Option Secured on Blue Lagoon Zr-Nb-REE Project in Greenland
Released
Released
Announcement PDF
ASX ANNOUNCEMENT:
ASX: DAL
20 February 2025
Dalaroo Secures Option on Blue Lagoon Zirconium, Niobium and
Rare Earth Project in Greenland
__________________________________________________________________________________
Highlights
•
Binding Heads of Agreement executed for an Option to acquire 100% of Blue Lagoon
Zirconium-Niobium-Rare Earth Element (REE) Project, (MEL 2022-07), located in the Gadar
Province of Greenland.
•
The USGS reports Greenland has the third highest reserves of REE in the western world,
following US and Australia respectively, which has significance given current geopolitical
dynamics and security of supply chain concerns.
•
President Trump’s recent interest in Greenland as a source of critical resources and its
strategic location highlights the growing importance Greenland has for critical metals and
their ownership.
•
The Project has been historically sampled as part of a regional stream sediment exploration
undertaken by the Greenland and Denmark Geological Society (‘GEUS”) for uranium in
1979. Dalaroo is planning a program of systematic exploration to seek to report the
historical results on the Project in accordance with the JORC Code 2012.
•
Project has similar geochemical anomaly footprint to the Kvanefjeld (ASX: ETM Energy
Transition Metals) and Kringlerne/Tanbreez (NASDAQ: CRML Critical Metals Corp) multielement deposits in South Greenland, showing enrichment in critical minerals and high
value LREE elements from regional stream sediment sampling:
o Up to 0.93% Zirconium (Zr)
o Up to 320 ppm in Niobium (Nb)
o Up to 520 ppm in Neodymium (Nd)
•
Sampling has not returned any elevated radioactive elements, which is significant given the
current Greenland Government ban on any activities related to mining if uranium
concentrations are over 100ppm.
•
Project sits on the westernmost part of the highly prospective Gadar Block alkaline
intrusives belt in SW Greenland. This belt hosts significant advanced critical metals-REE
deposits.
•
Project area contains potential bulk tonnage options from beach-like deposits of weathered
granitic rock, providing potential low-cost options for separation and the planned focus for
preliminary work.
__________________________________________________________________________________
Dalaroo Metals Ltd (ASX: DAL, “Dalaroo” or “Company”) is pleased to advise that it has entered into a binding
heads of agreement (“Agreement”) with Ox Resources Pty Ltd (“Vendor”) to potentially acquire the Zr-Nb-REE
Blue Lagoon Project (tenement MEL 2022-07) (“Project”) located in the Gadar Province of South Greenland
(refer Figure 1 and 3). The Project has been historically sampled as part of a regional stream sediment program
undertaken by the Greenland and Denmark Geological Society (‘GEUS”) for uranium exploration in 1979.
Dalaroo MD & CEO, Mike Brown commented “We are very excited to have secured this Option on the Blue
Lagoon REE-Nb-Zr Project in Southwest Greenland. Regional stream sampling has indicated significant LREE
anomalies and other critical metals that have both similar tenor to the geochemical footprint and geological
setting of three other REE deposits in South Greenland. We see this as a strategic play on two levels; firstly,
exposure to high demand commodities such as REE, niobium and zirconium and secondly, exposure to a highly
prospective and unexplored jurisdiction that is getting significant attention with respect to the vital role
Greenland could play in providing critical metals in the future. With the Project being located on the coast with
ice free water we are looking forward to getting onto the ground to commence exploration activities.”
Figure 1: Project location, GEUS regional stream sediment location and neodymium assay results.
TABLE 1: BLUE LAGOON PROJECT EXPLORATION RESULTS
The Project area was historically sampled by GEUS in 1979 for uranium as part of a regional stream sediment
program targeting uranium and other metals in South and West Greenland between 1978 and 1993.
Selected elements from all stream sediment samples taken within MEL 2022-07 as part of GEUS regional stream sediment
program. Source: GEUS web portal. INAA=Instrumental Nuclear Activation Analysis, XCD=Xray Crystal Diffraction
REE
LREE
Sample_ID
281028
281030
281031
281032
282850
282851
282852
282853
282854
Analysis
type
La
(ppm)
HREE
Ce
(ppm)
Nd
(ppm)
Sm
(ppm)
Eu
(ppm)
Tb
(ppm)
Yb
(ppm)
Lu
(ppm)
Th
(ppm)
U
(ppm)
Nb
(ppm)
Zr
(ppm)
270
410
200
35
2.8
4.7
14
1.3
21
5.6
129
2059
600
870
360
65
4.7
11
39
5
51
18
294
1063
590
990
410
65
4.2
11
31
3
61
14
279
5054
220
290
160
28
2.7
4.4
18
2.4
22
7.1
193
3773
710
1300
520
79
12
12
60
5.2
88
14
326
9360
550
870
390
66
5
9.7
39
4.2
45
11
13
246
118
3520
780
1800
500
80
5.9
11
44
4.7
64
10
126
3286
660
1400
500
75
9.9
11
49
5.3
73
18
200
7240
INAA
INAA
INAA
INAA
INAA
INAA
INAA
INAA
INAA
INAA
XCD
XCD
Figure 2: Contour maps of regional geochemical distribution for neodymium (Nd) and terbium (Tb) and
zirconium (Zr) and niobium (Nb) showing elevated responses over Gadar alkaline intrusives and location of the
Blue Lagoon project (MEL 22002-07). Source: GEUS web portal.
The results on a local and regional scale indicate significant enrichment in Nb-Zr-Hf and LREEs, in particular Nd.
Notably the tenor of these anomalies is similar to anomalies that coincide with the 3 other multi metallic
deposits within the Gadar intrusives belt 120-140km to the northwest of Blue Lake (Kvanefjeld,
Kringlerne/Tanbreez and Motzfeldt) (see Figure 2). Analysis was not done for the full suite of REE but displays
marked enrichment in the magnetic LREE elements, such as Neodymium, Samarium, Terbium (see Table 1).
Importantly there appears to be no enrichment in radioactive elements Uranium and Thorium.
GEOLOGICAL SETTING
The Paleoproterozoic Province in South Greenland is a cratonic rift province consisting of sandstones, and a
variety of alkaline volcanic and plutonic igneous rocks. The Mesoproterozoic Gadar alkaline intrusive
complexes intruded into this rift setting. The MEL 2022-07 exploration licence lies within the Helene granite
unit, which forms the westernmost exposure of the large Nunarsuit Complex. The Nunarsuit Complex is the
largest and amongst the youngest of numerous Gardar age intrusions in South Greenland. It is comprised of
alkaline syenite and granitic units (see Figure 3). The Project lies within the mapped Helene alkaline granite,
which forms the westernmost unit of the Nunarsuit Complex. It is bounded to the east by an extensive alkalic
syenite.
Figure 3: SW Greenland Geology and mineral deposits and occurrences. Blue Lagoon association with Gadar Block
alkaline intrusives with a similar setting to other major multi-metallic deposits. Modified from Steenfelt et al 2016
DISCUSSION
The western anomaly seen in all four contouring images presented Figure 2 is spatially associated to the Helene
granitic unit, and to a lesser extent the alkalic syenite to the east of it that is mapped on the western part of
the peninsula by GEUS as part of the Gadar intrusive (see Figure 3). Prospecting visits to the property by the
Vendor have indicated the presence of significant colluvial and alluvial material by streams into and
surrounding the Blue Lake in the form of beaches and scree slopes (see Figs 4 and 5).
Weathering and production of this erosional material is reported as being along crystal boundaries, resulting
in whole crystal particles from coarse feldspar crystals down to finer grained mafic and heavy minerals. There
is no development of in situ clay or soil. At this stage it is unknown if the alkalic granite, or potential pegmatites,
dikes or intrusive units within the granite are the source of the multi-element anomalies.
CAUTIONARY STATEMENT:
•
•
•
•
•
•
The historical results included in this announcement have not been reported in accordance with the
JORC Code 2012;
A Competent Person has not done sufficient work to disclose the historical results in accordance with
the JORC Code 2012;
Information collected by the Vendor has not involved systematic sampling nor has it been able to be
verified or located and on this basis the CP does not consider it reliable to report under either
JORC2012 or as historical foreign mineralisation and these results have not been referenced.
It is possible that following further evaluation and/or exploration work that the confidence in the prior
reported historical results may be reduced when reported under the JORC Code 2012;
nothing has come to the attention of the Company that has caused it to question the accuracy or
reliability of the GEUS’s previous historical results; but
The Company has not independently validated the GEUS’s previous historical results and therefore is
not to be regarded as reporting, adopting or endorsing the historical results.
CONCLUSIONS
The large and highly anomalous REE and associated element geochemical anomaly over the Project area
provides a compelling multi-commodity exploration target. The Vendor has identified the presence of potential
bulk tonnage ‘placer’ type deposits from nearby in-situ weathered granite. This is characterised by highly
anomalous LREE and Nb signature, which is very similar to the geochemical signature that coincides with 3
other significant REE deposits in South Greenland associated with Gadar Block alkaline intrusives. Unlike these
deposits there appears to be no associated U mineralisation and only low Th signature. This is significant given
the current ban on mining projects in Greenland with U concentrations of over 100ppm.
NEXT STEPS AND INDICATIVE NEWSFLOW
Initially Dalaroo is planning to focus on alluvial and colluvial deposits around the “Blue Lake” where weathering
of the alkaline granite might have favourably deposited heavy minerals that are likely to host the REE and
associated elements. Work will be done to characterize the geochemistry, mineralogy, distribution and volume
of these as a potential bulk tonnage deposit. This would have the very significant benefit of not requiring any
hard rock mining. Separating the fine heavy mineral fraction from the coarse-grained weathered feldspar
crystals would be very simple and low cost, which could provide significant cost advantages. Extending the
exploration into the surrounding granite bodies via reconnaissance mapping and sampling will form a key part
of the initial program.
The exploration season in this part of Greenland is more extensive than most of Greenland, running from May
to September each year.
Dalaroo is fully funded to complete the aforementioned work program in the upcoming exploration season
from its existing working capital. Funds directed to exploration at the Blue Lagoon Project in Greenland will
not impact on exploration at DAL’s existing projects.
Figure 4: Colluvial and alluvial weathering accumulations from granitic country rock
surrounding Blue Lake. Source: Vendor
Figure 5: Coarse crystal rich 'beach' at Blue Lake. Source: Vendor.
STRATEGIC RATIONALE
Dalaroo recognizes the strategic importance of acquiring a rare earth, niobium, and zirconium project in
Greenland, especially in light of recent geopolitical developments. President Donald Trump's renewed interest
in purchasing Greenland underscores the island's current reserves and future potential for hosting critical
minerals, which are essential for advanced technologies and national security. This geopolitical focus not only
highlights Greenland's resource potential but also emphasizes the urgency for secure and diversified supply
chains. By investing in Greenland's mineral projects, Dalaroo is positioning itself at the forefront of supplying
these in-demand resources, aligning with global efforts to reduce dependence on single-source suppliers and
contributing to the advancement of technology and defence sectors worldwide.
TENEMENT DETAILS
The Blue Lagoon Project consists of one mineral exploration tenement, MEL 2022-07, granted on 20 May 2022
and valid for 5 years. Exploration licences can be extended for additional 5-year periods.
Lic code
Owner name
Applic date Applic code Grant_date Lic_type
Expiry date Lic status
Lic type id
Mineral
Exploration
Ox Resources Pty
MEL2022-07 Ltd Greenland
2021-12-16 M-MLSA-325 2022-05-20 Licence (MEL) 2027-05-19 Active License 268
There are no pre-existing royalties on the Project and the Vendor is the sole and 100% owner of the tenement.
HEADS OF AGREEMENT TERMS
The key terms of the Agreement are as follows:
• An exclusive Option to acquire a 100% legal and beneficial interest in the Project (“Option”);
• In consideration for the Option, Dalaroo agrees to pay the Vendor an Option fee of A$50,000;
• The Option is exercisable by Dalaroo at any time prior to the Option expiring on 31 December 2025;
• If Dalaroo exercises its Option (“Completion”) on or before 31 December 2025 then it agrees to pay the
Vendor:
o A$150,000 in cash;
o Reimbursement of exploration expenditure incurred by the Vendor in the two years prior to the
execution date of the Agreement, up to a maximum of $150,000, in either cash or shares in Dalaroo,
at the election of Dalaroo. If paid in shares the shares will be valued on the 5-day VWAP of Dalaroo
prior to the date of issue, subject to obtaining shareholder approval for the issue of the shares.
o The Vendor will, subject to shareholder approval, be entitled to the following shares on the
achievement of the relevant milestones below:
A$125,000 of shares subject to Dalaroo announcing a Ground Penetrating Radar Program
determining the volume of loose material or the first drilling program on the Project within 24
months from Completion;
A$150,000 of shares subject to Dalaroo announcing a Maiden Mineral Resource Estimate on the
Project within 24 months form Completion, at a deemed issue price equal to the lower of the 5day VWAP prior to the date of issue or A$0.05 per share; and
A$175,000 of shares subject to Dalaroo releasing a Maiden Scoping Study on the Project within
24 months from Completion, at a deemed issue price equal to the lower of the 5-day VWAP
prior to the date of issue or $0.10 per share,
(together, the “Milestone Shares”).
• The ‘Conditions Precedent’ include Dalaroo:
o undertaking exploration expenditure of not less than A$150,000 on the Project;
o Completing legal and technical due diligence on the Project to the satisfaction of Dalaroo;
o obtaining all regulatory approvals or waivers pursuant to the ASX Listing Rules, Corporations Act or
any other applicable law to the allow the transaction to occur;
obtaining a waiver from ASX Listing Rule 7.3.4 to permit the issue of the Milestone Shares outside
the 3-month period for the date that shareholder approval is obtained;
o obtaining shareholder approval for the purposes of ASX Listing Rule7.1 for the issue of the Milestone
Shares; and
o obtaining all third-party approvals and consents necessary to complete the transaction.
Post Completion the title and risk in the Project will pass to Dalaroo and it is obligated to spend A$500,000
on exploration expenditure on the Project within the first 12 months and a further A$500,000 in the second
12 months after that.
The Vendor, nor its associated parties, are permitted to apply for any new tenements with 5 kilometres of
the Project during the period of the Agreement.
o
•
•
The Company has entered into an agreement with Bullion Ventures Pty Ltd, an unrelated party, to receive a
‘finders fee’ of 4% of the consideration value paid to the Vendor, which is payable in either cash or shares
(based on the 15-day VWAP prior to Completion and subsequent respective milestones), at each increment of
the consideration value being paid by Dalaroo to the Vendor. Where this fee is payable in shares it will be
subject to shareholder approval.
Furthermore, upon execution of the Agreement, Dalaroo has also agreed to issue Rimbal Pty Ltd (or its
nominees), an unrelated party, a ‘facilitator fee’ of A$15,000 worth of shares at a deemed issue price of
A$0.026 (being, the end of day trading price on 17 February 2025). The resulting 576,923 shares will be issued
from Dalaroo’s existing Listing Rule 7.1 capacity.
The acquisition of the Project from the Vendor will not constitute a change in the nature and scale of the
Company’s activities as the transaction represents an increase of less than 25% to the Company’s total
consolidated assets, total equity and its budgeted expenditure for the next 12 months. For this reason, Dalaroo
will not seek shareholder approval to the acquisition.
ENDS
Authorised for release to the ASX by the Board of Dalaroo Metals Ltd.
For more Information:
Please visit our website for more information: www.dalaroometals.com.au
Michael Brown, Managing Director on +61 466 856 061
HISTORICAL SAMPLING AND ASSAYING RESULTS
The historical results on the Project reported were part of a regional stream sediment program undertaken by
the Greenland and Denmark Geological Society (‘GEUS”). In respect of the previous historical results from the
Project, the Company confirms the following:
• The historical samples within the Project were collected in 1979 and regionally from 1978-1993, and the
results are publicly available on the GEUS web portal;
•
•
•
https://maps.greenmin.gl/geusmap/?mapname=greenland_portal&lang=en&lang=en#baslay=&optlay=&exte
nt=2812222.222222222,5714583.333333334,3632222.222222222,10185416.666666666&layers=g250_topographic_m
ap_utm24n
As these samples were taken historically by GEUS and predate the JORC CODE 2012 they may not conform
to JORC CODE2012.
GEUS undertook a comprehensive calibration and compilation of all stream sediment sampling and
analysis for samples taken between 1979 and 1993 1. The results have not been validated by the Company’s
Competent Person, nor has the Competent Person done sufficient work to disclose in accordance with
JORC CODE 2012. However, given the samples were taken by GEUS, and subsequently calibrated and
compiled, and nothing has caused any reason to doubt the accuracy and reliability of the results, they are
considered by the Competent Person to be valid and representative in the context of part of a national
geochemical database which therefore appears to establish the dataset as valid and reliable.
The CP considers that the results can be considered to be valid and representative based on the review of
sampling and conforming substantially to JORC2012 Chapter 5 Table 1 guidelines as per the following:
o Sampling methodology, density of sampling, storage, preparation and analysis discussed are
considered to be acceptable.
The samples reported are a subset of a regional stream sediment program undertaken by GEUS
from 1978-1993. All samples were collected in paper bags, which were dried in the field,
wrapped in newspaper, packed in boxes, and subsequently shipped to GGU in Copenhagen. A
total of 9 samples were collected in the Project, which is 27km2. This is sufficient density for first
pass stream sediment sampling and the location of samples is considered to give adequate and
representative coverage of the geology within the Project.
o Analysis methodology appropriate and results internally audited and validated by GEUS
The samples were dried at 600C and sieved into three grain size fractions. The < 0.1 mm fraction
has been used for analysis, the fraction from 0.1 to 1 mm has been retained in storage, while
the fraction above 1 mm has been discarded.
Samples were sieved to 100 micron and were analysed via Instrumental Neutron Activation
Analyses (INAA) by Activation Laboratories Ltd, Toronto, (“ACTLabs”) and in the case of niobium
and zirconium they were analysed at Risø National Laboratory, Roskilde, Denmark using x-ray
crystal diffraction (“XCD”). These are both suitable methodologies that were available at the
time for those type of elements.
o Sample location was based on topographical maps and air photos, which was standard practice in
1979. As such these are considered as being representative, but not specific locations, which is
adequate for first-pass regional stream sediment sampling. They have subsequentially been digitised,
which is standard industry practice. Follow-up work is planned for more exact sampling to determine
location and source of anomalous elements.
o Audit and review: GEUS dataset for South Greenland was collected over a number of years, with
different laboratories performing different analysis for different element suites and methods in
different years This entire dataset was calibrated and adapted by GEUS to make all subsets
“Compilation of data sets for a geochemical atlas of West and South Greenland based on stream sediment surveys 1977
to 1997.” GEUS, 1997-41. Agnette Steenfelt
1
•
•
•
•
•
•
statistically aligned and comparable to produce one validated dataset. This is considered to form a
valid and reliable dataset for initial exploration activity.
Samples were assayed results from 8 of 9 samples on the Project which are reported for minor and REE
elements and reported in Table 1. One sample, 282852, was not assayed by the same methods as the other
samples and as such isn’t reported for all elements.
There have been no more recent results or data produced that are considered to be valid relevant to
understanding the previous historical results on the Project. The Vendor has visited the Property and
undertaken minor prospecting activity. This has not been systematic, the sampling techniques and
locations have not been provided, and assay procedures and protocol have not been described. As such
the CP does not consider them to be relevant or valid without considerably more work. These results are
not reported by the Company.
The Company intends to validate the sampling through more extensive geochemical program that will
include sampling streams, placer deposits, colluvial deposits and bedrock that is complaint and reported
with JORC CODE 2012 to gain a clearer understanding of the geochemical nature of the reported
anomalous elements in the GEUS program over the Project.
Dalaroo is planning to focus on alluvial and colluvial deposits around the “Blue Lake” where weathering of
the alkaline granite might have favourably deposited heavy minerals that are likely to host the REE and
associated elements. Work will be done to characterize the geochemistry, mineralogy, distribution and
volume of these as a potential bulk tonnage deposits. Extending the exploration into the surrounding
granite bodies via reconnaissance mapping and sampling will form a key part of the initial program.
The Company will seek to undertake its exploration activities in 2025 during the upcoming exploration
season in Greenland which runs from May to September.
The Company is fully funded to complete the aforementioned work program in the upcoming exploration
season from its existing working capital.
CAUTIONARY STATEMENT
•
•
•
•
•
•
•
the historical results included in this announcement have not been reported in accordance with the JORC
Code 2012;
a Competent Person has not done sufficient work to disclose the historical results in accordance with the
JORC Code 2012;
Information collected by the Vendor has not involved systematic sampling nor has it been able to be
verified or located and on this basis the CP does not consider it reliable to report under either JORC2012
or as historical foreign mineralisation and these results have not been referenced.
it is possible that following further evaluation and/or exploration work that the confidence in the prior
reported historical results may be reduced when reported under the JORC Code 2012;
nothing has come to the attention of the Company that has caused it to question the accuracy or reliability
of the GEUS’s previous historical results; but
the Company has not independently validated the GEUS’s previous historical results and therefore is not
to be regarded as reporting, adopting or endorsing the historical results.
A Competent Person’s statement is set out below.
COMPETENT PERSON
The information in this release that relate to the historical results on the Project is based on information
compiled by Dalaroo Metals Ltd and reviewed by Mr Michael Brown who is a Geologist and Member of the
AIG. Mr Brown has sufficient experience that is relevant to the style of mineralisation, the type of deposit
under consideration and to the activities undertaken to qualify as a Competent person as defined in the 2012
edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”.
Mr Brown consents to the inclusion in this report of the matters based on this information in the form and
context in which it appears.
Where reference is made to previous releases of exploration results in this announcement, the Company
confirms that it is not aware of any new information or data that materially affects the information included
in those announcements and all material assumptions and technical parameters underpinning the exploration
results included in those announcements continue to apply and have not materially changed.
FORWARD-LOOKING INFORMATION
This release may include forward-looking statements. Forward-looking statements include, but are not limited
to, statements concerning the planned exploration program and other statements that are not historical facts.
When used in this report, the words "could", "plan", "estimate", "expect", "intend", "should" and similar
expressions are forward-looking statements. Although Dalaroo believes that its expectations reflected in these
forward-looking statements are reasonable, such statements involve risks and uncertainties and no assurance
can be given that actual results will be consistent with these forward-looking statements.
CAUTIONARY NOTE
The statements and information contained in this release are not investment or financial product advice and
are not intended to be used by persons in deciding to make an investment decision. In releasing this report,
Dalaroo has not considered the objectives, financial position or requirements of any particular recipient.
Accordingly, potential investors should obtain financial advice from a qualified financial advisor prior to making
an investment decision.
Share your feedback
Discover