Dalaroo prepares maiden work program for Blue Lagoon
Zirconium, Niobium and Rare Earth Project in Greenland
________________________________________________________________________________
Highlights
•
Dalaroo has advanced planning for upcoming maiden field season at the Blue Lagoon ZrNb-REE project, Greenland. Field work will be conducted towards the end of June 2025.
•
A program of auger drilling, stream sediment and soil sampling and reconnaissance
mapping and sampling has been designed to follow up on historical highly anomalous
values returned in a regional stream sediment program undertaken by the Greenland and
Denmark Geological Society (‘GEUS”) for uranium in 1979 (refer to ASX release 20th Feb,
2025).
•
No follow-up work on these results has ever been reported on the tenement.
•
Dalaroo has secured the services of highly respected and experienced Greenland
geologist Ole Christiansen, who has been instrumental in the modern development of
metals in Greenland, including Critical Metal’s (NASDAQ: CRML Critical Metals Corp)
Tanbreez project.
•
The Blue Lagoon Project has similar geochemical anomalous footprint to the Kvanefjeld
(ASX: ETM Energy Transition Metals) and Kringlerne/Tanbreez multi-element deposits in
South Greenland, showing enrichment in critical minerals and high value LREE elements
from regional stream sediment sampling. These projects are all hosted within the southwest north-east trending Gadar alkaline intrusive province where Blue Lagoon Is also
located.
•
US administration has continued to show considerable interest in Greenland, highlighting
the importance Greenland has for critical metals and their ownership.
•
Auger drilling to sample alluvial and colluvial material will form a key part of the program.
In situ weathering of the alkaline granite might provide bulk tonnage options from beachlike deposits, providing potential low-cost options for mining and separation.
Characterising these deposits geochemically is the first step of the evaluation of this
potential.
________________________________________________________________________________
Dalaroo Metals Ltd (ASX: DAL, “Dalaroo” or “Company”) is pleased to provide an update on planned
activities at the Blue Lagoon Project in Greenland.
Dalaroo Metals MD & CEO, Mike Brown commented “We are excited to have advanced a maiden field
program at Blue Lagoon, and also secured the services of renowned Greenland geologist Ole Chistiansen.
Auger drilling of weathered granite areas will be a key objective of the program. Stream, soil and rock chip
sampling and prospecting over the tenement will complete the program. This should provide the first
insight into the potential of the project to host heavy mineral sands type deposits of strategic metals and
REEs. Placer deposits have obvious benefits on the cost of mining. With the Project being located on the
coast with ice free water we are looking forward to getting onto the ground to commence exploration
activities in June and report results when in hand.”
Figure 1: Project location, GEUS regional stream sediment location and neodymium assay results
The large and highly anomalous zirconium, niobium and REE geochemical anomalies over the Project area
provides a compelling multi-commodity exploration target. The Vendor has identified the presence of
potential bulk tonnage ‘placer’ type deposits from in-situ weathered granite. This is characterised by
highly anomalous LREE and Nb signature, which is very similar to the geochemical signature that coincides
with 3 other significant REE deposits in South Greenland associated with Gadar Block alkaline intrusives.
The Company is looking forward to reporting the results of the work program as they come to hand.
HISTORICAL EXPLORATION RESULTS
A GEUS regional stream sediment sampling program took a total of 9 stream sediment samples from the
current tenement area in 1979. These indicate the area as being anomalous in zirconium, niobium and
REEs, particularly the magnetic rare earth neodymium (see Figure 1). Significantly the samples returned
background to very low-level uranium and thorium content, which is critical for shipping and permitting.
There is no record of any exploration having been undertaken on the tenement area to follow-up the
anomalous results.
Table 1: Selected assay results from all GEUS stream sediment sampling within MEL 2022-07. Source
(https://eng.geus.dk)
REE
LREE
HREE
La
(ppm)
Ce
(ppm)
Nd
(ppm)
Sm
(ppm)
Eu
(ppm)
Tb
(ppm)
Yb
(ppm)
Lu
(ppm)
Th
(ppm)
U
(ppm)
Nb
(ppm)
Zr
(ppm)
281028
270
410
200
35
2.8
4.7
14
1.3
21
5.6
129
2059
281030
600
870
360
65
4.7
11
39
5
51
18
294
1063
281031
590
990
410
65
4.2
11
31
3
61
14
279
5054
281032
220
290
160
28
2.7
4.4
18
2.4
22
7.1
193
3773
282850
710
1300
520
79
12
12
60
5.2
88
14
326
9360
282851
550
870
390
66
5
9.7
39
4.2
45
11
13
246
118
3520
Sample_ID
282852
282853
780
1800
500
80
5.9
11
44
4.7
64
10
126
3286
282854
660
1400
500
75
9.9
11
49
5.3
73
18
200
7240
WORK PROGRAM
Dalaroo is pleased to announce it has engaged the services of renowned Greenland geologist Ole
Christiansen for exploration work on the project. Mr Christiansen has over 35 year’s experience exploring
Greenland, and is currently a consulting geologist, which has included work for the Tanbreez deposit. He
has spent considerable time exploring for gold, base metals as well as critical metals within alkalic
complexes, including carbonatite and syenite complexes. He was the former CEO of Nuna Minerals A/S, a
crowned company that became listed on Nasdaq OMX Copenhagen in 2008.
Two principal work streams will be conducted. The first will involve auger drilling of beach like deposits
around the Blue Lake shore and surrounds. This will be undertaken to test their potential to host
weathered finer grained heavy mineral sands/fractions, where elements such as niobium, zirconium and
REEs would be expected to be concentrated by weathering. The second will consist of a program of
detailed geochemical sampling (stream, soils and rocks) and prospecting over the whole tenement area.
Results from the sampling will be used to vector a follow-up field program. Subject to these results being
positive and received in a timely manner it may be possible to complete a second field trip, with field
season typically open until the end of September 2025.
GEOLOGICAL SETTING
The Paleoproterozoic Province in South Greenland is a cratonic rift province consisting of sandstones, and
a variety of alkaline volcanic and plutonic igneous rocks. The Mesoproterozoic Gadar alkaline intrusive
complexes intruded into this rift setting. The MEL 2022-07 exploration licence lies within the Helene
granite unit, which forms the westernmost exposure of the large Nunarsuit Complex. The Nunarsuit
Complex is the largest and amongst the youngest of numerous Gardar age intrusions in South Greenland.
It is comprised of alkaline syenite and granitic units (see Figure 2). The Project lies within the mapped
Helene alkaline granite, which forms the westernmost unit of the Nunarsuit Complex. It is bounded to the
east by an extensive alkalic syenite.
Figure 2: SW Greenland Geology and mineral deposits and occurrences. Blue Lagoon association with Gadar Block
alkaline intrusives with a similar setting to other major multi-metallic deposits. Modified from Steenfelt et al 2016
NEXT STEPS AND INDICATIVE NEWSFLOW
Assay results from the sampling program are expected to be received from mid-August 2025 onwards. It
is anticipated that if these results are favourable, a follow-up field trip would be conducted prior to the
end of September 2025. A portable XRF will assist the teams to identify any anomalous or mineralised
areas, which should expedite the planning for follow-up work prior to receipt of assays.
The exploration season in this part of Greenland is more extensive than most of Greenland, running from
May to September each year.
Figure 3: Colluvial and alluvial weathering accumulations from granitic country rock surrounding Blue Lake.
Source: Vendor
Figure 4: Coarse crystal rich 'beach' at Blue Lake. Source: Vendor.
ENDS
Authorised for release to the ASX by the Board of Dalaroo Metals Ltd.
For more Information:
Please visit our website for more information: www.dalaroometals.com.au
Michael Brown, Managing Director on +61 8 6185 2004
CAUTIONARY STATEMENT:
•
•
•
The historical results included in this announcement are being reported in accordance with the
JORC Code 2012 for the first time;
Whilst a Competent Person has not done sufficient work to verify the results through additional
sampling, nothing has come to the attention of the Company that has caused it to question the
accuracy or reliability of the GEUS’s previous historical results. Verification via stream, soil, rock
chip and auger drilling will be undertaken during the work program the Company is planning to
undertake this season.
A review of the sampling procedures has led the CP to consider these results are credible and
reliable, having been extensively verified by a GEUS led review in 1999, and there is nothing that
would indicate these results should not be relied upon. Given they are regional stream sediments,
which by nature are standard industry practice for first pass reconnaissance to identify potential
areas of interest, and there is sufficient information to disclose these historical results in
accordance with the JORC Code 2012, they have been included (see Appendix Tables 1A-3A).
COMPETENT PERSON
The information in this release that relate to the historical results on the Project is based on information
compiled by Dalaroo Metals Ltd and reviewed by Mr Michael Brown who is a Geologist and Member of
the AIG. Mr Brown has sufficient experience that is relevant to the style of mineralisation, the type of
deposit under consideration and to the activities undertaken to qualify as a Competent person as defined
in the 2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves”. Mr Brown consents to the inclusion in this report of the matters based on this information
in the form and context in which it appears.
Where reference is made to previous releases of exploration results in this announcement, the Company
confirms that it is not aware of any new information or data that materially affects the information
included in those announcements and all material assumptions and technical parameters underpinning
the exploration results included in those announcements continue to apply and have not materially
changed.
FORWARD-LOOKING INFORMATION
This release may include forward-looking statements. Forward-looking statements include, but are not
limited to, statements concerning the planned exploration program and other statements that are not
historical facts. When used in this report, the words "could", "plan", "estimate", "expect", "intend",
"should" and similar expressions are forward-looking statements. Although Dalaroo believes that its
expectations reflected in these forward-looking statements are reasonable, such statements involve risks
and uncertainties and no assurance can be given that actual results will be consistent with these forwardlooking statements.
CAUTIONARY NOTE
The statements and information contained in this release are not investment or financial product advice
and are not intended to be used by persons in deciding to make an investment decision. In releasing this
report, Dalaroo has not considered the objectives, financial position or requirements of any particular
recipient. Accordingly, potential investors should obtain financial advice from a qualified financial advisor
prior to making an investment decision.
Appendix
Table 1A: Stream Sediment Sampling locations (WGS84 / UTM Zone 22N)
Sample_ID
281028
281030
281031
281032
282850
282851
282852
282853
282854
Easting
652519
651619
651716
653211
651372
652040
651912
651072
652192
Northing
6742530
6742267
6741981
6742385
6744257
6745797
6745462
6746316
6746743
Table 2A: Tenement Details
Lic code
Owner name
Applic date
Applic code
Grant_date
MEL 202207
Ox Resources Pty
Ltd Greenland
2021-12-16
M-MLSA325
2022-05-20
Lic_type
Mineral
Exploration
Licence
(MEL)
Expiry
date
Lic status
Lic type
id
2027-0519
Active License
268
Table 3A: JORC Code, 2012 Edition – Table 1 and 2- Exploration results
Table 1 Sampling Techniques and Data
Criteria
JORC Code explanation
Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or handheld
XRF instruments, etc). These examples
should not be taken as limiting the
broad meaning of sampling.
• Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any
measurement tools or systems used.
• Aspects of the determination of
mineralisation that are Material to the
Public Report.
• In cases where ‘industry standard’ work
has been done this would be relatively
simple (eg ‘reverse circulation drilling
Stream Samples
• All stream sediment samples collected
in the reconnaissance geochemical
mapping programme were treated in
the same way. They were collected in
paper bags, which were dried in the
field, wrapped in newspaper, packed in
boxes, and subsequently shipped to
GGU in Copenhagen.
• Figure 1 shows the locations of
samples, which are considered to be
sufficient for regional geochemical
surveying.
was used to obtain 1 m samples from
which 3 kg was pulverised to produce a
30 g charge for fire assay’). In other
cases more explanation may be
required, such as where there is coarse
gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (eg submarine
nodules) may warrant disclosure of
detailed information.
Drilling
techniques
• Drill type (eg core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details
(eg core diameter, triple or standard
tube, depth of diamond tails, facesampling bit or other type, whether
core is oriented and if so, by what
method, etc).
Drill sample • Method of recording and assessing core
recovery
and chip sample recoveries and results
assessed.
• Measures taken to maximise sample
recovery and ensure representative
nature of the samples.
• Whether a relationship exists between
sample recovery and grade and
whether sample bias may have
occurred due to preferential loss/gain
of fine/coarse material.
Logging
• Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource
estimation, mining studies and
metallurgical studies.
• Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
• The total length and percentage of the
relevant intersections logged.
Sub• If core, whether cut or sawn and
sampling
whether quarter, half or all core taken.
techniques • If non-core, whether riffled, tube
and sample
sampled, rotary split, etc and whether
preparation
sampled wet or dry.
• For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
• NA
• NA
• NA
• Samples were prepared at the GGU
secured facility in Copenhagen. The
samples were dried at 60C and sieved
into three grain size fractions. The < 0.1
mm fraction has been used for analysis,
the fraction from 0.1 to 1 mm has been
retained in storage, while the fraction
above 1 mm has been discarded.
Quality of
assay data
and
laboratory
tests
• Quality control procedures adopted for
all sub-sampling stages to maximise
representivity of samples.
• Measures taken to ensure that the
sampling is representative of the in situ
material collected, including for
instance results for field
duplicate/second-half sampling.
• Whether sample sizes are appropriate
to the grain size of the material being
sampled.
• The nature, quality and appropriateness
of the assaying and laboratory
procedures used and whether the
technique is considered partial or total.
• For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations
factors applied and their derivation, etc.
• Nature of quality control procedures
adopted (eg standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (ie lack of bias) and precision
have been established.
• No duplicates were taken from sample
location.
• Samples were assayed via Instrumental
Neutron Activation Analysis (Act INA) at
Activation Laboratories Ltd. (Act),
Ancaster, Ontario, Canada.
• Zirconium and niobium were assayed
for Radio-isotope excited energydispersive X-ray Fluorescence
Spectrometry using a cadmium (XCD)
methodology at the Risø National
Laboratory, Roskilde, Denmark.
o The sieved sample fractions (<0.15
or <0.1 mm) were poured directly
into the sample containers
consisting of an aluminium ring
with a bottom of thin mylar foil.
The sample container would
typically contain 20-30 g material,
although only the layer close to the
mylar foil (area ca. 38 cm2) would
be exposed to the X-rays. The
results may have been affected by
bias introduced during the filling of
samples into the containers
because the heavy minerals tend
to be concentrated in the bottom
layer (closest to the detector). The
analyses were monitored by
internal lab standards and
repeated analysis showed that
results were fairly reproducible.
• Both laboratories used internal
standards for calibrations. A
subsequent validation in 1999 of the
entire stream sediment database taken
by GEUS reviewed all laboratory results
and considered them within acceptable
levels (Compilation of data sets for a
geochemical atlas of West and South
Greenland based on stream sediment
surveys 1977 to 1997.” GEUS, 1997-41.
Agnette Steenfelt).
Verification
of sampling
and
assaying
Location of
data points
Data
spacing
and
distribution
Orientation
of data in
relation to
geological
structure
Sample
security
• The verification of significant
intersections by either independent or
alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data
entry procedures, data verification,
data storage (physical and electronic)
protocols.
• Discuss any adjustment to assay data.
• Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral
Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic
control.
• Data spacing for reporting of
Exploration Results.
• Whether the data spacing and
distribution is sufficient to establish the
degree of geological and grade
continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s) and classifications applied.
• Whether sample compositing has been
applied.
• No verification has been undertaken by
the CP since that undertaken by GEUS
in 1999.
• Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this
is known, considering the deposit type.
• If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material.
• The measures taken to ensure sample
security.
• Streams sampling is based on streams
being present and trying to get a
representative picture of surrounding
landform- there is no sampling density
applied.
• Field locations were plotted on aerial
photos and subsequently digitized- as
such they are not considered accurate,
but are appropriate given they are from
a regional stream sediment program.
• WGS 84/UTM Zone 22N
• Assay data underwent extensive review
in the 1999 compilation to ensure
internal consistency between all
reported data given regional samples
were taken over a period of 20 years
and assayed between 1991-1997 at
different laboratories and using
different techniques.
• All samples reported were collected in
the same field program in 1979, and
are thus considered consistent and
reliable.
• Samples were flown and kept in a
secured facility in Copenhagen.
Complete sample security protocols
with respect to delivery to the
laboratories is unknown.
Audits or
reviews
• The results of any audits or reviews of
sampling techniques and data.
• Note reference to large study to review
and compile all stream sediments for
the GUES national database.
Table 2 Reporting of Exploration Results
Criteria
JORC Code explanation
Commentary
Mineral
tenement and
land tenure
status
• Type, reference name/number,
location and ownership including
agreements or material issues with
third parties such as joint ventures,
partnerships, overriding royalties,
native title interests, historical sites,
wilderness or national park and
environmental settings.
• The security of the tenure held at the
time of reporting along with any
known impediments to obtaining a
licence to operate in the area.
• The project consists of one Mineral
Exploration, MEL 2022-07, licence ID#
268..
• It was granted to Ox Resources Pty Ltd
Greenland on 20/05/2022 and expires
on 19/5/2027. MELs can be renewed
by an additional 5 years.
• Dalaroo entered into a Binding Heads
of Agreement with Ox Resources Pty
Ltd on Feb 19th 2025. Subject to
meeting certain payments and
meeting work commitments:
HEADS OF AGREEMENT TERMS
The key terms of the Agreement are as
follows:
• An exclusive Option to acquire a 100%
legal and beneficial interest in the
Project (“Option”);
• In consideration for the Option,
Dalaroo agrees to pay the Vendor an
Option fee of A$50,000;
• The Option is exercisable by Dalaroo
at any time prior to the Option
expiring on 31 December 2025;
• If Dalaroo exercises its Option
(“Completion”) on or before 31
December 2025 then it agrees to pay
the Vendor:
o A$150,000 in cash;
o Reimbursement of exploration
expenditure incurred by the
Vendor in the two years prior to
the execution date of the
Agreement, up to a maximum of
$150,000, in either cash or shares
in Dalaroo, at the election of
Dalaroo. If paid in shares the
shares will be valued on the 5-day
VWAP of Dalaroo prior to the
date of issue, subject to obtaining
shareholder approval for the
issue of the shares.
o The Vendor will, subject to
shareholder approval, be entitled
to the following shares on the
achievement of the relevant
milestones below:
A$125,000 of shares subject
to Dalaroo announcing a
Ground Penetrating Radar
Program determining the
volume of loose material or
the first drilling program on
the Project within 24 months
from Completion;
A$150,000 of shares subject
to Dalaroo announcing a
Maiden Mineral Resource
Estimate on the Project within
24 months form Completion,
at a deemed issue price equal
to the lower of the 5-day
VWAP prior to the date of
issue or A$0.05 per share; and
A$175,000 of shares subject
to Dalaroo releasing a Maiden
Scoping Study on the Project
within 24 months from
Completion, at a deemed
issue price equal to the lower
of the 5-day VWAP prior to the
date of issue or $0.10 per
share,(together,
the
“Milestone Shares”).
• The ‘Conditions Precedent’ include
Dalaroo:
o undertaking
exploration
expenditure of not less than
A$150,000 on the Project;
o Completing legal and technical
due diligence on the Project to
the satisfaction of Dalaroo;
o obtaining all regulatory approvals
or waivers pursuant to the ASX
Listing Rules, Corporations Act or
any other applicable law to the
allow the transaction to occur;
o obtaining a waiver from ASX
Listing Rule 7.3.4 to permit the
issue of the Milestone Shares
outside the 3-month period for
the date that shareholder
approval is obtained;
o obtaining shareholder approval
for the purposes of ASX Listing
Rule7.1 for the issue of the
Milestone Shares; and
o obtaining
all
third-party
approvals
and
consents
necessary to complete the
transaction.
• Post Completion the title and risk in
the Project will pass to Dalaroo and it
is obligated to spend A$500,000 on
exploration expenditure on the
Project within the first 12 months,
inclusive of the Option Expenditure
Commitment previously expended by
the Purchaser, and a further
A$500,000 in the second 12 months
after that.
• The Vendor, nor its associated parties,
are permitted to apply for any new
tenements with 5 kilometres of the
Project during the period of the
Agreement.
Exploration
done by other
parties
• Acknowledgment and appraisal of
exploration by other parties.
• There has been no reported
exploration undertaken other than a
site visit to Blue Lake area by the
owners.
• GEUS staff sampled the area in 1979
as part of a regional stream sediment
program for uranium. These samples
and results are reported above. The
results are publicly available on the
GEUS web portal (https://eng.geus.dk)
Geology
• Deposit type, geological setting and
style of mineralisation.
The project area has been mapped on
GEUS regional 1:100,000. MEL 2022-07
lies within the westernmost exposure of
the large Nunarsuit Complex, which is
part of the Mesoproterozoic Gadar
alkaline intrusive complexes. These
intruded into this rift setting. The
Nunarsuit Complex is the largest and
amongst the youngest of numerous
Gardar age intrusions in South
Greenland. It is comprised of alkaline
Drill hole
Information
Data
aggregation
methods
syenite and granitic units (see Figure 2).
The Project lies within the mapped
Helene alkaline granite, which forms the
westernmost unit of the Nunarsuit
Complex. It is bounded to the east by an
extensive alkalic syenite.
Based on the stream geochemistry
alkaline intrusive/pegamatite hosted REE
and other metals deposit type is
supposed.
• NA
• A summary of all information material
to the understanding of the
exploration results including a
tabulation of the following
information for all Material drill holes:
o easting and northing of the drill
hole collar
o elevation or RL (Reduced Level –
elevation above sea level in metres)
of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception
depth
o hole length.
• If the exclusion of this information is
justified on the basis that the
information is not Material and this
exclusion does not detract from the
understanding of the report, the
Competent Person should clearly
explain why this is the case.
• In reporting Exploration Results,
• NA- no drilling
weighting averaging techniques,
maximum and/or minimum grade
truncations (eg cutting of high grades)
and cut-off grades are usually
Material and should be stated.
• Where aggregate intercepts
incorporate short lengths of high
grade results and longer lengths of
low grade results, the procedure used
for such aggregation should be stated
and some typical examples of such
aggregations should be shown in
detail.
• The assumptions used for any
reporting of metal equivalent values
should be clearly stated.
Relationship
• These relationships are particularly
between
important in the reporting of
mineralisation
Exploration Results.
widths and
• If the geometry of the mineralisation
intercept
with respect to the drill hole angle is
lengths
known, its nature should be reported.
• If it is not known and only the down
hole lengths are reported, there
should be a clear statement to this
effect (eg ‘down hole length, true
width not known’).
Diagrams
• Appropriate maps and sections (with
scales) and tabulations of intercepts
should be included for any significant
discovery being reported These should
include, but not be limited to a plan
view of drill hole collar locations and
appropriate sectional views.
Balanced
• Where comprehensive reporting of all
reporting
Exploration Results is not practicable,
representative reporting of both low
and high grades and/or widths should
be practiced to avoid misleading
reporting of Exploration Results.
Other
• Other exploration data, if meaningful
substantive
and material, should be reported
exploration
including (but not limited to):
data
geological observations; geophysical
survey results; geochemical survey
results; bulk samples – size and
method of treatment; metallurgical
test results; bulk density,
groundwater, geotechnical and rock
characteristics; potential deleterious
or contaminating substances.
Further work
• The nature and scale of planned
further work (eg tests for lateral
extensions or depth extensions or
large-scale step-out drilling).
• Diagrams clearly highlighting the
areas of possible extensions, including
the main geological interpretations
and future drilling areas, provided this
information is not commercially
sensitive.
• No drilling or rock chip sampling
undertaken- not relevant.
• See Figure 1 for location of samples
• Not relevant- but al reported samples
taken are presented.
• Project has no previous information
reported other than stream sediment
samples.
• Dalaroo will be conducting
geochemical sampling over the entire
tenement area to validate/confirm the
GEUS sampling results. This is
expected to include stream
sediments, soil sediments where soils
horizons are present and rock chip
and float sampling.
• Dalaroo is also expecting to undertake
auger drilling of alluvial material
deposited around lakes that have
been noted from the site inspection
by the Vendor.