite sheets at Lyons River. Importantly, many of the granitic pegmatite sheets at Lyons River are
highly deformed, which again is the hallmark of major rare-metal pegmatite provinces, where the
deformed sheets are considered the most likely source of melts that formed spodumene-bearing
deposits in shear zones.
Rock chip sampling completed to date of outcropping pegmatites at View Hill has confirmed whole rock
geochemistry considered highly fertile for LCT-type pegmatites (Figure 3). A pegmatite swarm that
outcrops in the newly identified shear zone and across a 9km x 6km area has returned anomalous rock
chip values of 114 ppm Li, 1638 ppm Rb, 187 ppm Nb and 183 ppm Sn. Rock chip sampling of pegmatites,
west of View Hill, has returned significant Ta and Nb values of 117 ppm and 328 ppm respectively with
anomalous Rb of 904 ppm (ASX: DAL - See ASX: Announcement from 1 December 2022). This is indicative
of highly fractionated LCT pegmatites and supports the interpretation that the shear zone/corridor is
fertile, with potential for higher grade lithium at depth.
Pegmatites in the adjacent Yinnetharra district form part of the intrusive Thirty Three Supersuite (“TTS”),
which comprises granite, granitic pegmatites (microcline-muscovite-tourmaline) and rare-metal
pegmatites. Field mapping by Dalaroo has confirmed that the granites and pegmatites of the TTS have
also intruded the host stratigraphy of the Lyons River Project tenements (Figure 3). Dalaroo’s lithium
anomalous rock chip results are located approximately 22km south-west of the Yinnetharra Lithium
Project, where Delta Lithium has significant intersections of 29m @ 1.5% Li2O and 36m @ 1.1% Li2O
(ASX: DLI -See ASX: Announcement from 4 July 2023).
Next Steps
REE Potential
Infill soil sampling over the View Hill and 32 Mile Well prospects which have strike lengths of 2.2km and
3km respectively will be completed on a 200m x 40m pattern. Rock chip sampling will be undertaken
over the REE anomalous zones. The results from the infill sampling is expected to delineate drill targets.
Lithium Potential
Rock chip sampling of the 30km strike length shear zone that was active during the Edmundian Orogeny
similar to Ti Tree Shear, hosting Yinnetharra Lithium has commenced to outline Li bearing pegmatites.
Results from this sampling program will lead to defining drill targets.
ENDS
For more Information:
Please visit our website for more information: www.dalaroometals.com.au
Harjinder Kehal, Managing Director on +61 400 044 890
Authorised for release to the ASX by the Board of Dalaroo Metals Ltd.
COMPETENT PERSON
The information in this report that relates to Exploration results is based on information compiled by
Dalaroo Metals Ltd and reviewed by Mr Harjinder Kehal who is the Managing Director of the Company
and is a Registered Practicing Geologist and Member of the AusIMM and AIG. Mr Kehal has sufficient
experience that is relevant to the style of mineralisation, the type of deposit under consideration and to
the activities undertaken to qualify as a Competent person as defined in the 2012 edition of the
“Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Kehal
consents to the inclusion in this report of the matters based on this information in the form and context
in which it appears.
FORWARD-LOOKING INFORMATION
This report may include forward-looking statements. Forward-looking statements include, but are not
limited to, statements concerning the planned exploration program and other statements that are not
historical facts. When used in this report, the words "could", "plan", "estimate", "expect", "intend",
"should" and similar expressions are forward-looking statements. Although Dalaroo believes that its
expectations reflected in these forward-looking statements are reasonable, such statements involve
risks and uncertainties and no assurance can be given that actual results will be consistent with these
forward-looking statements.
CAUTIONARY NOTE
The statements and information contained in this report are not investment or financial product advice
and are not intended to be used by persons in deciding to make an investment decision. In releasing this
report, Dalaroo has not considered the objectives, financial position or requirements of any particular
recipient. Accordingly, potential investors should obtain financial advice from a qualified financial
advisor prior to making an investment decision.
Table 1: Soil geochemical sample locations and anomalous results of REE analyses expressed as TREO greater
than 800 ppm.
North CeO2 Dy2O3 Er2O3 Eu2O3 Gd2O3 Ho2O3 La2O3
Sample ID
East
LRS5389
LRS5291
LRS5296
LRS5070
LRS5326
LRS5059
LRS5069
LRS5071
LRS5145
LRS5061
LRS5060
LRS5206
LRS5045
LRS5050
385950
387200
387200
389100
385950
389300
389100
389100
390200
389300
389300
389200
389200
389200
7271800 927.4
7272100 841.5
7271600 551.6
7275800 450.8
7278100 433.6
7275750 420.1
7275750 425.0
7275850 423.8
7275500 412.7
7275850 409.1
7275800 383.3
7271100 372.2
7275750 361.1
7275950 363.6
20.7
20.0
14.2
10.8
12.7
12.1
11.8
10.4
11.2
10.0
10.7
9.3
10.0
10.4
5.3
6.3
5.1
3.5
3.0
7.4
5.0
4.1
4.1
4.2
5.0
3.1
4.7
4.2
2.1
4.1
2.8
1.6
3.4
2.8
1.8
2.5
2.3
2.4
2.4
2.1
2.5
2.3
45.0
41.0
23.5
17.1
23.1
17.1
16.8
15.9
16.1
15.0
14.8
16.8
15.7
15.9
2.5
2.7
2.1
1.6
1.6
2.1
1.8
1.6
1.8
1.7
1.9
1.6
1.6
1.6
Lu2O3 Nd2O3 Pr6O11
418.7
375.3
247.5
213.4
186.5
194.7
193.5
191.2
188.8
185.3
175.9
165.4
170.1
164.2
0.6
0.8
0.5
0.3
0.3
0.6
0.5
0.4
0.4
0.4
0.5
0.3
0.5
0.5
340.6
312.6
192.5
137.6
158.6
141.1
136.5
140.0
137.6
131.8
124.8
128.3
122.5
123.6
Yb2O3 TREO
Sm2O3 Tb4O7 Tm2O3 Y2O3
103.5
93.2
58.6
44.9
46.9
44.6
43.3
43.6
43.4
41.3
39.0
39.3
38.4
38.3
72.6
59.0
33.3
23.8
30.0
24.6
23.8
23.0
22.5
21.3
20.6
22.3
20.2
21.9
5.3
4.8
3.0
2.2
2.9
2.3
2.3
2.0
2.1
2.0
2.0
2.0
1.9
2.1
0.6
0.7
0.6
0.4
0.7
0.7
0.5
0.5
0.5
0.5
0.6
0.3
0.5
0.7
76.6
76.8
64.4
44.2
45.0
64.4
52.4
47.6
48.1
47.1
55.7
39.2
47.4
47.2
3.7
5.0
3.3
2.2
1.4
4.6
3.1
2.6
2.8
3.1
3.8
2.0
3.2
3.1
2025
1843
1202
954
950
939
918
909
894
875
841
804
800
800
Table 2: Results of REE analyses of granitic rocks in the Edmundian Orogeny shear zone (elements/fields
arranged by atomic weight).
Sample ID
23LRR009
23LRR010
23LRR011
23LRR012
East
376666
377777
378423
381039
North Lithology
7283297 Monzogranite
7282794 Leucogranite
7282705 Leucogranite
7280875 Monzogranite
Classification
Thirty Three Supersuite
Durlacher Supersuite
Durlacher Supersuite
ThirtyThree Supersuite
La
34.6
79
136
9.4
Ce
97.3
175
267
11.7
Pr
7.35
18.5
24.1
1.4
Nd
25.4
69.1
88.6
5.05
Sm
4.25
12.3
13.3
0.85
Eu
0.45
1.95
1.35
0.65
Gd
3.2
8.6
9.8
0.8
Tb
0.52
1.04
1.24
0.1
Dy
3.55
4.95
6.35
0.7
Ho
0.74
0.64
0.98
0.16
Er
Tm
2.7 0.45
1.4 0.15
2.5 0.25
0.55
0.1
Yb
3.2
0.95
1.65
0.6
Lu
0.48
0.1
0.2
0.08
About the Lyons River Project
ASX: DAL
--- September 2022
Lyons River is located approximately 1,100km north of Perth and approximately 220km to the northeast of the coastal town of Carnarvon, Western Australia. The Lyons River Project lies within the
Mutherbukin Zone of the Gascoyne Province, which is the deformed and high-grade metamorphic core
zone of the early Proterozioc Capricorn Orogen (Figure 4).
Figure 4: Lyons River Project location diagram
Appendix 1: Dalaroo Metals Ltd – Lyons River Project – JORC Code Edition 2012: Table 1
Section 1: Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections)
Criteria
JORC Code explanation
Commentary
Sampling
techniques
Nature and quality of sampling (e.g. cut
channels, random chips, or specific specialised
industry
standard
measurement
tools
appropriate to the minerals under investigation,
such as down hole gamma sondes, or handheld
x-ray fluorescence (XRF) instruments, etc). These
examples should not be taken as limiting the
broad meaning of sampling.
Soil and rock chip sampling.
Soil samples are generally homogenised by the
collection process. Entire sample was submitted
for sample prep and assay.
Rock chip samples were taken as individual rocks
representing an outcrop to give an indication of
their mineral and elemental composition.
Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or systems
used.
For soil sampling, at the selected sample site, a
Aspects of the determination of mineralisation small hole is dug to a depth of approximately 20
cm. The soil material at the base of the hole was
that are Material to the Public Report.
sieved, and approximately 2kg of –2mm soil
material was collected into a numbered calico
bag.
In cases where ‘industry standard’ work has
Rock chip sampling completed across a lithology,
been done this would be relatively simple (e.g.
in a channel fashion, to obtain representative
‘reverse circulation drilling was used to obtain 1
material, with sample size of 1-4 kg.
m samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other
cases, more explanation may be required, such
as where there is coarse gold that has inherent Soil and rock chip sampling results are a first pass
sampling problems. Unusual commodities or exploration technique that can assist in vectoring
mineralisation types (e.g. submarine nodules) toward mineralisation.
may warrant disclosure of detailed information.
Drilling
techniques
Drill type (e.g. core, reverse circulation, open- No drilling results reported.
hole hammer, rotary air blast, auger, Bangka,
sonic, etc.) and details (e.g. core diameter, triple
or standard tube, depth of diamond tails, facesampling bit or other type, whether core is
oriented and if so, by what method, etc.).
Criteria
JORC Code explanation
Commentary
Drill sample
recovery
Method of recording and assessing core and chip No drilling results reported.
sample recoveries and results assessed.
Measures taken to maximise sample recovery No drilling results reported.
and ensure representative nature of the
samples.
Whether a relationship exists between sample
recovery and grade and whether sample bias No drilling results reported.
may have occurred due to preferential loss/gain
of fine/coarse material.
Logging
Whether core and chip samples have been Sample type and landform/regolith settings were
geologically and geotechnically logged to a level recorded, and geo-tagged photos of samples and
of detail to support appropriate Mineral settings taken.
Resource estimation, mining studies and
metallurgical studies.
Whether logging is qualitative or quantitative in
No drilling results reported.
nature. Core (or costean, channel, etc.)
photography.
The total length and percentage of the relevant
intersections logged.
Subsampling
techniques and
sample
preparation
If core, whether cut or sawn and whether Soil samples were sieved to collect the -2 mm
fraction.
quarter, half or all core taken.
If non-core, whether riffled, tube sampled, Representative rock samples were collected.
rotary split, etc and whether sampled wet or dry. All samples were dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
Sample preparation of samples follows industry
best practice standards and is conducted by
internationally recognized laboratories; i.e
Oven drying, jaw crushing and pulverising so that
Quality control procedures adopted for all 90% passes -75 microns.
subsampling stages to maximise representivity
of samples.
There was no sub-sampling.
Measures taken to ensure that the sampling is
representative of the in-situ material collected,
including for instance results for field Soil sampling completed on a regular grid line
duplicate/second-half sampling.
spacings to ensure representative sampling of
Whether sample sizes are appropriate to the area being assessed.
grain size of the material being sampled.
Entire rock sample was submitted for multielement assay and sample size is considered
appropriate for the material being sampled.
Entire soil sample submitted for assay and
sample size is considered appropriate for the
material being sampled.
Criteria
JORC Code explanation
Commentary
Quality of assay The nature, quality and appropriateness of the Soil and rock samples have been submitted to
data and
assaying and laboratory procedures used and Bureau Veritas Laboratories for analysis by 4laboratory tests whether the technique is considered partial or Acid Digest - 0.2g
total.
For geophysical tools, spectrometers, handheld Samples analysis and determined by Inductively
XRF instruments, etc, the parameters used in Coupled Plasma (ICP) Optical Emission
determining the analysis including instrument Spectrometry and Inductively Coupled Plasma
make and model, reading times, calibrations (ICP) Mass Spectrometry.
factors applied and their derivation, etc.
Nature of quality control procedures adopted
(e.g. standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (i.e. lack of bias) and precision
have been established.
Verification of
sampling and
assaying
The verification of significant intersections by Anomalous geochemical thresholds were
either independent or alternative company determined by a senior geologist and consultant.
personnel.
The use of twinned holes.
None drilled.
Documentation of primary data, data entry
procedures, data verification, data storage All field data was manually collected, entered
(physical and electronic) protocols.
into excel spreadsheets, validated and loaded
Discuss any adjustment to assay data.
into Access database and processed by a number
of different exploration software.
None required
Location of
data points
Accuracy and quality of surveys used to locate All samples collected are located using a
drillholes (collar and downhole surveys), handheld GPS.
trenches, mine workings and other locations
used in Mineral Resource estimation.
Grid system used for geochemical sampling is
Specification of the grid system used.
GDA94 Zone 50
Quality and adequacy of topographic control.
For geochemical sampling nominal RLs based on
regional topographic data sets and handheld
GPS.
Data spacing
Data spacing for reporting of Exploration Soil sampling on 1000m and 500m X 100m
and distribution Results.
spacing based on geology/structural framework.
Whether the data spacing and distribution is Rock samples collected within a defined regional
sufficient to establish the degree of geological structural corridor.
and grade continuity appropriate for the
Mineral Resource and Ore Reserve estimation
MRE not being reported.
procedure(s) and classifications applied.
Whether sample compositing has been applied.
Criteria
JORC Code explanation
Commentary
Orientation of
data in relation
to geological
structure
Whether the orientation of sampling achieves
unbiased sampling of possible structures and the
extent to which this is known, considering the
deposit type.
Soil sample lines were orientated approximately
perpendicular to the geological strike and strike
of the interpreted major structures. Given the
topography and early stage of exploration, the
sampling orientation is not considered to
introduce a bias to the interpretation of the data.
Rock chip sampling was of a reconnaissance nature
only and was not designed to achieve unbiased
sampling.
If the relationship between the drilling No drilling results reported.
orientation and the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.
Sample security The measures taken to ensure sample security.
Audits or
reviews
Samples were collected into labelled polyweave
sacks which were sealed by cable ties. The
polyweave sacks were placed in bulka-bags and
transported to the laboratory by freight
company. Once the samples arrived at the
laboratory, the samples numbers were checked
against the sample submission form and no
errors were identified.
The results of any audits or reviews of sampling As part of the interpretation of the data the
techniques and data.
Company’s geologist and consultants undertook
a review of the assay data quality, including
laboratory batch effects. No significant biases
were identified.
Section 2: Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section)
Criteria
JORC Code explanation
Commentary
Mineral
tenement and
land tenure
status
Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national
park and environmental settings.
The Lyons River Project tenements are wholly
owned by Dalaroo Metals Limited (“Dalaroo”)
The Project is located 220km north-east of
Carnarvon on Eudamullah, Lyons River and
Bidgemia Pastoral stations.
The security of the tenure held at the time of
The Competent Person is unaware of any
reporting along with any known impediments to
impediments to development of these
obtaining a licence to operate in the area.
tenements.
Criteria
JORC Code explanation
Commentary
Exploration
done by other
parties
Acknowledgment and appraisal of exploration by Exploration of Lyons River has previously been
other parties.
undertaken by other parties including Audalia
Resources and Serena Minerals and the
Competent Person has referenced the parties
involved and the results of this work throughout
the text.
Audalia Resources and Serena Minerals
undertook exploration with a focus on base
metals during the period 2013 to 2021. Work
completed regional geological mapping,
geophysical surveys, rock chip sampling, stream
sediment sampling and soil sampling.
Geology
Deposit type, geological setting, and style of The tenements are located in the Mutherbukin
mineralisation.
zone of the Gascoyne Province. The majority of
the tenement area is interpreted to be
dominated by a sequence undifferentiated
schists, gneiss and granites of the Durlacher Suite
(Davey Well Granite) and Thirty Three Supersuite
granitic pegmatites
Drillhole
information
A summary of all information material to the No drillholes are reported.
understanding of the exploration results
including a tabulation of the following
information for all Material drillholes:
• easting and northing of the drillhole collar
• elevation or RL (Reduced Level – elevation
above sea level in metres) of the drillhole
collar
• dip and azimuth of the hole
• down hole length and interception depth
• hole length.
If the exclusion of this information is justified on
The plan provided in the body of the report
the basis that the information is not Material and
identifies the location of the geochemical
this exclusion does not detract from the
sampling sites.
understanding of the report, the Competent
Person should clearly explain why this is the case.
Criteria
JORC Code explanation
Data
aggregation
methods
In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of high
grades) and cut-off grades are usually Material
and should be stated.
Commentary
Where aggregate intercepts incorporate short
lengths of high-grade results and longer lengths
of low-grade results, the procedure used for such
aggregation should be stated and some typical
examples of such aggregations should be shown
in detail.
The assumptions used for any reporting of metal
equivalent values should be clearly stated.
Relationship
between
mineralisation
widths and
intercept
lengths
These relationships are particularly important in No mineralisation widths have been reported.
the reporting of Exploration Results.
Diagrams
Appropriate maps and sections (with scales) and Appropriate maps displaying all the data points
tabulations of intercepts should be included for and anomalous values are provided in the body
any significant discovery being reported These of the report.
should include, but not be limited to a plan view
of drillhole collar locations and appropriate
sectional views.
Balanced
reporting
Where comprehensive reporting of all The reporting of exploration results is
Exploration Results is not practicable, considered balanced by the competent person.
representative reporting of both low and high
grades and/or widths should be practiced to
avoid misleading reporting of Exploration
Results.
Other
substantive
exploration
data
Other exploration data, if meaningful and No other exploration to report.
material, should be reported including (but not
limited to): geological observations; geophysical
survey results; geochemical survey results; bulk
samples – size and method of treatment;
metallurgical test results; bulk density,
groundwater,
geotechnical
and
rock
characteristics;
potential
deleterious
or
contaminating substances.
If the geometry of the mineralisation with respect
to the drillhole angle is known, its nature should
be reported.
If it is not known and only the downhole lengths
are reported, there should be a clear statement
to this effect (e.g. ‘downhole length, true width
not known’).
Criteria
JORC Code explanation
Further work
The nature and scale of planned further work Appropriate plans for further work are provided
(e.g. tests for lateral extensions or depth in the body of the report.
extensions or large-scale step-out drilling).
Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future drilling
areas, provided this information is not
commercially sensitive.
Commentary
Share your feedback
Discover